KIKER

Operated by MMGL TXPH, LLC (P-5 101619) in the ALLISON PARKS (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224676District 10Field 018104102 tax incentive programmesCondensateGasSaveExport
Value, all time
$7.0 M
Sep 2006 – May 2026
Value, last 12 filed months
$46 k
at the published price for each month
Months reported
237
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 79 leases and 79 wells, and the rule below applies to all of them.

Discovered
1982-03-04
as the register files it
Field class
Gas
the register's own label
Between wells
660 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-06-27.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-03-26180731
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition19,686 bbl$1,307,125
GasProduction970,446 Mcf$5,732,797
Total$7,039,922

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6388, -100.0783. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.63878, -100.07831 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,820 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,820 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-21133587150613,820 ftSep 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (237)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

237 months

May 20260774106.413.05$2,357
Apr 202601,24898.932.87$3,581
Mar 2026075589.753.15$2,378
Feb 202601,02863.503.75$3,855
Jan 2026091159.138.00$7,286
Dec 202501,08956.664.41$4,806
Nov 202501,07158.593.93$4,205
Oct 202501,07059.383.30$3,536
Sep 202501,01562.743.08$3,123
Aug 202501,12263.933.01$3,383
Jul 202501,10666.743.32$3,667
Jun 202501,10766.483.13$3,463
May 2025096960.553.23$3,132
Apr 2025074662.363.54$2,643
Mar 202501,13267.704.27$4,832
Feb 202501,21770.884.34$5,283
Jan 202501,06474.324.28$4,553
Dec 202406668.993.12$206
Nov 2024010769.052.20$235
Oct 2024057071.372.28$1,300
Sep 2024083969.612.36$1,984
Aug 202401,20475.632.06$2,485
Jul 202401,35679.932.15$2,911
Jun 202401,26378.082.63$3,327
May 202401,30278.812.20$2,862
Apr 202401,12884.451.66$1,872
Mar 202401,31980.301.55$2,038
Feb 2024095376.091.78$1,700
Jan 2024072673.023.30$2,394
Dec 202301,08371.262.61$2,827
Nov 2023098877.892.81$2,774
Oct 2023941,05385.443.09$11,282
Sep 202301,01289.042.74$2,768
Aug 202331,13780.522.67$3,281
Jul 2023196274.852.64$2,616
Jun 2023196468.962.26$2,246
May 202301,32070.622.23$2,940
Apr 202321,09678.122.24$2,609
Mar 202321,20372.852.39$3,025
Feb 202321,36775.112.47$3,521
Jan 202311,14376.533.39$3,949
Dec 202201,44176.415.73$8,256
Nov 202201,14485.005.65$6,459
Oct 202211,44187.185.86$8,537
Sep 202221,18384.888.16$9,827
Aug 2022199794.529.13$9,194
Jul 20222937101.587.54$7,270
Jun 20221719115.097.98$5,851
May 20221829109.378.43$7,100
Apr 202211,220104.226.84$8,446
Mar 202241,485108.885.08$7,974
Feb 2022680091.054.86$4,433
Jan 2022192981.844.54$4,297
Dec 2021201,21671.323.90$6,168
Nov 2021175677.435.24$4,036
Oct 202111,06579.795.71$6,165
Sep 202111,02469.865.35$5,549
Aug 2021175866.024.22$3,265
Jul 2021167970.783.98$2,775
Jun 2021157169.493.38$2,000
May 2021165163.483.02$2,028
Apr 2021065660.362.76$1,810
Mar 2021156961.302.72$1,607
Feb 2021021957.805.55$1,215
Jan 2021161150.412.81$1,767
Dec 20201360044.642.68$2,186
Nov 20201259438.772.71$2,073
Oct 2020051836.972.48$1,284
Sep 2020057037.091.99$1,135
Aug 2020059939.982.39$1,429
Jul 2020155238.371.83$1,046
Jun 2020058834.901.69$994
May 2020058216.921.81$1,056
Apr 2020856014.751.80$1,128
Mar 20202750330.341.86$1,753
Feb 2020050749.881.98$1,004
Jan 2020053257.252.09$1,114
Dec 2019054459.012.30$1,254
Nov 2019054755.302.75$1,505
Oct 2019059653.472.42$1,441
Sep 2019158955.052.66$1,620
Aug 20192567753.112.30$2,888
Jul 2019069056.272.46$1,697
Jun 201901,09152.782.49$2,718
May 201901,07958.482.74$2,957
Apr 2019056862.632.75$1,562
Mar 2019177656.803.06$2,433
Feb 2019173050.852.79$2,089
Jan 2019162146.033.23$2,051
Dec 2018070746.594.19$2,959
Nov 2018060752.934.24$2,572
Oct 2018069061.443.40$2,345
Sep 2018063059.543.11$1,958
Aug 2018060459.403.07$1,852
Jul 2018065265.142.93$1,912
Jun 2018099860.183.08$3,071
May 201801,64665.382.90$4,775
Apr 201801,07263.842.90$3,110
Mar 2018061961.222.79$1,725
Feb 2018031361.782.77$866
Jan 2018039162.874.01$1,568
Dec 20175474257.272.92$5,260
Nov 2017086455.423.12$2,694
Oct 2017091349.292.98$2,724
Sep 2017186347.523.09$2,712
Aug 2017098145.373.00$2,947
Jul 201701,02943.873.09$3,177
Jun 2017188042.493.09$2,759
May 20172895545.373.26$4,387
Apr 2017189747.933.21$2,929
Mar 2017196546.772.98$2,926
Feb 2017181550.452.95$2,457
Jan 2017058949.413.42$2,014
Dec 2016263748.763.72$2,469
Nov 20161273742.492.64$2,459
Oct 2016064646.193.09$1,996
Sep 2016577541.553.10$2,611
Aug 2016066441.442.92$1,942
Jul 2016068541.622.92$2,003
Jun 2016272545.352.69$2,038
May 20165593842.521.99$4,206
Apr 2016099336.561.99$1,977
Mar 2016092533.011.79$1,659
Feb 2016083126.472.06$1,715
Jan 2016093327.352.36$2,206
Dec 2015089732.362.00$1,795
Nov 2015085538.792.17$1,853
Oct 20157578543.552.43$5,171
Sep 2015078042.992.76$2,152
Aug 2015079840.162.87$2,292
Jul 2015078648.152.95$2,315
Jun 20157985856.152.88$6,909
May 201501,10255.212.96$3,257
Apr 201501,12349.822.71$3,039
Mar 201501,19142.892.93$3,495
Feb 201501,03644.662.98$3,083
Jan 2015751,13043.433.10$6,761
Dec 201401,19654.693.59$4,295
Nov 201401,12070.464.25$4,762
Oct 2014085678.303.90$3,339
Sep 2014088186.164.05$3,564
Aug 20149075589.394.04$11,092
Jul 2014087996.564.18$3,674
Jun 2014591,00898.164.74$10,566
May 201401,08094.734.73$5,105
Apr 201401,02195.944.81$4,910
Mar 201401,85095.895.06$9,355
Feb 201401,82997.406.19$11,325
Jan 2014312,53790.404.86$15,134
Dec 201302,49091.824.35$10,843
Nov 201302,51088.853.74$9,383
Oct 2013352,45097.423.78$12,669
Sep 201303,274104.113.72$12,172
Aug 2013443,445104.253.52$16,722
Jul 201303,541102.523.72$13,165
Jun 2013323,47194.403.93$16,674
May 2013293,77394.834.15$18,405
Apr 201303,80393.964.28$16,287
Mar 2013473,99893.623.91$20,044
Feb 2013394,32491.233.42$18,346
Jan 2013353,00791.603.42$13,490
Dec 201203,05886.773.42$10,459
Nov 2012713,86386.953.62$20,177
Oct 201204,06889.383.40$13,830
Sep 201203,57894.672.92$10,442
Aug 2012353,64292.662.91$13,835
Jul 2012654,40085.133.02$18,825
Jun 201205,39679.822.52$13,593
May 2012404,50291.612.49$14,867
Apr 201205,283101.652.00$10,549
Mar 20121080105.052.22$11,345
Feb 201202,461101.102.57$6,325
Jan 2012842,35398.092.73$14,673
Dec 201102,45796.873.24$7,960
Nov 201102,17495.723.31$7,199
Oct 20111391,90884.983.65$18,774
Sep 201101,72183.623.99$6,860
Aug 2011572,00083.404.15$13,052
Jul 2011632,21794.144.52$15,946
Jun 201102,35392.904.64$10,918
May 2011762,44298.134.40$18,214
Apr 2011851,267105.964.33$14,497
Mar 2011722,73796.364.06$18,043
Feb 2011742,78085.644.18$17,958
Jan 2011544,04686.504.59$23,237
Dec 201005,09185.734.35$22,134
Nov 2010564,25380.843.80$20,669
Oct 201005,34578.103.51$18,755
Sep 2010454,91672.633.98$22,831
Aug 2010945,03173.684.42$29,160
Jul 2010404,77472.554.74$25,514
Jun 2010452,25670.364.91$14,244
May 2010974,23671.124.24$24,839
Apr 2010954,31481.694.12$25,546
Mar 201004,38478.394.39$19,240
Feb 2010534,16773.585.44$26,578
Jan 2010504,68374.365.96$31,648
Dec 2009474,56671.445.48$28,396
Nov 2009514,95474.593.75$22,389
Oct 2009485,57072.544.11$26,376
Sep 20092055,95865.543.06$31,695
Aug 200906,81467.423.22$21,931
Jul 20091206,90161.133.46$31,244
Jun 20091286,74866.163.90$34,752
May 20092747,70154.743.93$45,231
Apr 20092337,31146.773.59$37,126
Mar 20093639,15542.144.06$52,457
Feb 20091257,17632.814.63$37,348
Jan 20091268,83635.865.37$51,977
Dec 20081409,24537.105.98$60,453
Nov 20081499,06655.496.86$70,464
Oct 200808,93375.246.92$61,834
Sep 20081328,637101.767.88$81,467
Aug 20081539,843114.228.48$100,974
Jul 200833410,703131.0811.39$165,682
Jun 200835010,770131.3313.03$186,327
May 200817111,626123.1711.57$155,625
Apr 200814410,343110.3110.45$124,019
Mar 200813610,177101.909.66$112,210
Feb 200813811,46992.538.77$113,359
Jan 200813512,98690.388.21$118,761
Dec 200714114,05488.337.30$115,076
Nov 200742113,61991.677.29$137,899
Oct 200727415,70182.856.92$131,383
Sep 200729116,49775.846.24$125,079
Aug 200748818,70569.066.39$153,188
Jul 200746619,91170.906.39$160,230
Jun 200762120,34162.007.55$192,045
May 200746722,01058.747.85$200,128
Apr 200795821,15159.617.81$222,194
Mar 200784024,56556.927.30$227,186
Feb 200786926,82355.108.22$268,260
Jan 20071,07034,10350.306.73$283,227
Dec 20061,79541,20156.656.92$386,733
Nov 20061,75550,81254.207.62$482,180
Oct 20062,07870,20154.906.01$536,257
Sep 200677457,06060.085.04$333,925

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  774 Mcf  × $  3.05 =     $2,357

────────────────────────────────────────────────────
Month total                                   $2,357

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/224676 is the state's own key, not one this site invented.