WALKER 52

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230927District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.9 M
Aug 2007 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-12182428
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,348 bbl$240,967
GasProduction477,763 Mcf$2,659,803
Total$2,900,770

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7447, -100.2130. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.74472, -100.21299 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,493 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,493 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-21133889412,493 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 20260212106.413.05$646
Apr 2026019398.932.87$554
Mar 2026020089.753.15$630
Feb 2026025763.503.75$964
Jan 2026022159.138.00$1,768
Dec 2025019756.664.41$869
Nov 2025025458.593.93$997
Oct 2025025959.383.30$856
Sep 2025028562.743.08$877
Aug 2025031863.933.01$959
Jul 2025072466.743.32$2,400
Jun 2025038866.483.13$1,214
May 2025091460.553.23$2,954
Apr 2025036062.363.54$1,276
Mar 2025055067.704.27$2,348
Feb 2025041570.884.34$1,801
Jan 2025035274.324.28$1,506
Dec 2024022068.993.12$687
Nov 2024035669.052.20$783
Oct 2024026571.372.28$605
Sep 20247933769.612.36$6,296
Aug 2024034175.632.06$704
Jul 2024035379.932.15$758
Jun 2024040078.082.63$1,054
May 2024036978.812.20$811
Apr 2024025784.451.66$426
Mar 202403580.301.55$54
Feb 2024025676.091.78$457
Jan 2024036673.023.30$1,207
Dec 2023034171.262.61$890
Nov 2023029977.892.81$839
Oct 2023037085.443.09$1,142
Sep 2023038789.042.74$1,058
Aug 2023029780.522.67$794
Jul 2023036874.852.64$972
Jun 2023041368.962.26$933
May 2023046770.622.23$1,040
Apr 202301,14978.122.24$2,571
Mar 2023070172.852.39$1,678
Feb 2023027275.112.47$671
Jan 2023036176.533.39$1,223
Dec 2022059376.415.73$3,397
Nov 2022052385.005.65$2,953
Oct 2022057287.185.86$3,354
Sep 2022072184.888.16$5,886
Aug 2022080694.529.13$7,356
Jul 20220732101.587.54$5,521
Jun 20220695115.097.98$5,544
May 20220701109.378.43$5,912
Apr 20220756104.226.84$5,169
Mar 2022134694108.885.08$18,113
Feb 2022081691.054.86$3,965
Jan 2022080481.844.54$3,648
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 2021067879.795.71$3,874
Sep 2021070269.865.35$3,756
Aug 2021062666.024.22$2,642
Jul 2021073070.783.98$2,907
Jun 2021069969.493.38$2,363
May 2021096263.483.02$2,903
Apr 20216887260.362.76$6,510
Mar 202101,26161.302.72$3,426
Feb 2021071657.805.55$3,972
Jan 202101,05650.412.81$2,968
Dec 202001,07144.642.68$2,865
Nov 2020097638.772.71$2,642
Oct 202001,03436.972.48$2,563
Sep 2020084137.091.99$1,674
Aug 202018881239.982.39$9,453
Jul 2020096938.371.83$1,769
Jun 2020092634.901.69$1,565
May 2020093216.921.81$1,691
Apr 2020090114.751.80$1,626
Mar 2020093030.341.86$1,726
Feb 2020079349.881.98$1,571
Jan 2020087157.252.09$1,825
Dec 2019098259.012.30$2,263
Nov 2019066955.302.75$1,840
Oct 2019085153.472.42$2,058
Sep 2019079555.052.66$2,113
Aug 2019082353.112.30$1,896
Jul 2019087456.272.46$2,150
Jun 2019070052.782.49$1,744
May 2019091458.482.74$2,505
Apr 2019194662.632.75$2,665
Mar 201911,04656.803.06$3,260
Feb 2019190850.852.79$2,586
Jan 201901,03546.033.23$3,341
Dec 201801,18046.594.19$4,939
Nov 201801,06952.934.24$4,530
Oct 20181901,01061.443.40$15,106
Sep 2018089859.543.11$2,791
Aug 201801,04759.403.07$3,211
Jul 2018099965.142.93$2,929
Jun 201801,00460.183.08$3,089
May 201801,14265.382.90$3,313
Apr 201801,06463.842.90$3,086
Mar 201811,13961.222.79$3,235
Feb 2018093061.782.77$2,572
Jan 201801,12362.874.01$4,502
Dec 2017094757.272.92$2,767
Nov 2017093855.423.12$2,925
Oct 201701,08549.292.98$3,237
Sep 201701,10247.523.09$3,402
Aug 201701,15145.373.00$3,458
Jul 201701,20543.873.09$3,720
Jun 201701,28042.493.09$3,952
May 201701,37845.373.26$4,497
Apr 201701,43547.933.21$4,609
Mar 201701,57546.772.98$4,699
Feb 201701,26750.452.95$3,741
Jan 20171931,63849.413.42$15,136
Dec 201611,60148.763.72$6,009
Nov 201601,92042.492.64$5,077
Oct 201612,14146.193.09$6,662
Sep 201611,95241.553.10$6,094
Aug 201632,14541.442.92$6,397
Jul 201621,98541.622.92$5,888
Jun 201631,93845.352.69$5,341
May 201621742.521.99$119
Apr 201631,80736.561.99$3,707
Mar 201692,86333.011.79$5,433
Feb 201692,30026.472.06$4,985
Jan 2016058027.352.36$1,371
Dec 2015014632.362.00$292
Nov 2015025038.792.17$542
Oct 2015127443.552.43$708
Sep 2015040742.992.76$1,123
Aug 2015033940.162.87$974
Jul 2015254548.152.95$1,701
Jun 2015039356.152.88$1,133
May 2015047755.212.96$1,410
Apr 2015050749.822.71$1,372
Mar 201519157942.892.93$9,891
Feb 2015160044.662.98$1,830
Jan 2015044443.433.10$1,377
Dec 2014061154.693.59$2,194
Nov 2014053570.464.25$2,275
Oct 2014167878.303.90$2,723
Sep 201401,15386.164.05$4,664
Aug 2014099989.394.04$4,031
Jul 201403,27296.564.18$13,676
Jun 201414,13898.164.74$19,699
May 201403,23394.734.73$15,281
Apr 201403,13395.944.81$15,067
Mar 201403,41595.895.06$17,269
Feb 201401,48797.406.19$9,208
Jan 201402,61890.404.86$12,725
Dec 201301,49691.824.35$6,514
Nov 201301,56388.853.74$5,843
Oct 2013341,69697.423.78$9,722
Sep 201305,781104.113.72$21,492
Aug 20131751,737104.253.52$24,363
Jul 201301,441102.523.72$5,357
Jun 201301,59094.403.93$6,254
May 201301,62994.834.15$6,759
Apr 201301,67793.964.28$7,182
Mar 201351,67193.623.91$7,007
Feb 201301,62191.233.42$5,544
Jan 201301,49091.603.42$5,096
Dec 20121841,75986.773.42$21,982
Nov 201231,88986.953.62$7,108
Oct 201241,80689.383.40$6,497
Sep 2012111,88694.672.92$6,545
Aug 201291,97492.662.91$6,575
Jul 201202,41385.133.02$7,289
Jun 201211,27879.822.52$3,299
May 201221,11991.612.49$2,968
Apr 201211,205101.652.00$2,508
Mar 201211,025105.052.22$2,383
Feb 201221,129101.102.57$3,104
Jan 201231,53698.092.73$4,494
Dec 201121,60496.873.24$5,390
Nov 201121,76795.723.31$6,042
Oct 201101,93384.983.65$7,053
Sep 201131,77983.623.99$7,342
Aug 201122,00783.404.15$8,494
Jul 201122,20294.144.52$10,135
Jun 20111731,72392.904.64$24,066
May 201122,39798.134.40$10,755
Apr 201101,586105.964.33$6,873
Mar 201101,56896.364.06$6,362
Feb 201121,50985.644.18$6,479
Jan 201121,17886.504.59$5,579
Dec 201061,54785.734.35$7,240
Nov 201051,99280.843.80$7,965
Oct 201092,22378.103.51$8,503
Sep 20101971,85972.633.98$21,706
Aug 201012,00873.684.42$8,948
Jul 201031,98472.554.74$9,615
Jun 2010121,81670.364.91$9,762
May 201042,25971.124.24$9,852
Apr 201072,11481.694.12$9,287
Mar 201052,19778.394.39$10,034
Feb 201002,37973.585.44$12,947
Jan 201062,41674.365.96$14,855
Dec 20091882,95171.445.48$29,613
Nov 200972,94174.593.75$11,555
Oct 200922,92372.544.11$12,159
Sep 200903,02765.543.06$9,277
Aug 200996,86667.423.22$22,705
Jul 200993,77361.133.46$13,622
Jun 200964,14266.163.90$16,530
May 20091864,80654.743.93$29,049
Apr 200935,13646.773.59$18,566
Mar 200955,72642.144.06$23,453
Feb 20091965,38732.814.63$31,389
Jan 200925,79835.865.37$31,213
Dec 200825,44937.105.98$32,644
Nov 20081936,40855.496.86$54,671
Oct 200807,67875.246.92$53,147
Sep 200807,528101.767.88$59,299
Aug 200807,979114.228.48$67,686
Jul 20081918,561131.0811.39$122,541
Jun 200808,520131.3313.03$111,038
May 200809,769123.1711.57$113,069
Apr 200809,908110.3110.45$103,587
Mar 2008010,463101.909.66$101,115
Feb 2008010,71292.538.77$93,950
Jan 200819012,70390.388.21$121,410
Dec 2007014,16888.337.30$103,454
Nov 2007015,90291.677.29$115,953
Oct 2007019,75482.856.92$136,737
Sep 200719224,50875.846.24$167,593
Aug 2007023,33869.066.39$149,082

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  212 Mcf  × $  3.05 =       $646

────────────────────────────────────────────────────
Month total                                     $646

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/230927 is the state's own key, not one this site invented.