WILLIS "A"

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219981District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.6 M
Apr 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-02170725
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,034 bbl$233,976
GasProduction386,895 Mcf$2,346,494
Total$2,580,471

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6609, -100.2981. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66091, -100.29810 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,900 ft.

Completions filed
Apr 2006
1 of 1 wells

1 well

42-211334874418P11,900 ftApr 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202362085.443.09$5,297
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018038446.594.19$1,607
Nov 2018037252.934.24$1,576
Oct 2018038461.443.40$1,305
Sep 2018037259.543.11$1,156
Aug 2018038459.403.07$1,178
Jul 2018038465.142.93$1,126
Jun 2018037260.183.08$1,145
May 2018038465.382.90$1,114
Apr 2018037263.842.90$1,079
Mar 2018038461.222.79$1,070
Feb 2018034761.782.77$960
Jan 2018038462.874.01$1,540
Dec 2017038457.272.92$1,122
Nov 2017037255.423.12$1,160
Oct 2017038449.292.98$1,146
Sep 2017037247.523.09$1,148
Aug 2017038445.373.00$1,154
Jul 2017038443.873.09$1,186
Jun 2017037242.493.09$1,148
May 2017038445.373.26$1,253
Apr 2017037247.933.21$1,195
Mar 2017038446.772.98$1,146
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 201644048.763.72$2,145
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 2016016442.521.99$327
Apr 201601,12436.561.99$2,238
Mar 201601,27833.011.79$2,293
Feb 201601,02826.472.06$2,121
Jan 2016094927.352.36$2,244
Dec 201501,25432.362.00$2,510
Nov 201501,42238.792.17$3,082
Oct 201501,45443.552.43$3,528
Sep 201501,27042.992.76$3,503
Aug 201501,43140.162.87$4,111
Jul 201501,41548.152.95$4,167
Jun 201501,29856.152.88$3,742
May 201501,31155.212.96$3,875
Apr 201501,15949.822.71$3,137
Mar 201501,28242.892.93$3,762
Feb 201501,41444.662.98$4,208
Jan 2015074943.433.10$2,322
Dec 2014097254.693.59$3,491
Nov 2014084770.464.25$3,601
Oct 201401,00978.303.90$3,936
Sep 201401,00686.164.05$4,070
Aug 20141551,08089.394.04$18,213
Jul 201401,02896.564.18$4,297
Jun 2014049098.164.74$2,321
May 2014058194.734.73$2,746
Apr 2014070295.944.81$3,376
Mar 2014063795.895.06$3,221
Feb 201419569897.406.19$23,315
Jan 2014071090.404.86$3,451
Dec 201301,03691.824.35$4,511
Nov 2013093088.853.74$3,477
Oct 201301,00497.423.78$3,794
Sep 201301,039104.113.72$3,863
Aug 201301,143104.253.52$4,026
Jul 201301,160102.523.72$4,313
Jun 201301,19694.403.93$4,704
May 201331,16894.834.15$5,131
Apr 201311,04493.964.28$4,565
Mar 201301,10793.623.91$4,332
Feb 2013278991.233.42$2,881
Jan 201371,11791.603.42$4,461
Dec 201201,01286.773.42$3,461
Nov 201201,04286.953.62$3,777
Oct 201201,18089.383.40$4,012
Sep 201201,18794.672.92$3,464
Aug 201231,29092.662.91$4,030
Jul 201201,27085.133.02$3,836
Jun 201221,33679.822.52$3,525
May 201221,13791.612.49$3,012
Apr 201201,351101.652.00$2,698
Mar 201201,269105.052.22$2,820
Feb 201201,277101.102.57$3,282
Jan 201201,34498.092.73$3,675
Dec 201101,15896.873.24$3,752
Nov 201101,24695.723.31$4,126
Oct 201101,26284.983.65$4,604
Sep 20111811,25983.623.99$20,153
Aug 201101,23083.404.15$5,104
Jul 201101,36594.144.52$6,166
Jun 201101,33192.904.64$6,176
May 201101,43598.134.40$6,321
Apr 201101,350105.964.33$5,850
Mar 201101,06496.364.06$4,317
Feb 201101,05585.644.18$4,410
Jan 201101,45586.504.59$6,677
Dec 201001,53585.734.35$6,674
Nov 201001,59780.843.80$6,061
Oct 201001,63978.103.51$5,751
Sep 201001,64372.633.98$6,538
Aug 201001,67773.684.42$7,411
Jul 201001,57472.554.74$7,455
Jun 201001,66370.364.91$8,166
May 20101921,83771.124.24$21,435
Apr 201001,62181.694.12$6,683
Mar 201001,72878.394.39$7,584
Feb 201001,49473.585.44$8,131
Jan 201001,66874.365.96$9,948
Dec 200902,03271.445.48$11,143
Nov 200901,59474.593.75$5,980
Oct 200901,88972.544.11$7,764
Sep 200902,21865.543.06$6,798
Aug 200902,42267.423.22$7,795
Jul 200902,37361.133.46$8,221
Jun 20091742,38966.163.90$20,817
May 200902,51054.743.93$9,854
Apr 200902,44246.773.59$8,761
Mar 200902,49342.144.06$10,119
Feb 200902,31532.814.63$10,725
Jan 200902,47635.865.37$13,299
Dec 200802,76437.105.98$16,521
Nov 200802,80355.496.86$19,230
Oct 200802,97475.246.92$20,586
Sep 20081933,123101.767.88$44,240
Aug 200803,420114.228.48$29,012
Jul 200803,593131.0811.39$40,922
Jun 200803,488131.3313.03$45,458
May 20081883,912123.1711.57$68,435
Apr 200803,868110.3110.45$40,439
Mar 200803,978101.909.66$38,444
Feb 200804,08092.538.77$35,784
Jan 200804,32590.388.21$35,490
Dec 200704,55588.337.30$33,260
Nov 200704,65991.677.29$33,972
Oct 20071605,07682.856.92$48,392
Sep 200705,04875.846.24$31,521
Aug 200705,49269.066.39$35,083
Jul 20071795,84270.906.39$50,009
Jun 20073685,87562.007.55$67,163
May 200706,45958.747.85$50,679
Apr 200706,22959.617.81$48,619
Mar 200706,76756.927.30$49,412
Feb 200706,51655.108.22$53,535
Jan 200707,82050.306.73$52,604
Dec 200609,10356.656.92$62,979
Nov 200609,21754.207.62$70,210
Oct 200618610,27254.906.01$71,985
Sep 2006011,69560.085.04$58,910
Aug 200618013,98368.717.34$115,002
Jul 200618016,08369.376.34$114,497
Jun 200618417,47766.286.38$123,767
May 200619326,94966.016.42$185,887
Apr 2006031,90664.397.36$234,843

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            62 bbl  × $ 85.44 =     $5,297
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $5,297

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219981 is the state's own key, not one this site invented.