LACKEY

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the HANSFORD (MORROW, MIDDLE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220565District 10Field 38797620CondensateGasSaveExport
Value, all time
$4.6 M
Aug 2006 – May 2026
Value, last 12 filed months
$33 k
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 68 leases and 68 wells, and the rule below applies to all of them.

Discovered
1954-08-07
as the register files it
Field class
Gas
the register's own label
Between wells
2,500 ft
minimum
From a lease line
1,250 ft
minimum

A drilling unit in this field needs at least 640 acres. The field rule took effect on 1959-01-01.

The Commission's schedule remark for this field reads: SURVEY

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition50 bbl$2,003
GasProduction811,041 Mcf$4,636,293
Total$4,638,296

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2409, -101.4210. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.24092, -101.42105 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,202 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,202 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-1953174847,202 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 20260689106.413.05$2,099
Apr 2026065698.932.87$1,883
Mar 2026070389.753.15$2,214
Feb 2026069363.503.75$2,599
Jan 2026072159.138.00$5,767
Dec 2025069856.664.41$3,081
Nov 2025076758.593.93$3,012
Oct 2025079559.383.30$2,627
Sep 2025074462.743.08$2,289
Aug 2025073063.933.01$2,201
Jul 2025074466.743.32$2,467
Jun 2025088766.483.13$2,775
May 2025066760.553.23$2,156
Apr 2025057562.363.54$2,037
Mar 2025070867.704.27$3,022
Feb 2025065870.884.34$2,856
Jan 2025086374.324.28$3,693
Dec 2024079668.993.12$2,485
Nov 20240069.052.20$0
Oct 2024089771.372.28$2,046
Sep 2024079269.612.36$1,873
Aug 2024081675.632.06$1,684
Jul 2024086179.932.15$1,848
Jun 2024089478.082.63$2,355
May 2024090678.812.20$1,992
Apr 2024086884.451.66$1,440
Mar 2024091580.301.55$1,414
Feb 2024080176.091.78$1,429
Jan 2024080073.023.30$2,638
Dec 2023087471.262.61$2,282
Nov 2023082977.892.81$2,327
Oct 2023099885.443.09$3,081
Sep 2023076789.042.74$2,098
Aug 2023093680.522.67$2,502
Jul 2023095374.852.64$2,518
Jun 2023095368.962.26$2,152
May 2023095070.622.23$2,116
Apr 2023091578.122.24$2,048
Mar 2023089872.852.39$2,149
Feb 2023084475.112.47$2,081
Jan 2023085376.533.39$2,890
Dec 2022088376.415.73$5,059
Nov 2022086685.005.65$4,890
Oct 202201,06687.185.86$6,251
Sep 2022081484.888.16$6,645
Aug 2022091394.529.13$8,333
Jul 20220866101.587.54$6,531
Jun 20220948115.097.98$7,562
May 202201,066109.378.43$8,990
Apr 20220427104.226.84$2,920
Mar 20220941108.885.08$4,777
Feb 2022088391.054.86$4,290
Jan 202201,08981.844.54$4,942
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 202001,42749.881.98$2,826
Jan 202001,66157.252.09$3,479
Dec 2019086259.012.30$1,986
Nov 201901,00955.302.75$2,775
Oct 201901,57353.472.42$3,804
Sep 201901,49655.052.66$3,975
Aug 2019061053.112.30$1,406
Jul 20190056.272.46$0
Jun 2019035352.782.49$879
May 2019033258.482.74$910
Apr 20190062.632.75$0
Mar 2019031656.803.06$968
Feb 20190150.852.79$3
Jan 2019046746.033.23$1,508
Dec 2018095746.594.19$4,005
Nov 2018074452.934.24$3,153
Oct 2018051661.443.40$1,753
Sep 2018016459.543.11$510
Aug 201801,09659.403.07$3,361
Jul 201801,58865.142.93$4,656
Jun 201801,45660.183.08$4,480
May 201801,09965.382.90$3,188
Apr 201801,33663.842.90$3,875
Mar 201801,46261.222.79$4,074
Feb 201801,43061.782.77$3,956
Jan 201801,27662.874.01$5,116
Dec 201701,65557.272.92$4,835
Nov 201701,75155.423.12$5,460
Oct 201701,51349.292.98$4,514
Sep 201701,69947.523.09$5,245
Aug 201701,66545.373.00$5,002
Jul 201701,72843.873.09$5,335
Jun 201701,69142.493.09$5,221
May 201701,89345.373.26$6,178
Apr 201701,82047.933.21$5,845
Mar 201702,00546.772.98$5,982
Feb 201701,37650.452.95$4,063
Jan 2017089049.413.42$3,043
Dec 201601,71048.763.72$6,366
Nov 201601,79442.492.64$4,744
Oct 201601,74546.193.09$5,393
Sep 2016351,79441.553.10$7,017
Aug 201601,82941.442.92$5,349
Jul 201601,92441.622.92$5,626
Jun 201601,89445.352.69$5,087
May 201601,57242.521.99$3,130
Apr 2016151,46136.561.99$3,457
Mar 201601,54833.011.79$2,777
Feb 201601,93526.472.06$3,993
Jan 201602,21027.352.36$5,225
Dec 201502,23432.362.00$4,471
Nov 201502,24138.792.17$4,857
Oct 201502,28243.552.43$5,537
Sep 201502,23642.992.76$6,168
Aug 201502,39940.162.87$6,891
Jul 201502,42348.152.95$7,136
Jun 201502,09356.152.88$6,034
May 201502,28755.212.96$6,759
Apr 201502,18849.822.71$5,922
Mar 201502,26442.892.93$6,644
Feb 201502,20944.662.98$6,574
Jan 201502,50543.433.10$7,767
Dec 201402,51454.693.59$9,029
Nov 201402,38670.464.25$10,145
Oct 201402,47778.303.90$9,663
Sep 201401,59486.164.05$6,448
Aug 201401,95789.394.04$7,897
Jul 201402,43296.564.18$10,165
Jun 201402,41898.164.74$11,454
May 201402,44694.734.73$11,561
Apr 201402,39695.944.81$11,523
Mar 201402,55895.895.06$12,935
Feb 201402,46997.406.19$15,288
Jan 201402,55790.404.86$12,429
Dec 201302,55791.824.35$11,134
Nov 201302,92988.853.74$10,949
Oct 201303,11297.423.78$11,761
Sep 201302,172104.113.72$8,075
Aug 201302,569104.253.52$9,050
Jul 201302,646102.523.72$9,837
Jun 201302,61394.403.93$10,278
May 201302,43794.834.15$10,111
Apr 201302,68893.964.28$11,512
Mar 201303,10793.623.91$12,157
Feb 201302,21591.233.42$7,575
Jan 201301,87991.603.42$6,426
Dec 201201,11786.773.42$3,820
Nov 201201,13686.953.62$4,118
Oct 201202,10089.383.40$7,139
Sep 201202,15494.672.92$6,286
Aug 20120092.662.91$0
Jul 201202,50085.133.02$7,552
Jun 201202,64979.822.52$6,673
May 201202,71791.612.49$6,761
Apr 201202,819101.652.00$5,629
Mar 201203,054105.052.22$6,786
Feb 201202,774101.102.57$7,130
Jan 201203,31698.092.73$9,066
Dec 201103,37396.873.24$10,928
Nov 201103,39295.723.31$11,232
Oct 201102,49284.983.65$9,092
Sep 201103,49183.623.99$13,914
Aug 201103,52083.404.15$14,606
Jul 201104,05694.144.52$18,322
Jun 201103,02792.904.64$14,045
May 201102,87998.134.40$12,681
Apr 201102,921105.964.33$12,658
Mar 201103,82296.364.06$15,507
Feb 201103,42085.644.18$14,296
Jan 201103,81086.504.59$17,483
Dec 201003,57485.734.35$15,539
Nov 201003,58480.843.80$13,602
Oct 201003,80878.103.51$13,362
Sep 201004,37572.633.98$17,410
Aug 201004,27073.684.42$18,871
Jul 201003,62172.554.74$17,151
Jun 201004,06070.364.91$19,936
May 201004,83071.124.24$20,456
Apr 201004,80381.694.12$19,801
Mar 201003,85378.394.39$16,910
Feb 201003,87373.585.44$21,078
Jan 201004,95074.365.96$29,522
Dec 200905,06471.445.48$27,770
Nov 200904,62474.593.75$17,347
Oct 200906,40672.544.11$26,330
Sep 200905,22165.543.06$16,001
Aug 200908,81067.423.22$28,355
Jul 200904,64861.133.46$16,103
Jun 200904,68066.163.90$18,229
May 200904,93454.743.93$19,370
Apr 200904,78946.773.59$17,181
Mar 200905,43542.144.06$22,061
Feb 200904,43532.814.63$20,547
Jan 200906,72935.865.37$36,141
Dec 200807,14637.105.98$42,713
Nov 200807,07155.496.86$48,510
Oct 200808,16575.246.92$56,518
Sep 200808,410101.767.88$66,246
Aug 200808,893114.228.48$75,440
Jul 200808,473131.0811.39$96,503
Jun 200809,258131.3313.03$120,656
May 2008010,023123.1711.57$116,009
Apr 2008010,053110.3110.45$105,103
Mar 2008010,993101.909.66$106,237
Feb 2008010,86492.538.77$95,284
Jan 2008012,13890.388.21$99,601
Dec 2007012,71288.337.30$92,823
Nov 2007012,52891.677.29$91,350
Oct 2007013,75582.856.92$95,212
Sep 2007013,92975.846.24$86,975
Aug 2007015,23769.066.39$97,333
Jul 2007016,59270.906.39$105,989
Jun 2007016,68062.007.55$125,908
May 2007018,18958.747.85$142,716
Apr 2007019,10659.617.81$149,126
Mar 2007021,49656.927.30$156,963
Feb 2007021,28455.108.22$174,869
Jan 2007026,04950.306.73$175,228
Dec 2006029,45556.656.92$203,783
Nov 2006012,38154.207.62$94,312
Oct 2006036,19154.906.01$217,645
Sep 2006034,74060.085.04$174,992
Aug 200603,31768.717.34$24,347

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  689 Mcf  × $  3.05 =     $2,099

────────────────────────────────────────────────────
Month total                                   $2,099

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/220565 is the state's own key, not one this site invented.