Value, all time
$2.4 M
May 2007 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
229
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-03-26181643
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,981 bbl$284,612
GasProduction328,065 Mcf$2,156,404
Total$2,441,016

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7441, -100.1728. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.74406, -100.17280 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,417 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,417 ft.

Completions filed
May 2007
1 of 1 wells

1 well

42-21133833205012,417 ftMay 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (229)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

229 months

May 2026097106.413.05$295
Apr 2026015698.932.87$448
Mar 2026025689.753.15$806
Feb 2026029763.503.75$1,114
Jan 2026017459.138.00$1,392
Dec 2025025256.664.41$1,112
Nov 2025027658.593.93$1,084
Oct 2025018459.383.30$608
Sep 20257121062.743.08$5,101
Aug 2025016663.933.01$500
Jul 202506666.743.32$219
Jun 2025020266.483.13$632
May 2025021760.553.23$701
Apr 2025023362.363.54$826
Mar 2025029967.704.27$1,276
Feb 2025044270.884.34$1,919
Jan 2025030374.324.28$1,296
Dec 2024025068.993.12$780
Nov 2024010269.052.20$224
Oct 2024041971.372.28$956
Sep 2024023969.612.36$565
Aug 2024025475.632.06$524
Jul 2024027479.932.15$588
Jun 2024023678.082.63$622
May 20246529878.812.20$5,778
Apr 2024027884.451.66$461
Mar 202403280.301.55$49
Feb 2024053376.091.78$951
Jan 2024023073.023.30$758
Dec 2023020571.262.61$535
Nov 2023021077.892.81$590
Oct 2023020785.443.09$639
Sep 2023017889.042.74$487
Aug 2023023380.522.67$623
Jul 2023020074.852.64$528
Jun 2023020168.962.26$454
May 20236821170.622.23$5,272
Apr 2023026178.122.24$584
Mar 2023032572.852.39$778
Feb 2023020475.112.47$503
Jan 2023030376.533.39$1,026
Dec 2022050276.415.73$2,876
Nov 2022034485.005.65$1,942
Oct 2022029287.185.86$1,712
Sep 2022046384.888.16$3,780
Aug 2022023994.529.13$2,181
Jul 20220185101.587.54$1,395
Jun 2022100204115.097.98$13,136
May 20220225109.378.43$1,897
Apr 20220211104.226.84$1,443
Mar 20220247108.885.08$1,254
Feb 2022020391.054.86$986
Jan 2022026481.844.54$1,198
Dec 2021023571.323.90$916
Nov 2021025177.435.24$1,314
Oct 2021022679.795.71$1,291
Sep 2021019069.865.35$1,017
Aug 2021020366.024.22$857
Jul 2021020570.783.98$816
Jun 2021031369.493.38$1,058
May 2021019863.483.02$598
Apr 2021022160.362.76$610
Mar 2021061061.302.72$1,657
Feb 2021032657.805.55$1,809
Jan 2021040250.412.81$1,130
Dec 2020038144.642.68$1,019
Nov 202014138638.772.71$6,511
Oct 2020044936.972.48$1,113
Sep 2020045937.091.99$914
Aug 2020042239.982.39$1,007
Jul 2020031838.371.83$580
Jun 2020034134.901.69$576
May 2020038116.921.81$691
Apr 2020032314.751.80$583
Mar 2020035330.341.86$655
Feb 2020032449.881.98$642
Jan 2020038857.252.09$813
Dec 2019037959.012.30$873
Nov 2019038555.302.75$1,059
Oct 2019038253.472.42$924
Sep 2019035255.052.66$935
Aug 2019040453.112.30$931
Jul 2019043756.272.46$1,075
Jun 2019036352.782.49$904
May 2019041158.482.74$1,126
Apr 20198238762.632.75$6,200
Mar 2019042356.803.06$1,295
Feb 2019038350.852.79$1,069
Jan 2019042646.033.23$1,375
Dec 2018044546.594.19$1,863
Nov 201814940252.934.24$9,590
Oct 2018047361.443.40$1,607
Sep 2018043759.543.11$1,358
Aug 2018047959.403.07$1,469
Jul 2018039965.142.93$1,170
Jun 2018042060.183.08$1,292
May 2018048365.382.90$1,401
Apr 2018045463.842.90$1,317
Mar 2018046361.222.79$1,290
Feb 2018046961.782.77$1,297
Jan 2018050462.874.01$2,021
Dec 2017053257.272.92$1,554
Nov 2017049255.423.12$1,534
Oct 2017048649.292.98$1,450
Sep 2017047547.523.09$1,466
Aug 2017052345.373.00$1,571
Jul 2017051443.873.09$1,587
Jun 201710348642.493.09$5,877
May 2017053945.373.26$1,759
Apr 2017050647.933.21$1,625
Mar 2017055946.772.98$1,668
Feb 2017045850.452.95$1,352
Jan 2017043249.413.42$1,477
Dec 2016035448.763.72$1,318
Nov 2016026342.492.64$695
Oct 2016036046.193.09$1,112
Sep 2016016341.553.10$505
Aug 2016012641.442.92$368
Jul 2016032341.622.92$945
Jun 201619520545.352.69$9,394
May 201619631142.521.99$8,953
Apr 2016037036.561.99$737
Mar 2016024233.011.79$434
Feb 2016027126.472.06$559
Jan 20160027.352.36$0
Dec 2015027632.362.00$552
Nov 2015018738.792.17$405
Oct 2015042343.552.43$1,026
Sep 2015020542.992.76$565
Aug 2015023740.162.87$681
Jul 2015029648.152.95$872
Jun 2015042556.152.88$1,225
May 2015038055.212.96$1,123
Apr 2015052949.822.71$1,432
Mar 2015048542.892.93$1,423
Feb 2015054644.662.98$1,625
Jan 2015033343.433.10$1,033
Dec 2014050154.693.59$1,799
Nov 2014063070.464.25$2,679
Oct 2014043078.303.90$1,677
Sep 2014059386.164.05$2,399
Aug 2014062289.394.04$2,510
Jul 2014046996.564.18$1,960
Jun 2014044298.164.74$2,094
May 2014062194.734.73$2,935
Apr 2014064095.944.81$3,078
Mar 2014083495.895.06$4,217
Feb 201401,08497.406.19$6,712
Jan 2014049290.404.86$2,391
Dec 2013061691.824.35$2,682
Nov 2013035988.853.74$1,342
Oct 201312142097.423.78$13,375
Sep 20130649104.113.72$2,413
Aug 20130697104.253.52$2,455
Jul 20130927102.523.72$3,446
Jun 2013093494.403.93$3,674
May 2013098194.834.15$4,070
Apr 2013095993.964.28$4,107
Mar 201321,08293.623.91$4,421
Feb 2013086391.233.42$2,951
Jan 20131751,21991.603.42$20,199
Dec 201211,18386.773.42$4,133
Nov 201231,14886.953.62$4,422
Oct 201211,32989.383.40$4,608
Sep 201201,25494.672.92$3,660
Aug 201211,34692.662.91$4,007
Jul 201201,37985.133.02$4,166
Jun 201201,30379.822.52$3,282
May 201211,40791.612.49$3,593
Apr 201201,300101.652.00$2,596
Mar 2012170954105.052.22$19,978
Feb 201211,343101.102.57$3,553
Jan 201201,60298.092.73$4,380
Dec 201101,26096.873.24$4,082
Nov 201101,03295.723.31$3,417
Oct 201101,31884.983.65$4,809
Sep 201111,11683.623.99$4,532
Aug 201101,22183.404.15$5,066
Jul 201121,54094.144.52$7,145
Jun 201119563392.904.64$21,053
May 201101,16398.134.40$5,123
Apr 20110292105.964.33$1,265
Mar 2011053996.364.06$2,187
Feb 2011170885.644.18$3,045
Jan 201111,16686.504.59$5,437
Dec 20100085.734.35$0
Nov 201011,22680.843.80$4,734
Oct 201011,38778.103.51$4,945
Sep 201021,43772.633.98$5,864
Aug 201011,76673.684.42$7,878
Jul 201011,80572.554.74$8,622
Jun 201051,73870.364.91$8,886
May 20101841,71671.124.24$20,354
Apr 201021,75681.694.12$7,403
Mar 201031,83778.394.39$8,297
Feb 201001,60773.585.44$8,746
Jan 201042,00174.365.96$12,232
Dec 200941,29371.445.48$7,376
Nov 200901,38274.593.75$5,185
Oct 200911,85872.544.11$7,709
Sep 20091841,94965.543.06$18,033
Aug 200932,17567.423.22$7,203
Jul 200932,32861.133.46$8,249
Jun 200951,75166.163.90$7,151
May 20091821,14454.743.93$14,454
Apr 200901,26446.773.59$4,535
Mar 200913,42042.144.06$13,924
Feb 200913,27332.814.63$15,197
Jan 20091934,07235.865.37$28,792
Dec 200812,06537.105.98$12,380
Nov 200805,82255.496.86$39,941
Oct 20081936,18275.246.92$57,313
Sep 200803,210101.767.88$25,285
Aug 200806,009114.228.48$50,974
Jul 2008012,507131.0811.39$142,448
Jun 2008015,034131.3313.03$195,933
May 2008012,752123.1711.57$147,595
Apr 200807,192110.3110.45$75,191
Mar 20081977,896101.909.66$96,382
Feb 200807,78992.538.77$68,314
Jan 2008020,29290.388.21$166,511
Dec 2007092588.337.30$6,754
Nov 20071899,02891.677.29$83,155
Oct 200719810,02682.856.92$85,804
Sep 2007011,20275.846.24$69,947
Aug 200718613,00469.066.39$95,914
Jul 200739015,06470.906.39$123,879
Jun 200708,71962.007.55$65,815
May 2007020,09358.747.85$157,655

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   97 Mcf  × $  3.05 =       $295

────────────────────────────────────────────────────
Month total                                     $295

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently