Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224395District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Oct 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
236
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22173011
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,116 bbl$359,249
GasProduction195,914 Mcf$1,248,944
Total$1,608,193

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6257, -100.3751. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62567, -100.37512 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,779 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,779 ft.

Completions filed
Oct 2006
1 of 1 wells

1 well

42-211336807011P11,779 ftOct 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (236)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

236 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 2016141042.492.64$5,991
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 201618027.352.36$492
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 2015022756.152.88$654
May 2015022555.212.96$665
Apr 2015025249.822.71$682
Mar 2015039842.892.93$1,168
Feb 2015058944.662.98$1,753
Jan 2015020143.433.10$623
Dec 2014019054.693.59$682
Nov 2014018770.464.25$795
Oct 2014022378.303.90$870
Sep 2014022386.164.05$902
Aug 201418322189.394.04$17,250
Jul 201407796.564.18$322
Jun 2014019098.164.74$900
May 2014023794.734.73$1,120
Apr 2014031195.944.81$1,496
Mar 2014035095.895.06$1,770
Feb 2014025897.406.19$1,598
Jan 2014022590.404.86$1,094
Dec 2013017091.824.35$740
Nov 2013025488.853.74$950
Oct 2013024197.423.78$911
Sep 20130282104.113.72$1,048
Aug 20130306104.253.52$1,078
Jul 20130371102.523.72$1,379
Jun 2013042694.403.93$1,676
May 2013050994.834.15$2,112
Apr 2013054493.964.28$2,330
Mar 201318055893.623.91$19,035
Feb 2013038791.233.42$1,324
Jan 2013049291.603.42$1,683
Dec 2012063986.773.42$2,185
Nov 201217963886.953.62$17,877
Oct 20121262089.383.40$3,180
Sep 2012054494.672.92$1,588
Aug 2012066292.662.91$1,925
Jul 2012056785.133.02$1,713
Jun 2012046479.822.52$1,169
May 2012048891.612.49$1,214
Apr 20120624101.652.00$1,246
Mar 20120461105.052.22$1,024
Feb 20120614101.102.57$1,578
Jan 2012065198.092.73$1,780
Dec 2011083796.873.24$2,712
Nov 2011015695.723.31$517
Oct 2011052584.983.65$1,915
Sep 2011062483.623.99$2,487
Aug 201117867283.404.15$17,634
Jul 2011076594.144.52$3,456
Jun 2011073192.904.64$3,392
May 2011087098.134.40$3,832
Apr 20110795105.964.33$3,445
Mar 2011097996.364.06$3,972
Feb 2011074185.644.18$3,097
Jan 20111871,03086.504.59$20,902
Dec 201001,06585.734.35$4,630
Nov 2010099280.843.80$3,765
Oct 201001,11278.103.51$3,902
Sep 201001,11972.633.98$4,453
Aug 201001,08673.684.42$4,799
Jul 201001,09572.554.74$5,186
Jun 201001,04070.364.91$5,107
May 20101681,17871.124.24$16,937
Apr 201001,10181.694.12$4,539
Mar 201001,19878.394.39$5,258
Feb 201001,03573.585.44$5,633
Jan 201001,16574.365.96$6,948
Dec 20091781,19371.445.48$19,258
Nov 200901,37474.593.75$5,155
Oct 200901,14872.544.11$4,719
Sep 200901,29865.543.06$3,978
Aug 200901,54967.423.22$4,985
Jul 20091821,61661.133.46$16,724
Jun 200901,58066.163.90$6,154
May 200901,67154.743.93$6,560
Apr 200901,67946.773.59$6,023
Mar 200901,82042.144.06$7,387
Feb 20091851,70132.814.63$13,951
Jan 200901,77235.865.37$9,517
Dec 200801,99337.105.98$11,912
Nov 20081821,94955.496.86$23,470
Oct 200802,04975.246.92$14,183
Sep 200802,138101.767.88$16,841
Aug 200802,368114.228.48$20,088
Jul 20081872,422131.0811.39$52,097
Jun 200802,326131.3313.03$30,314
May 200802,566123.1711.57$29,700
Apr 20081872,626110.3110.45$48,082
Mar 200802,424101.909.66$23,426
Feb 200802,22192.538.77$19,479
Jan 20081832,58990.388.21$37,784
Dec 200702,97088.337.30$21,687
Nov 20071803,28991.677.29$40,483
Oct 200703,93582.856.92$27,238
Sep 20071874,28375.846.24$40,926
Aug 20071784,69369.066.39$42,271
Jul 200704,83370.906.39$30,873
Jun 20073774,91162.007.55$60,444
May 20071885,38558.747.85$53,295
Apr 200704,34959.617.81$33,945
Mar 20073634,92456.927.30$56,617
Feb 200705,21655.108.22$42,855
Jan 20071827,68450.306.73$60,844
Dec 20061879,58956.656.92$76,934
Nov 200655513,82454.207.62$135,385
Oct 200618931,95054.906.01$202,517

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2016 — as filed, then multipliedworked
Condensate           141 bbl  × $ 42.49 =     $5,991
Gas                    0 Mcf  × $  2.64 =         $0

────────────────────────────────────────────────────
Month total                                   $5,991

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/224395 is the state's own key, not one this site invented.