Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the IVESTER (ATOKA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 231222District 10Field 448585002 tax incentive programmesCondensateGasSaveExport
Value, all time
$14.9 M
Aug 2007 – May 2026
Value, last 12 filed months
$76 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 14 leases and 14 wells, and the rule below applies to all of them.

Discovered
1985-09-13
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 10/01/2005.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-18177694
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,167 bbl$702,140
GasProduction2,304,799 Mcf$14,148,289
Total$14,850,428

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.4030, -100.0748. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.40304, -100.07481 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
15,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,800 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-48332392305915,800 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202602,328106.413.05$7,091
Apr 202602,29498.932.87$6,583
Mar 202602,23889.753.15$7,048
Feb 202602,13163.503.75$7,992
Jan 202602,35859.138.00$18,859
Dec 202502,46956.664.41$10,897
Nov 2025088958.593.93$3,491
Oct 2025089059.383.30$2,941
Sep 2025086362.743.08$2,655
Aug 2025088363.933.01$2,662
Jul 2025088766.743.32$2,941
Jun 2025087066.483.13$2,722
May 2025091460.553.23$2,954
Apr 2025091962.363.54$3,256
Mar 2025095667.704.27$4,081
Feb 2025088170.884.34$3,824
Jan 202501,02274.324.28$4,373
Dec 202401,06468.993.12$3,321
Nov 202401,06369.052.20$2,337
Oct 202401,05571.372.28$2,407
Sep 202401,00169.612.36$2,367
Aug 2024097475.632.06$2,010
Jul 2024097379.932.15$2,089
Jun 2024092978.082.63$2,447
May 2024097678.812.20$2,146
Apr 2024096684.451.66$1,603
Mar 202401,01380.301.55$1,565
Feb 202401,08476.091.78$1,933
Jan 202401,22373.023.30$4,033
Dec 202301,23771.262.61$3,229
Nov 202301,10577.892.81$3,102
Oct 202301,15385.443.09$3,560
Sep 202301,23689.042.74$3,381
Aug 202301,39380.522.67$3,723
Jul 202301,53374.852.64$4,050
Jun 202301,56468.962.26$3,532
May 202301,86370.622.23$4,150
Apr 202301,43878.122.24$3,218
Mar 2023083072.852.39$1,986
Feb 2023077975.112.47$1,921
Jan 2023084476.533.39$2,859
Dec 2022085676.415.73$4,904
Nov 2022083085.005.65$4,686
Oct 2022085387.185.86$5,002
Sep 2022085084.888.16$6,939
Aug 2022089794.529.13$8,187
Jul 20220927101.587.54$6,992
Jun 20220942115.097.98$7,515
May 202201,027109.378.43$8,661
Apr 202201,043104.226.84$7,132
Mar 202201,082108.885.08$5,493
Feb 2022099191.054.86$4,815
Jan 202201,15381.844.54$5,232
Dec 202101,28771.323.90$5,018
Nov 202101,25977.435.24$6,593
Oct 202101,32379.795.71$7,559
Sep 202101,31369.865.35$7,026
Aug 202101,33266.024.22$5,622
Jul 202101,24870.783.98$4,970
Jun 202101,06869.493.38$3,611
May 202101,12663.483.02$3,398
Apr 202101,27060.362.76$3,503
Mar 202101,34261.302.72$3,646
Feb 202101,19057.805.55$6,602
Jan 202101,27750.412.81$3,589
Dec 202001,42344.642.68$3,807
Nov 202001,27838.772.71$3,459
Oct 202001,68236.972.48$4,169
Sep 202001,35537.091.99$2,698
Aug 202001,69139.982.39$4,033
Jul 202001,78238.371.83$3,252
Jun 202001,76034.901.69$2,975
May 202002,17516.921.81$3,947
Apr 202001,90714.751.80$3,441
Mar 202001,90730.341.86$3,540
Feb 202001,88049.881.98$3,724
Jan 202002,07357.252.09$4,342
Dec 201902,30359.012.30$5,307
Nov 201902,43855.302.75$6,706
Oct 201902,95953.472.42$7,156
Sep 201902,71255.052.66$7,207
Aug 201902,87153.112.30$6,616
Jul 201903,08556.272.46$7,589
Jun 2019152,70752.782.49$7,535
May 201903,14358.482.74$8,613
Apr 201902,98362.632.75$8,205
Mar 201902,89056.803.06$8,849
Feb 201902,85750.852.79$7,977
Jan 201903,12246.033.23$10,078
Dec 201802,84946.594.19$11,924
Nov 201803,11852.934.24$13,212
Oct 201803,36961.443.40$11,448
Sep 2018463,14259.543.11$12,504
Aug 201802,74159.403.07$8,405
Jul 201802,70765.142.93$7,937
Jun 201802,95060.183.08$9,077
May 201803,13665.382.90$9,097
Apr 201803,12463.842.90$9,062
Mar 201803,18461.222.79$8,873
Feb 201803,06561.782.77$8,478
Jan 201803,34962.874.01$13,427
Dec 201703,30957.272.92$9,667
Nov 2017603,18555.423.12$13,257
Oct 201703,25249.292.98$9,703
Sep 201703,44747.523.09$10,642
Aug 201703,73845.373.00$11,230
Jul 201703,80243.873.09$11,738
Jun 201703,58842.493.09$11,077
May 201703,18845.373.26$10,404
Apr 201703,09047.933.21$9,924
Mar 201703,04446.772.98$9,082
Feb 201702,71450.452.95$8,013
Jan 201703,06349.413.42$10,472
Dec 2016723,23348.763.72$15,547
Nov 201603,51442.492.64$9,292
Oct 201603,50946.193.09$10,844
Sep 201604,25841.553.10$13,202
Aug 201603,92741.442.92$11,484
Jul 201604,04441.622.92$11,826
Jun 201604,02645.352.69$10,813
May 201604,48042.521.99$8,920
Apr 201604,44236.561.99$8,844
Mar 201604,48633.011.79$8,048
Feb 201604,37826.472.06$9,035
Jan 201604,84427.352.36$11,453
Dec 201504,76932.362.00$9,545
Nov 201504,83238.792.17$10,473
Oct 2015595,13143.552.43$15,020
Sep 201504,70542.992.76$12,978
Aug 201504,88140.162.87$14,021
Jul 201505,11248.152.95$15,055
Jun 201505,23156.152.88$15,080
May 201505,73555.212.96$16,950
Apr 201504,88349.822.71$13,216
Mar 201505,23242.892.93$15,354
Feb 201504,93344.662.98$14,682
Jan 201505,58943.433.10$17,329
Dec 201402,71054.693.59$9,733
Nov 20141422,86870.464.25$22,200
Oct 201404,80378.303.90$18,736
Sep 201405,71586.164.05$23,120
Aug 201406,28489.394.04$25,357
Jul 201406,33896.564.18$26,490
Jun 201406,19298.164.74$29,331
May 201406,16694.734.73$29,144
Apr 201406,36395.944.81$30,600
Mar 201406,56395.895.06$33,188
Feb 201406,20597.406.19$38,421
Jan 201407,47690.404.86$36,339
Dec 20131377,42291.824.35$44,898
Nov 201306,93788.853.74$25,932
Oct 201308,44097.423.78$31,898
Sep 201308,895104.113.72$33,069
Aug 201308,394104.253.52$29,569
Jul 201309,719102.523.72$36,133
Jun 201309,93694.403.93$39,082
May 2013010,22494.834.15$42,420
Apr 20131828,80193.964.28$54,792
Mar 201319,37693.623.91$36,781
Feb 201319,15691.233.42$31,404
Jan 201301,48091.603.42$5,061
Dec 2012022086.773.42$752
Nov 2012029786.953.62$1,077
Oct 2012032189.383.40$1,091
Sep 2012049794.672.92$1,450
Aug 2012085192.662.91$2,475
Jul 201201,68985.133.02$5,102
Jun 201202,79079.822.52$7,028
May 201204,34391.612.49$10,807
Apr 201206,626101.652.00$13,231
Mar 201205,632105.052.22$12,515
Feb 201219,968101.102.57$25,721
Jan 2012012,89098.092.73$35,242
Dec 201117,18496.873.24$23,371
Nov 201102,16395.723.31$7,162
Oct 201105,46984.983.65$19,954
Sep 2011112,17383.623.99$48,603
Aug 201119,10083.404.15$37,842
Jul 201103,29994.144.52$14,902
Jun 201104,10092.904.64$19,024
May 201104,79398.134.40$21,112
Apr 201105,635105.964.33$24,418
Mar 201109,24596.364.06$37,510
Feb 201108,64085.644.18$36,115
Jan 2011011,97086.504.59$54,928
Dec 2010013,74185.734.35$59,742
Nov 2010014,15880.843.80$53,734
Oct 201018914,71678.103.51$66,398
Sep 2010115,21972.633.98$60,636
Aug 2010014,85573.684.42$65,650
Jul 2010016,55772.554.74$78,422
Jun 2010217,18370.364.91$84,516
May 2010018,47371.124.24$78,237
Apr 2010018,32981.694.12$75,565
Mar 2010020,02278.394.39$87,870
Feb 2010019,88073.585.44$108,194
Jan 201019620,92174.365.96$139,349
Dec 2009021,74571.445.48$119,244
Nov 200918621,65574.593.75$95,112
Oct 2009023,68472.544.11$97,347
Sep 200918823,71265.543.06$84,993
Aug 2009026,24167.423.22$84,457
Jul 200919326,12261.133.46$102,298
Jun 200919226,03866.163.90$114,121
May 2009029,95854.743.93$117,608
Apr 200918429,77046.773.59$115,406
Mar 2009033,34042.144.06$135,327
Feb 200918134,37132.814.63$165,179
Jan 2009040,92935.865.37$219,830
Dec 200818938,18737.105.98$235,261
Nov 200818843,74455.496.86$310,532
Oct 2008043,22975.246.92$299,230
Sep 200818547,335101.767.88$391,688
Aug 200818250,193114.228.48$446,576
Jul 200855462,047131.0811.39$779,298
Jun 200818661,871131.3313.03$830,769
May 200818664,009123.1711.57$763,768
Apr 200818357,118110.3110.45$617,347
Mar 200834991,811101.909.66$922,831
Feb 200857295,46592.538.77$890,211
Jan 2008741100,58290.388.21$892,320
Dec 2007545101,60188.337.30$790,027
Nov 200736766,27691.677.29$516,908
Oct 200775580,01182.856.92$616,386
Sep 2007754125,10475.846.24$838,353
Aug 2007019,35469.066.39$123,632

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                2,328 Mcf  × $  3.05 =     $7,091

────────────────────────────────────────────────────
Month total                                   $7,091

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well