CARR 12

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 231437District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Aug 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-10-22194138
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,349 bbl$190,813
GasProduction315,254 Mcf$1,659,520
Total$1,850,333

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6808, -100.3382. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68083, -100.33824 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,715 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,715 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-211338131230P11,715 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 201933056.272.46$1,857
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 2018039259.543.11$1,218
Aug 201801,24259.403.07$3,809
Jul 2018091865.142.93$2,691
Jun 2018074660.183.08$2,295
May 2018077665.382.90$2,251
Apr 2018072963.842.90$2,115
Mar 2018370461.222.79$2,146
Feb 2018764761.782.77$2,222
Jan 2018062062.874.01$2,486
Dec 20171251,42457.272.92$11,319
Nov 201711,50555.423.12$4,749
Oct 201701,74549.292.98$5,207
Sep 201721,53347.523.09$4,828
Aug 2017121,58145.373.00$5,294
Jul 201741,85643.873.09$5,905
Jun 201701,80342.493.09$5,566
May 201741,70445.373.26$5,742
Apr 201701,52347.933.21$4,891
Mar 201761,58346.772.98$5,004
Feb 201711,43250.452.95$4,279
Jan 201701,62549.413.42$5,556
Dec 201601,65048.763.72$6,143
Nov 201601,26142.492.64$3,335
Oct 201601,30746.193.09$4,039
Sep 201601,29741.553.10$4,022
Aug 201601,33041.442.92$3,889
Jul 201601,34141.622.92$3,922
Jun 201601,29845.352.69$3,486
May 201601,34442.521.99$2,676
Apr 201601,28536.561.99$2,558
Mar 20161861,37633.011.79$8,608
Feb 201601,28426.472.06$2,650
Jan 201601,36627.352.36$3,230
Dec 201501,31332.362.00$2,628
Nov 201501,27738.792.17$2,768
Oct 201501,42143.552.43$3,448
Sep 201511,30542.992.76$3,643
Aug 201511,38240.162.87$4,010
Jul 201511,42248.152.95$4,236
Jun 201511,35956.152.88$3,974
May 201521,62455.212.96$4,910
Apr 201501,36949.822.71$3,705
Mar 201501,63042.892.93$4,784
Feb 201531,70644.662.98$5,211
Jan 201521,40743.433.10$4,449
Dec 201401,43754.693.59$5,161
Nov 201401,39370.464.25$5,923
Oct 201401,56078.303.90$6,086
Sep 201401,49686.164.05$6,052
Aug 201401,56389.394.04$6,307
Jul 201421,56896.564.18$6,747
Jun 201401,49898.164.74$7,096
May 201401,55694.734.73$7,355
Apr 201421,52995.944.81$7,545
Mar 201401,56395.895.06$7,904
Feb 201411,52797.406.19$9,553
Jan 201431,64090.404.86$8,243
Dec 201341,57891.824.35$7,239
Nov 20131811,65288.853.74$22,257
Oct 201301,74497.423.78$6,591
Sep 201301,739104.113.72$6,465
Aug 201321,824104.253.52$6,634
Jul 201321,824102.523.72$6,986
Jun 201321,76994.403.93$7,147
May 201311,78194.834.15$7,484
Apr 201321,71093.964.28$7,511
Mar 201311,74493.623.91$6,918
Feb 201301,56791.233.42$5,359
Jan 201301,79791.603.42$6,146
Dec 201201,63386.773.42$5,585
Nov 201201,88986.953.62$6,848
Oct 201201,83389.383.40$6,232
Sep 20121181,70594.672.92$16,147
Aug 201211,59592.662.91$4,731
Jul 201251,57785.133.02$5,189
Jun 201231,53479.822.52$4,104
May 201231,46291.612.49$3,913
Apr 201201,486101.652.00$2,967
Mar 201231,288105.052.22$3,177
Feb 201201,810101.102.57$4,652
Jan 201201,96798.092.73$5,378
Dec 201102,02196.873.24$6,548
Nov 2011331,91695.723.31$9,503
Oct 201101,64784.983.65$6,009
Sep 201102,10383.623.99$8,382
Aug 201101,89083.404.15$7,842
Jul 201102,23894.144.52$10,110
Jun 2011982,14792.904.64$19,066
May 2011552,31898.134.40$15,608
Apr 201101,740105.964.33$7,540
Mar 201101,24096.364.06$5,031
Feb 201101,55085.644.18$6,479
Jan 201102,13786.504.59$9,806
Dec 201002,56185.734.35$11,135
Nov 201002,56580.843.80$9,735
Oct 201002,72078.103.51$9,544
Sep 201002,75472.633.98$10,959
Aug 201002,81873.684.42$12,454
Jul 201002,81172.554.74$13,314
Jun 201002,95470.364.91$14,505
May 20101803,05771.124.24$25,749
Apr 201003,12781.694.12$12,892
Mar 201003,13678.394.39$13,763
Feb 201003,38873.585.44$18,439
Jan 201001,15374.365.96$6,877
Dec 2009074471.445.48$4,080
Nov 200901,07374.593.75$4,025
Oct 200901,03672.544.11$4,258
Sep 20091821,96865.543.06$17,960
Aug 200902,03867.423.22$6,559
Jul 20091851,74161.133.46$17,341
Jun 200901,48066.163.90$5,765
May 200901,45754.743.93$5,720
Apr 200902,08146.773.59$7,466
Mar 200901,55642.144.06$6,316
Feb 200901,53332.814.63$7,102
Jan 200902,28535.865.37$12,273
Dec 200802,45737.105.98$14,686
Nov 2008035355.496.86$2,422
Oct 200803,50875.246.92$24,282
Sep 200802,920101.767.88$23,001
Aug 20081553,145114.228.48$44,383
Jul 200803,111131.0811.39$35,433
Jun 200804,528131.3313.03$59,012
May 20081885,184123.1711.57$83,157
Apr 200805,504110.3110.45$57,544
Mar 200806,153101.909.66$59,463
Feb 200806,17492.538.77$54,150
Jan 20081826,95390.388.21$73,504
Dec 200708,20688.337.30$59,920
Nov 20071829,70991.677.29$87,479
Oct 200717812,97382.856.92$104,546
Sep 2007019,53875.846.24$121,998
Aug 2007021,57569.066.39$137,820

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2019 — as filed, then multipliedworked
Condensate            33 bbl  × $ 56.27 =     $1,857
Gas                    0 Mcf  × $  2.46 =         $0

────────────────────────────────────────────────────
Month total                                   $1,857

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/231437 is the state's own key, not one this site invented.