OLYMPUS

Operated by QUESTA ENERGY CORPORATION (P-5 684634) in the DARDEN (MORROW UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219936District 10Field 23105500CondensateGasSaveExport
Value, all time
$726 k
Aug 2006 – May 2026
Value, last 12 filed months
$19 k
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 17 leases and 23 wells, and the rule below applies to all of them.

Discovered
1982-09-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2002-03-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/2002.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition881 bbl$71,822
GasProduction159,845 Mcf$654,513
Total$726,335

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.4250, -100.2559. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.42495, -100.25595 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,700 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-2953137418,700 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 20260164106.413.05$500
Apr 2026088998.932.87$2,551
Mar 2026041989.753.15$1,320
Feb 2026039663.503.75$1,485
Jan 2026042259.138.00$3,375
Dec 2025042856.664.41$1,889
Nov 2025036458.593.93$1,429
Oct 2025039659.383.30$1,309
Sep 2025039162.743.08$1,203
Aug 2025044163.933.01$1,330
Jul 2025037066.743.32$1,227
Jun 2025030366.483.13$948
May 2025041760.553.23$1,348
Apr 2025042462.363.54$1,502
Mar 2025044667.704.27$1,904
Feb 2025040370.884.34$1,749
Jan 2025044474.324.28$1,900
Dec 2024045568.993.12$1,420
Nov 2024046269.052.20$1,016
Oct 2024052071.372.28$1,186
Sep 2024048869.612.36$1,154
Aug 2024050175.632.06$1,034
Jul 2024052579.932.15$1,127
Jun 2024055178.082.63$1,451
May 2024062878.812.20$1,381
Apr 2024032584.451.66$539
Mar 2024034680.301.55$535
Feb 2024032576.091.78$580
Jan 2024035173.023.30$1,157
Dec 2023038371.262.61$1,000
Nov 2023039177.892.81$1,098
Oct 2023041185.443.09$1,269
Sep 2023039889.042.74$1,089
Aug 2023041980.522.67$1,120
Jul 2023041574.852.64$1,096
Jun 2023043868.962.26$989
May 2023047870.622.23$1,065
Apr 2023049078.122.24$1,097
Mar 2023052472.852.39$1,254
Feb 2023050475.112.47$1,243
Jan 2023066176.533.39$2,239
Dec 2022069176.415.73$3,959
Nov 2022059585.005.65$3,359
Oct 2022063687.185.86$3,729
Sep 2022053184.888.16$4,335
Aug 2022064394.529.13$5,869
Jul 20220615101.587.54$4,638
Jun 20220622115.097.98$4,962
May 20220677109.378.43$5,709
Apr 20220632104.226.84$4,321
Mar 20220725108.885.08$3,680
Feb 202218565991.054.86$20,046
Jan 2022071581.844.54$3,244
Dec 2021075271.323.90$2,932
Nov 2021073577.435.24$3,849
Oct 2021080679.795.71$4,605
Sep 2021049369.865.35$2,638
Aug 2021071866.024.22$3,030
Jul 2021073470.783.98$2,923
Jun 2021066069.493.38$2,231
May 2021075963.483.02$2,290
Apr 2021071160.362.76$1,961
Mar 2021079761.302.72$2,165
Feb 2021075657.805.55$4,194
Jan 2021061650.412.81$1,731
Dec 2020069844.642.68$1,867
Nov 2020069838.772.71$1,889
Oct 2020074636.972.48$1,849
Sep 2020074937.091.99$1,491
Aug 2020074939.982.39$1,786
Jul 2020070938.371.83$1,294
Jun 2020069934.901.69$1,182
May 2020072016.921.81$1,307
Apr 2020069614.751.80$1,256
Mar 2020071030.341.86$1,318
Feb 2020069349.881.98$1,373
Jan 2020072357.252.09$1,515
Dec 2019073459.012.30$1,691
Nov 2019068755.302.75$1,890
Oct 2019096353.472.42$2,329
Sep 2019070655.052.66$1,876
Aug 2019073353.112.30$1,689
Jul 2019078556.272.46$1,931
Jun 2019069052.782.49$1,719
May 2019069558.482.74$1,905
Apr 2019071662.632.75$1,970
Mar 2019074056.803.06$2,266
Feb 2019068150.852.79$1,902
Jan 2019074946.033.23$2,418
Dec 2018079946.594.19$3,344
Nov 2018073852.934.24$3,127
Oct 2018073861.443.40$2,508
Sep 2018074859.543.11$2,325
Aug 2018085559.403.07$2,622
Jul 2018027765.142.93$812
Jun 2018072260.183.08$2,222
May 2018072265.382.90$2,094
Apr 2018072363.842.90$2,097
Mar 2018073361.222.79$2,043
Feb 201817465761.782.77$12,567
Jan 2018072262.874.01$2,895
Dec 2017081557.272.92$2,381
Nov 2017077655.423.12$2,420
Oct 2017072349.292.98$2,157
Sep 2017076847.523.09$2,371
Aug 2017081545.373.00$2,449
Jul 2017076343.873.09$2,356
Jun 2017054942.493.09$1,695
May 2017072245.373.26$2,356
Apr 2017081547.933.21$2,617
Mar 2017069446.772.98$2,071
Feb 2017069450.452.95$2,049
Jan 2017079249.413.42$2,708
Dec 2016080348.763.72$2,989
Nov 2016081142.492.64$2,145
Oct 2016061746.193.09$1,907
Sep 2016075241.553.10$2,332
Aug 2016078241.442.92$2,287
Jul 2016080541.622.92$2,354
Jun 2016079445.352.69$2,133
May 2016068142.521.99$1,356
Apr 2016074836.561.99$1,489
Mar 2016081633.011.79$1,464
Feb 2016078326.472.06$1,616
Jan 2016084927.352.36$2,007
Dec 2015086032.362.00$1,721
Nov 2015089038.792.17$1,929
Oct 2015053143.552.43$1,289
Sep 2015084642.992.76$2,334
Aug 2015073240.162.87$2,103
Jul 2015079948.152.95$2,353
Jun 2015089956.152.88$2,592
May 2015053255.212.96$1,572
Apr 2015060949.822.71$1,648
Mar 2015071642.892.93$2,101
Feb 2015068344.662.98$2,033
Jan 2015058043.433.10$1,798
Dec 2014071154.693.59$2,553
Nov 2014068270.464.25$2,900
Oct 2014084678.303.90$3,300
Sep 201417681786.164.05$18,469
Aug 2014083189.394.04$3,353
Jul 2014069496.564.18$2,901
Jun 2014074698.164.74$3,534
May 2014080394.734.73$3,795
Apr 2014072395.944.81$3,477
Mar 2014072495.895.06$3,661
Feb 2014059297.406.19$3,666
Jan 2014086690.404.86$4,209
Dec 2013078991.824.35$3,436
Nov 2013081088.853.74$3,028
Oct 2013082297.423.78$3,107
Sep 20130842104.113.72$3,130
Aug 20130870104.253.52$3,065
Jul 20130878102.523.72$3,264
Jun 2013080894.403.93$3,178
May 2013088694.834.15$3,676
Apr 2013087093.964.28$3,726
Mar 2013091693.623.91$3,584
Feb 2013082791.233.42$2,828
Jan 2013092191.603.42$3,150
Dec 2012090386.773.42$3,088
Nov 2012091986.953.62$3,331
Oct 201218196089.383.40$19,441
Sep 2012089594.672.92$2,612
Aug 2012084592.662.91$2,457
Jul 2012085685.133.02$2,586
Jun 2012082079.822.52$2,066
May 2012073091.612.49$1,816
Apr 20120320101.652.00$639
Mar 20120181105.052.22$402
Feb 20120407101.102.57$1,046
Jan 2012045098.092.73$1,230
Dec 2011041496.873.24$1,341
Nov 2011042495.723.31$1,404
Oct 2011036984.983.65$1,346
Sep 2011036883.623.99$1,467
Aug 2011038983.404.15$1,614
Jul 2011040994.144.52$1,848
Jun 201104392.904.64$200
May 2011039598.134.40$1,740
Apr 20110418105.964.33$1,811
Mar 2011041096.364.06$1,664
Feb 2011047485.644.18$1,981
Jan 2011040086.504.59$1,836
Dec 2010037385.734.35$1,622
Nov 2010043080.843.80$1,632
Oct 201016565678.103.51$15,188
Sep 201001,13472.633.98$4,513
Aug 20100473.684.42$18
Jul 201001,09572.554.74$5,186
Jun 2010095370.364.91$4,680
May 2010087771.124.24$3,714
Apr 2010092581.694.12$3,813
Mar 201001,00178.394.39$4,393
Feb 2010071073.585.44$3,864
Jan 2010091674.365.96$5,463
Dec 2009078771.445.48$4,316
Nov 2009073674.593.75$2,761
Oct 2009069672.544.11$2,861
Sep 2009093165.543.06$2,853
Aug 2009096267.423.22$3,096
Jul 2009090861.133.46$3,146
Jun 2009090866.163.90$3,537
May 2009075154.743.93$2,948
Apr 2009066146.773.59$2,371
Mar 2009082242.144.06$3,337
Feb 2009078932.814.63$3,655
Jan 200901,13735.865.37$6,107
Dec 200801,04837.105.98$6,264
Nov 2008050955.496.86$3,492
Oct 2008046475.246.92$3,212
Sep 20080487101.767.88$3,836
Aug 20080698114.228.48$5,921
Jul 20080634131.0811.39$7,221
Jun 20080573131.3313.03$7,468
May 20080620123.1711.57$7,176
Apr 20080620110.3110.45$6,482
Mar 20080615101.909.66$5,943
Feb 2008061292.538.77$5,368
Jan 2008064190.388.21$5,260
Dec 2007070588.337.30$5,148
Nov 2007068491.677.29$4,988
Oct 2007078182.856.92$5,406
Sep 2007078375.846.24$4,889
Aug 2007080569.066.39$5,142
Jul 2007076570.906.39$4,887
Jun 2007083462.007.55$6,295
May 2007081458.747.85$6,387
Apr 2007083059.617.81$6,478
Mar 2007088356.927.30$6,448
Feb 2007081455.108.22$6,688
Jan 2007086250.306.73$5,799
Dec 2006087956.656.92$6,081
Nov 2006090654.207.62$6,901
Oct 2006091154.906.01$5,479
Sep 2006082760.085.04$4,166
Aug 2006087568.717.34$6,422

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  164 Mcf  × $  3.05 =       $500

────────────────────────────────────────────────────
Month total                                     $500

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219936 is the state's own key, not one this site invented.