CISSELL

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the HAYWOOD (ATOKA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219935District 10Field 39899500CondensateGasSaveExport
Value, all time
$1.4 M
Aug 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 51 leases and 58 wells, and the rule below applies to all of them.

Discovered
1958-01-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-12-21.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 05/01/2009.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,602 bbl$535,530
GasProduction231,093 Mcf$903,349
Total$1,438,880

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.1473, -100.9139. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.14731, -100.91387 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,400 ft.

Completions filed
Jul 1975
1 of 1 wells

1 well

42-3573025919,400 ftJul 1975

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 2020196038.371.83$7,521
Jun 202001,14834.901.69$1,940
May 202001,20616.921.81$2,189
Apr 202001,14614.751.80$2,068
Mar 202001,18930.341.86$2,207
Feb 20203476049.881.98$3,201
Jan 2020091857.252.09$1,923
Dec 201901,16559.012.30$2,685
Nov 2019561,06055.302.75$6,013
Oct 20191741,10553.472.42$11,976
Sep 2019088955.052.66$2,362
Aug 201901,13253.112.30$2,609
Jul 201901,18256.272.46$2,908
Jun 201901,15352.782.49$2,872
May 201901,24558.482.74$3,412
Apr 20191821,13062.632.75$14,507
Mar 201901,19156.803.06$3,647
Feb 201901,08950.852.79$3,041
Jan 201901,23946.033.23$4,000
Dec 201801,18346.594.19$4,951
Nov 20181881,16152.934.24$14,870
Oct 201801,22861.443.40$4,173
Sep 201801,08659.543.11$3,375
Aug 201801,18459.403.07$3,631
Jul 201801,11065.142.93$3,254
Jun 2018092360.183.08$2,840
May 20181921,06765.382.90$15,648
Apr 201801,21463.842.90$3,522
Mar 201801,15761.222.79$3,224
Feb 201801,16261.782.77$3,214
Jan 201801,02962.874.01$4,126
Dec 2017039257.272.92$1,145
Nov 2017065955.423.12$2,055
Oct 20171791,03549.292.98$11,911
Sep 201701,08547.523.09$3,350
Aug 201701,14145.373.00$3,428
Jul 201701,10243.873.09$3,402
Jun 2017093642.493.09$2,890
May 201701,10045.373.26$3,590
Apr 20171911,08647.933.21$12,642
Mar 201701,38346.772.98$4,126
Feb 201701,45350.452.95$4,290
Jan 201701,57349.413.42$5,378
Dec 201601,64648.763.72$6,128
Nov 201601,59542.492.64$4,218
Oct 20160246.193.09$6
Sep 20161901,11941.553.10$11,364
Aug 201601,31541.442.92$3,846
Jul 201601,16041.622.92$3,392
Jun 201601,17645.352.69$3,159
May 201601,29642.521.99$2,580
Apr 201601,35636.561.99$2,700
Mar 201601,38133.011.79$2,478
Feb 201601,21226.472.06$2,501
Jan 20161391,31327.352.36$6,906
Dec 201501,50832.362.00$3,018
Nov 201501,60238.792.17$3,472
Oct 201501,51843.552.43$3,684
Sep 20151781,52142.992.76$11,848
Aug 201501,53140.162.87$4,398
Jul 201501,57648.152.95$4,641
Jun 201501,41556.152.88$4,079
May 201501,70255.212.96$5,030
Apr 201501,54849.822.71$4,190
Mar 201501,95842.892.93$5,746
Feb 20151971,35944.662.98$12,843
Jan 201501,49343.433.10$4,629
Dec 201401,55454.693.59$5,581
Nov 201401,66670.464.25$7,084
Oct 201401,64278.303.90$6,405
Sep 20141931,73786.164.05$23,656
Aug 201401,84789.394.04$7,453
Jul 201401,50996.564.18$6,307
Jun 201401,53298.164.74$7,257
May 201401,51594.734.73$7,161
Apr 201401,61795.944.81$7,776
Mar 201401,62895.895.06$8,232
Feb 201401,35897.406.19$8,409
Jan 201401,69990.404.86$8,258
Dec 201301,53691.824.35$6,688
Nov 201301,60888.853.74$6,011
Oct 201301,57997.423.78$5,968
Sep 20131871,253104.113.72$24,127
Aug 201301,245104.253.52$4,386
Jul 201301,470102.523.72$5,465
Jun 201301,65594.403.93$6,510
May 201301,58394.834.15$6,568
Apr 201301,52493.964.28$6,527
Mar 201301,51193.623.91$5,912
Feb 20131781,18191.233.42$20,278
Jan 201301,81891.603.42$6,217
Dec 201201,26786.773.42$4,333
Nov 201201,36686.953.62$4,952
Oct 201201,70389.383.40$5,790
Sep 20122171,60694.672.92$25,230
Aug 201201,78992.662.91$5,203
Jul 201201,89885.133.02$5,733
Jun 201201,77079.822.52$4,459
May 201201,76391.612.49$4,387
Apr 20121771,620101.652.00$21,227
Mar 201201,753105.052.22$3,895
Feb 201201,454101.102.57$3,737
Jan 201201,93098.092.73$5,277
Dec 201101,98396.873.24$6,424
Nov 201102,06295.723.31$6,828
Oct 201102,46784.983.65$9,001
Sep 2011030683.623.99$1,220
Aug 201101,55983.404.15$6,469
Jul 20111752,29494.144.52$26,837
Jun 20111762,24992.904.64$26,785
May 201102,41198.134.40$10,620
Apr 201102,199105.964.33$9,529
Mar 201102,30896.364.06$9,364
Feb 201101,44685.644.18$6,044
Jan 20111752,29486.504.59$25,664
Dec 201002,27985.734.35$9,909
Nov 201001,72580.843.80$6,547
Oct 201002,47578.103.51$8,685
Sep 201002,58772.633.98$10,295
Aug 20101822,32773.684.42$23,694
Jul 201002,37172.554.74$11,230
Jun 201002,03370.364.91$9,983
May 201001,96471.124.24$8,318
Apr 20101622,03881.694.12$21,636
Mar 20101781,56078.394.39$20,800
Feb 201001,14673.585.44$6,237
Jan 201001,86774.365.96$11,135
Dec 20093302,15771.445.48$35,404
Nov 200902,05974.593.75$7,724
Oct 200902,05872.544.11$8,459
Sep 200901,98365.543.06$6,077
Aug 200902,00667.423.22$6,456
Jul 200902,45661.133.46$8,509
Jun 200902,48366.163.90$9,671
May 20091882,78854.743.93$21,236
Apr 200902,14646.773.59$7,699
Mar 200902,63042.144.06$10,675
Feb 200902,00132.814.63$9,271
Jan 200902,19135.865.37$11,768
Dec 200801,90237.105.98$11,369
Nov 20083811,88155.496.86$34,046
Oct 200801,56375.246.92$10,819
Sep 200802,037101.767.88$16,046
Aug 20081781,583114.228.48$33,760
Jul 20083541,869131.0811.39$67,689
Jun 20085481,366131.3313.03$89,771
May 2008439634123.1711.57$61,410
Apr 2008037110.3110.45$387
Mar 20080240101.909.66$2,319
Feb 2008017892.538.77$1,561
Jan 200802590.388.21$205
Dec 200704488.337.30$321
Nov 2007010291.677.29$744
Oct 2007012282.856.92$844
Sep 20078835075.846.24$8,859
Aug 2007046369.066.39$2,958
Jul 2007023470.906.39$1,495
Jun 2007018462.007.55$1,389
May 2007022558.747.85$1,765
Apr 2007028559.617.81$2,224
Mar 2007030856.927.30$2,249
Feb 2007049155.108.22$4,034
Jan 2007050250.306.73$3,377
Dec 2006043256.656.92$2,989
Nov 2006058054.207.62$4,418
Oct 2006057454.906.01$3,452
Sep 2006054460.085.04$2,740
Aug 2006054668.717.34$4,008

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2020 — as filed, then multipliedworked
Condensate           196 bbl  × $ 38.37 =     $7,521
Gas                    0 Mcf  × $  1.83 =         $0

────────────────────────────────────────────────────
Month total                                   $7,521

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219935 is the state's own key, not one this site invented.