CARR 12

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228057District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.4 M
Sep 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
237
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-08-14174404
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,061 bbl$154,206
GasProduction421,883 Mcf$2,261,259
Total$2,415,465

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6877, -100.3344. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68768, -100.33436 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,685 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,685 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-211336061223P11,685 ftSep 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (237)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

237 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202349085.443.09$4,187
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018040546.594.19$1,695
Nov 2018039252.934.24$1,661
Oct 2018040561.443.40$1,376
Sep 2018039259.543.11$1,218
Aug 2018040559.403.07$1,242
Jul 2018040565.142.93$1,187
Jun 2018039260.183.08$1,206
May 2018040565.382.90$1,175
Apr 2018039263.842.90$1,137
Mar 2018040561.222.79$1,129
Feb 2018036561.782.77$1,010
Jan 2018040562.874.01$1,624
Dec 201712340557.272.92$8,227
Nov 2017170755.423.12$2,260
Oct 201701,89249.292.98$5,645
Sep 201731,65347.523.09$5,246
Aug 201751,73845.373.00$5,449
Jul 201712,02143.873.09$6,283
Jun 201701,97342.493.09$6,091
May 201741,89345.373.26$6,359
Apr 201701,70047.933.21$5,460
Mar 201741,79346.772.98$5,537
Feb 201711,61150.452.95$4,807
Jan 201701,74249.413.42$5,956
Dec 201601,76148.763.72$6,556
Nov 201601,39342.492.64$3,684
Oct 201601,46246.193.09$4,518
Sep 201601,44041.553.10$4,465
Aug 201601,47441.442.92$4,310
Jul 201601,48241.622.92$4,334
Jun 201601,47845.352.69$3,970
May 20161891,52942.521.99$11,081
Apr 201601,48736.561.99$2,961
Mar 201601,54133.011.79$2,765
Feb 201601,42026.472.06$2,930
Jan 201601,51927.352.36$3,591
Dec 201501,49132.362.00$2,984
Nov 201501,49738.792.17$3,244
Oct 201521,57943.552.43$3,919
Sep 201501,55942.992.76$4,300
Aug 201511,60940.162.87$4,662
Jul 201541,62148.152.95$4,967
Jun 201511,57056.152.88$4,582
May 201531,83055.212.96$5,574
Apr 201501,52449.822.71$4,125
Mar 201501,82542.892.93$5,356
Feb 201541,85944.662.98$5,711
Jan 201531,60243.433.10$5,098
Dec 201401,57954.693.59$5,671
Nov 201401,56270.464.25$6,641
Oct 201401,69678.303.90$6,616
Sep 201401,65086.164.05$6,675
Aug 201401,70689.394.04$6,884
Jul 201421,67796.564.18$7,202
Jun 201401,62398.164.74$7,688
May 201401,69894.734.73$8,026
Apr 201411,62895.944.81$7,925
Mar 201411,64495.895.06$8,409
Feb 201411,55897.406.19$9,745
Jan 201421,86490.404.86$9,241
Dec 201321,85491.824.35$8,257
Nov 201301,82788.853.74$6,830
Oct 201301,93197.423.78$7,298
Sep 201301,887104.113.72$7,015
Aug 201321,966104.253.52$7,134
Jul 201311,952102.523.72$7,360
Jun 201301,91694.403.93$7,536
May 20131971,92794.834.15$26,677
Apr 201331,90793.964.28$8,449
Mar 201311,95793.623.91$7,751
Feb 201311,62291.233.42$5,638
Jan 201301,93491.603.42$6,614
Dec 201201,90786.773.42$6,522
Nov 201201,94586.953.62$7,051
Oct 201212,00689.383.40$6,909
Sep 201221,90794.672.92$5,755
Aug 201211,96892.662.91$5,816
Jul 201251,98585.133.02$6,422
Jun 201221,94079.822.52$5,047
May 201222,00891.612.49$5,180
Apr 201201,957101.652.00$3,908
Mar 201231,942105.052.22$4,630
Feb 201201,746101.102.57$4,488
Jan 201201,89698.092.73$5,184
Dec 201101,89596.873.24$6,139
Nov 201101,80395.723.31$5,970
Oct 201101,97184.983.65$7,191
Sep 201101,94483.623.99$7,748
Aug 201102,08683.404.15$8,655
Jul 201101,95094.144.52$8,809
Jun 20111212,03592.904.64$20,683
May 201102,24698.134.40$9,893
Apr 201102,192105.964.33$9,499
Mar 201102,13496.364.06$8,658
Feb 201102,17685.644.18$9,096
Jan 201102,48386.504.59$11,394
Dec 201002,60285.734.35$11,313
Nov 201002,61080.843.80$9,906
Oct 201002,61378.103.51$9,169
Sep 201002,58772.633.98$10,295
Aug 201002,52873.684.42$11,172
Jul 201002,50772.554.74$11,874
Jun 201002,63170.364.91$12,919
May 20102032,75971.124.24$26,122
Apr 201002,65181.694.12$10,929
Mar 201002,61978.394.39$11,494
Feb 201002,31273.585.44$12,583
Jan 201002,49074.365.96$14,851
Dec 200902,47271.445.48$13,556
Nov 200902,67174.593.75$10,020
Oct 200902,11672.544.11$8,697
Sep 20091652,91265.543.06$19,739
Aug 200903,10867.423.22$10,003
Jul 200903,21261.133.46$11,128
Jun 200903,13866.163.90$12,223
May 200903,26554.743.93$12,818
Apr 200903,15046.773.59$11,301
Mar 200903,14242.144.06$12,753
Feb 20091703,00932.814.63$19,518
Jan 200903,11635.865.37$16,736
Dec 200803,47537.105.98$20,771
Nov 200803,41555.496.86$23,428
Oct 200803,71375.246.92$25,701
Sep 200803,635101.767.88$28,633
Aug 200803,911114.228.48$33,177
Jul 20081873,870131.0811.39$68,589
Jun 200803,775131.3313.03$49,198
May 200803,992123.1711.57$46,205
Apr 200803,743110.3110.45$39,133
Mar 200804,115101.909.66$39,768
Feb 200804,00392.538.77$35,109
Jan 200804,06090.388.21$33,315
Dec 200704,37288.337.30$31,924
Nov 20071874,73991.677.29$51,698
Oct 20071755,15082.856.92$50,147
Sep 200705,09775.846.24$31,826
Aug 200705,81069.066.39$37,114
Jul 200705,97570.906.39$38,168
Jun 200705,84862.007.55$44,143
May 20072256,53758.747.85$64,508
Apr 200706,36359.617.81$49,664
Mar 200707,85256.927.30$57,335
Feb 200707,63855.108.22$62,754
Jan 2007010,09550.306.73$67,908
Dec 2006013,00756.656.92$89,988
Nov 2006013,78654.207.62$105,015
Oct 2006025,10854.906.01$150,994
Sep 2006030,44460.085.04$153,353

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            49 bbl  × $ 85.44 =     $4,187
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $4,187

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228057 is the state's own key, not one this site invented.