Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219974District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.1 M
Apr 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07170407
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,840 bbl$352,467
GasProduction704,076 Mcf$3,706,733
Total$4,059,201

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6666, -100.2922. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66656, -100.29219 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,854 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,854 ft.

Completions filed
Apr 2006
1 of 1 wells

1 well

42-211335254332P11,854 ftApr 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 202362074.852.64$4,641
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 20221331109.378.43$14,555
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 2021034757.805.55$1,925
Jan 202101,30650.412.81$3,670
Dec 202001,78744.642.68$4,781
Nov 202001,96838.772.71$5,327
Oct 202001,52336.972.48$3,775
Sep 202001,71337.091.99$3,411
Aug 202001,82439.982.39$4,350
Jul 202001,81438.371.83$3,311
Jun 202001,78634.901.69$3,019
May 202002,04416.921.81$3,709
Apr 202001,80614.751.80$3,259
Mar 202001,80430.341.86$3,349
Feb 202001,83949.881.98$3,642
Jan 202001,68857.252.09$3,536
Dec 201901,82159.012.30$4,196
Nov 201901,85255.302.75$5,094
Oct 201901,86653.472.42$4,513
Sep 201901,31155.052.66$3,484
Aug 201901,47853.112.30$3,406
Jul 201901,43056.272.46$3,518
Jun 2019091052.782.49$2,267
May 201911,71858.482.74$4,766
Apr 201901,64162.632.75$4,514
Mar 201921,66256.803.06$5,203
Feb 201901,35750.852.79$3,789
Jan 201901,62746.033.23$5,252
Dec 201801,48746.594.19$6,224
Nov 201801,65652.934.24$7,017
Oct 201801,80561.443.40$6,134
Sep 201802,01559.543.11$6,263
Aug 201802,09059.403.07$6,409
Jul 201802,06965.142.93$6,066
Jun 201801,76760.183.08$5,437
May 201801,65165.382.90$4,789
Apr 201802,02163.842.90$5,863
Mar 201831,84761.222.79$5,331
Feb 201821,79461.782.77$5,086
Jan 201832,09962.874.01$8,604
Dec 20171562,13557.272.92$15,172
Nov 201702,15855.423.12$6,729
Oct 201702,31949.292.98$6,919
Sep 201702,05147.523.09$6,332
Aug 201752,29645.373.00$7,125
Jul 201792,68443.873.09$8,681
Jun 201712,54942.493.09$7,912
May 201722,35445.373.26$7,773
Apr 201762,16547.933.21$7,241
Mar 2017222,28946.772.98$7,859
Feb 201702,04850.452.95$6,047
Jan 201702,32749.413.42$7,956
Dec 201602,04048.763.72$7,595
Nov 201601,86642.492.64$4,934
Oct 201601,95746.193.09$6,048
Sep 201601,98741.553.10$6,161
Aug 201602,01741.442.92$5,898
Jul 201601,74441.622.92$5,100
Jun 201602,41945.352.69$6,497
May 201601,96142.521.99$3,904
Apr 201601,93036.561.99$3,843
Mar 201602,06633.011.79$3,706
Feb 201602,01626.472.06$4,160
Jan 20161682,33427.352.36$10,113
Dec 201502,20032.362.00$4,403
Nov 201502,22238.792.17$4,816
Oct 201502,35343.552.43$5,710
Sep 201502,28542.992.76$6,303
Aug 201502,33640.162.87$6,710
Jul 201502,32348.152.95$6,841
Jun 201502,23756.152.88$6,449
May 201502,37355.212.96$7,013
Apr 201572,33149.822.71$6,658
Mar 201502,76642.892.93$8,117
Feb 201502,38344.662.98$7,092
Jan 201502,06743.433.10$6,409
Dec 201402,51554.693.59$9,032
Nov 201402,41870.464.25$10,281
Oct 201402,56278.303.90$9,994
Sep 201402,44986.164.05$9,907
Aug 201402,86389.394.04$11,553
Jul 201402,90296.564.18$12,129
Jun 201402,79898.164.74$13,254
May 201402,95494.734.73$13,962
Apr 201402,73395.944.81$13,143
Mar 20142002,24095.895.06$30,505
Feb 201401,52397.406.19$9,430
Jan 201401,95590.404.86$9,503
Dec 2013039391.824.35$1,711
Nov 201302,19288.853.74$8,194
Oct 201302,87597.423.78$10,866
Sep 201302,859104.113.72$10,629
Aug 201313,001104.253.52$10,676
Jul 201313,062102.523.72$11,486
Jun 201302,99094.403.93$11,761
May 201343,00394.834.15$12,839
Apr 201332,83393.964.28$12,414
Mar 201312,91593.623.91$11,500
Feb 201342,39891.233.42$8,566
Jan 201343,99591.603.42$14,029
Dec 20120086.773.42$0
Nov 201202,38586.953.62$8,646
Oct 201203,04989.383.40$10,366
Sep 201202,96794.672.92$8,659
Aug 201243,16792.662.91$9,581
Jul 201203,27385.133.02$9,887
Jun 201223,22079.822.52$8,271
May 201223,29691.612.49$8,385
Apr 201203,231101.652.00$6,452
Mar 201203,191105.052.22$7,091
Feb 201202,877101.102.57$7,395
Jan 20121633,37698.092.73$25,219
Dec 201103,39696.873.24$11,002
Nov 201103,17195.723.31$10,500
Oct 201103,48684.983.65$12,719
Sep 201103,39983.623.99$13,548
Aug 201103,28883.404.15$13,643
Jul 201103,57194.144.52$16,131
Jun 201103,37192.904.64$15,641
May 20111513,56498.134.40$30,516
Apr 201103,354105.964.33$14,534
Mar 201103,23096.364.06$13,105
Feb 201102,36185.644.18$9,869
Jan 201103,63086.504.59$16,657
Dec 201003,73985.734.35$16,256
Nov 201003,79180.843.80$14,388
Oct 201003,92978.103.51$13,786
Sep 20101773,92072.633.98$28,455
Aug 201003,95073.684.42$17,456
Jul 201003,92672.554.74$18,595
Jun 201004,09870.364.91$20,123
May 201004,29971.124.24$18,207
Apr 201004,15281.694.12$17,117
Mar 20101844,35378.394.39$33,528
Feb 201003,70273.585.44$20,148
Jan 201004,14374.365.96$24,709
Dec 200904,06571.445.48$22,291
Nov 200904,32474.593.75$16,221
Oct 200904,63772.544.11$19,059
Sep 200904,57065.543.06$14,006
Aug 200904,43667.423.22$14,277
Jul 20091774,29261.133.46$25,690
Jun 200904,25866.163.90$16,585
May 200904,48454.743.93$17,603
Apr 200904,27946.773.59$15,351
Mar 200904,52842.144.06$18,379
Feb 20091784,23632.814.63$25,466
Jan 200904,73835.865.37$25,448
Dec 200804,44637.105.98$26,574
Nov 200804,80155.496.86$32,937
Oct 200805,03075.246.92$34,818
Sep 20081724,929101.767.88$56,329
Aug 200805,369114.228.48$45,545
Jul 200805,747131.0811.39$65,455
Jun 200805,647131.3313.03$73,595
May 20081906,124123.1711.57$94,283
Apr 200806,115110.3110.45$63,931
Mar 200806,106101.909.66$59,009
Feb 20081755,77192.538.77$66,808
Jan 200806,01690.388.21$49,366
Dec 200707,20588.337.30$52,611
Nov 200707,16791.677.29$52,260
Oct 20073727,67982.856.92$83,974
Sep 200707,59475.846.24$47,418
Aug 20071768,11469.066.39$63,986
Jul 20071798,52070.906.39$67,116
Jun 200708,35062.007.55$63,030
May 200709,05758.747.85$71,064
Apr 200708,85359.617.81$69,099
Mar 200709,77056.927.30$71,340
Feb 200709,01855.108.22$74,092
Jan 200719010,62150.306.73$81,003
Dec 2006011,58656.656.92$80,157
Nov 200619211,95854.207.62$101,496
Oct 200619213,06054.906.01$89,081
Sep 20065213,90560.085.04$73,166
Aug 200618016,21368.717.34$131,370
Jul 2006014,86969.376.34$94,311
Jun 200619322,32166.286.38$155,287
May 200673930,77066.016.42$246,479
Apr 2006020,40364.397.36$150,176

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2023 — as filed, then multipliedworked
Condensate            62 bbl  × $ 74.85 =     $4,641
Gas                    0 Mcf  × $  2.64 =         $0

────────────────────────────────────────────────────
Month total                                   $4,641

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219974 is the state's own key, not one this site invented.