MATHEWS

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the HANSFORD (MORROW, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 231295District 10Field 38797682CondensateGasSaveExport
Value, all time
$8.1 M
Aug 2007 – May 2026
Value, last 12 filed months
$61 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 369 leases and 369 wells, and the rule below applies to all of them.

Discovered
1953-10-11
as the register files it
Field class
Gas
the register's own label
Between wells
2,500 ft
minimum
From a lease line
1,250 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: SURVEY

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,438 bbl$108,438
GasProduction1,457,473 Mcf$7,987,785
Total$8,096,223

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2740, -101.2299. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.27403, -101.22989 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,125 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,125 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-1953174921029,125 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202603,115106.413.05$9,488
Apr 202603,28698.932.87$9,430
Mar 202603,92689.753.15$12,365
Feb 202601,26763.503.75$4,752
Jan 202601,13859.138.00$9,102
Dec 2025087556.664.41$3,862
Nov 2025072758.593.93$2,855
Oct 2025065659.383.30$2,168
Sep 2025074562.743.08$2,292
Aug 202506763.933.01$202
Jul 2025078766.743.32$2,609
Jun 2025046866.483.13$1,464
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 202502967.704.27$124
Feb 202501,08770.884.34$4,718
Jan 202501,04274.324.28$4,458
Dec 202402,24868.993.12$7,017
Nov 20240069.052.20$0
Oct 202402,60571.372.28$5,943
Sep 202402,48869.612.36$5,883
Aug 202402,84375.632.06$5,867
Jul 2024067679.932.15$1,451
Jun 20240078.082.63$0
May 202401,65178.812.20$3,630
Apr 202402,49284.451.66$4,135
Mar 202402,79580.301.55$4,319
Feb 202401,06376.091.78$1,896
Jan 2024080273.023.30$2,645
Dec 202301,58971.262.61$4,148
Nov 202302,43877.892.81$6,845
Oct 202301,05185.443.09$3,245
Sep 202301,54089.042.74$4,212
Aug 202302,46380.522.67$6,583
Jul 202302,13274.852.64$5,632
Jun 20230068.962.26$0
May 202302,47470.622.23$5,511
Apr 202302,37378.122.24$5,310
Mar 202302,50972.852.39$6,004
Feb 202302,17475.112.47$5,360
Jan 202302,34076.533.39$7,927
Dec 202202,26576.415.73$12,976
Nov 202202,53085.005.65$14,285
Oct 202202,69787.185.86$15,815
Sep 202202,53584.888.16$20,695
Aug 202202,62294.529.13$23,931
Jul 202202,330101.587.54$17,573
Jun 202202,512115.097.98$20,039
May 202202,659109.378.43$22,423
Apr 202202,578104.226.84$17,627
Mar 202202,478108.885.08$12,579
Feb 202202,47691.054.86$12,030
Jan 202202,69681.844.54$12,234
Dec 20210071.323.90$0
Nov 202102,50677.435.24$13,124
Oct 202102,76979.795.71$15,822
Sep 20210069.865.35$0
Aug 202102,87466.024.22$12,130
Jul 202102,94270.783.98$11,715
Jun 202102,87869.493.38$9,729
May 202102,96863.483.02$8,956
Apr 202102,95060.362.76$8,137
Mar 202103,00861.302.72$8,173
Feb 202102,88157.805.55$15,984
Jan 202103,31550.412.81$9,316
Dec 202002,65444.642.68$7,101
Nov 202003,03238.772.71$8,206
Oct 202003,03236.972.48$7,515
Sep 202002,91237.091.99$5,798
Aug 202002,72739.982.39$6,504
Jul 202003,71138.371.83$6,773
Jun 202003,79334.901.69$6,411
May 202004,23016.921.81$7,676
Apr 202003,76714.751.80$6,797
Mar 202002,83130.341.86$5,255
Feb 202002,54549.881.98$5,041
Jan 202001,87157.252.09$3,919
Dec 201901,29459.012.30$2,982
Nov 201902,43555.302.75$6,698
Oct 201903,76053.472.42$9,094
Sep 201903,11655.052.66$8,280
Aug 201903,44253.112.30$7,932
Jul 201903,04156.272.46$7,481
Jun 2019068752.782.49$1,711
May 201902,52558.482.74$6,919
Apr 201904,05162.632.75$11,143
Mar 201903,76156.803.06$11,517
Feb 201904,00250.852.79$11,174
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 201809052.934.24$381
Oct 201802,76761.443.40$9,402
Sep 201802,07859.543.11$6,458
Aug 201801,01859.403.07$3,122
Jul 201802,66965.142.93$7,825
Jun 201802,52160.183.08$7,757
May 201803,36565.382.90$9,761
Apr 201802,49963.842.90$7,249
Mar 201804,16261.222.79$11,599
Feb 201801,82261.782.77$5,040
Jan 201802,92162.874.01$11,711
Dec 201703,90457.272.92$11,406
Nov 201703,05855.423.12$9,536
Oct 201703,90349.292.98$11,645
Sep 201704,44547.523.09$13,723
Aug 201703,36345.373.00$10,104
Jul 20170043.873.09$0
Jun 201701,83542.493.09$5,665
May 201702,46145.373.26$8,031
Apr 201703,68047.933.21$11,819
Mar 201704,59846.772.98$13,719
Feb 201701,03350.452.95$3,050
Jan 201701,41449.413.42$4,834
Dec 201603,67748.763.72$13,689
Nov 201683,43842.492.64$9,431
Oct 201603,59746.193.09$11,116
Sep 201603,50741.553.10$10,874
Aug 201603,67341.442.92$10,741
Jul 201603,70141.622.92$10,823
Jun 201603,57045.352.69$9,588
May 2016373,58342.521.99$8,707
Apr 201603,39636.561.99$6,762
Mar 201603,62333.011.79$6,500
Feb 20161683,47426.472.06$11,616
Jan 201603,65527.352.36$8,642
Dec 201503,85732.362.00$7,719
Nov 201503,72438.792.17$8,071
Oct 201503,94443.552.43$9,570
Sep 201503,85142.992.76$10,623
Aug 201504,04840.162.87$11,628
Jul 201504,24348.152.95$12,496
Jun 201503,96056.152.88$11,416
May 201503,89555.212.96$11,511
Apr 201503,83049.822.71$10,366
Mar 201504,14842.892.93$12,173
Feb 201503,41744.662.98$10,170
Jan 201504,38243.433.10$13,587
Dec 201404,60454.693.59$16,535
Nov 201404,71770.464.25$20,056
Oct 20141114,36778.303.90$25,727
Sep 201404,19086.164.05$16,950
Aug 201405,02689.394.04$20,281
Jul 201403,93896.564.18$16,459
Jun 2014013498.164.74$635
May 201402,97594.734.73$14,062
Apr 201404,90595.944.81$23,589
Mar 201404,76695.895.06$24,101
Feb 201404,74097.406.19$29,350
Jan 201405,12090.404.86$24,887
Dec 201305,12091.824.35$22,295
Nov 201305,31988.853.74$19,884
Oct 201305,17897.423.78$19,570
Sep 201304,705104.113.72$17,492
Aug 2013485,314104.253.52$23,723
Jul 201305,639102.523.72$20,964
Jun 201304,96594.403.93$19,529
May 201305,37894.834.15$22,314
Apr 201305,34593.964.28$22,890
Mar 201305,44993.623.91$21,321
Feb 201304,94491.233.42$16,908
Jan 201305,85891.603.42$20,034
Dec 201206,26986.773.42$21,441
Nov 201205,02786.953.62$18,223
Oct 201205,98789.383.40$20,354
Sep 201206,01294.672.92$17,545
Aug 20120092.662.91$0
Jul 201206,44585.133.02$19,469
Jun 201206,50679.822.52$16,389
May 201206,77791.612.49$16,863
Apr 201204,648101.652.00$9,281
Mar 201206,391105.052.22$14,201
Feb 201206,000101.102.57$15,421
Jan 201206,76698.092.73$18,499
Dec 201106,92696.873.24$22,438
Nov 201107,08195.723.31$23,447
Oct 201106,96184.983.65$25,397
Sep 201107,18583.623.99$28,638
Aug 201108,00083.404.15$33,195
Jul 201107,14594.144.52$32,276
Jun 201107,19892.904.64$33,398
May 201107,61698.134.40$33,547
Apr 201107,792105.964.33$33,765
Mar 201107,90696.364.06$32,077
Feb 201107,65085.644.18$31,977
Jan 201107,42986.504.59$34,090
Dec 201009,04185.734.35$39,308
Nov 201007,19780.843.80$27,315
Oct 201009,40478.103.51$32,998
Sep 201009,23572.633.98$36,750
Aug 2010010,72073.684.42$47,376
Jul 201006,93572.554.74$32,848
Jun 201009,09570.364.91$44,660
May 20101789,93371.124.24$54,728
Apr 201009,66781.694.12$39,854
Mar 2010010,38578.394.39$45,576
Feb 201009,72773.585.44$52,938
Jan 2010011,31374.365.96$67,472
Dec 2009011,98071.445.48$65,695
Nov 2009010,73174.593.75$40,257
Oct 2009012,52172.544.11$51,464
Sep 200916912,36065.543.06$48,957
Aug 2009013,39267.423.22$43,102
Jul 2009013,89661.133.46$48,143
Jun 2009012,82466.163.90$49,949
May 2009014,87154.743.93$58,380
Apr 2009015,10946.773.59$54,204
Mar 2009015,75542.144.06$63,950
Feb 2009015,17132.814.63$70,287
Jan 2009016,76735.865.37$90,056
Dec 2008017,99237.105.98$107,541
Nov 2008018,82055.496.86$129,112
Oct 200819320,67775.246.92$157,647
Sep 2008021,082101.767.88$166,065
Aug 2008023,244114.228.48$197,179
Jul 2008024,905131.0811.39$283,654
Jun 2008025,854131.3313.03$336,946
May 2008029,064123.1711.57$336,395
Apr 200817630,747110.3110.45$340,870
Mar 2008035,301101.909.66$341,151
Feb 200817737,62792.538.77$346,388
Jan 2008041,17990.388.21$337,904
Dec 2007052,03488.337.30$379,951
Nov 2007055,55391.677.29$405,076
Oct 200717360,37782.856.92$432,261
Sep 2007057,69275.846.24$360,238
Aug 2007018,43569.066.39$117,762

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                3,115 Mcf  × $  3.05 =     $9,488

────────────────────────────────────────────────────
Month total                                   $9,488

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/231295 is the state's own key, not one this site invented.