GRAHAM

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 233382District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Oct 2007 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
224
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-04-25179521
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,579 bbl$292,171
GasProduction571,302 Mcf$2,864,651
Total$3,156,822

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6962, -100.4065. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.69615, -100.40655 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,840 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,840 ft.

Completions filed
Oct 2007
1 of 1 wells

1 well

42-211339514626P12,840 ftOct 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (224)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

224 months

May 20261280106.413.05$13,620
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202388085.443.09$7,519
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 202203,55287.185.86$20,828
Sep 2022046184.888.16$3,763
Aug 2022046394.529.13$4,226
Jul 20220315101.587.54$2,376
Jun 20220585115.097.98$4,667
May 20220430109.378.43$3,626
Apr 202200104.226.84$0
Mar 20220456108.885.08$2,315
Feb 2022036291.054.86$1,759
Jan 2022053281.844.54$2,414
Dec 2021065771.323.90$2,562
Nov 2021058077.435.24$3,037
Oct 2021075179.795.71$4,291
Sep 2021068369.865.35$3,655
Aug 20213370966.024.22$5,171
Jul 2021076170.783.98$3,030
Jun 2021083669.493.38$2,826
May 2021092563.483.02$2,791
Apr 2021090060.362.76$2,483
Mar 202101,47161.302.72$3,997
Feb 2021028557.805.55$1,581
Jan 202101,21650.412.81$3,417
Dec 202001,29244.642.68$3,457
Nov 202001,20538.772.71$3,261
Oct 202001,16636.972.48$2,890
Sep 2020151,16737.091.99$2,880
Aug 202001,24239.982.39$2,962
Jul 202001,19938.371.83$2,188
Jun 2020097134.901.69$1,641
May 202001,20916.921.81$2,194
Apr 202001,15614.751.80$2,086
Mar 2020781,25230.341.86$4,691
Feb 202021,37149.881.98$2,815
Jan 202001,12857.252.09$2,363
Dec 201901,29259.012.30$2,977
Nov 201901,31955.302.75$3,628
Oct 201901,42553.472.42$3,446
Sep 201901,41055.052.66$3,747
Aug 201911,46953.112.30$3,438
Jul 201901,43756.272.46$3,535
Jun 201901,44052.782.49$3,587
May 201911,54258.482.74$4,284
Apr 201951,41562.632.75$4,205
Mar 20191961,63856.803.06$16,149
Feb 201921,55550.852.79$4,444
Jan 201931,68946.033.23$5,590
Dec 201801,66446.594.19$6,965
Nov 201841,65652.934.24$7,229
Oct 201841,78261.443.40$6,301
Sep 201811,62059.543.11$5,095
Aug 201801,77159.403.07$5,431
Jul 201831,85965.142.93$5,646
Jun 201801,81360.183.08$5,578
May 201851,75965.382.90$5,429
Apr 201831,81163.842.90$5,445
Mar 201871,88561.222.79$5,682
Feb 2018121,69461.782.77$5,427
Jan 201811,85462.874.01$7,496
Dec 201781,99257.272.92$6,278
Nov 201741,92355.423.12$6,218
Oct 201702,40549.292.98$7,176
Sep 201711,99347.523.09$6,200
Aug 201722,06245.373.00$6,286
Jul 201712,55243.873.09$7,923
Jun 201702,45542.493.09$7,579
May 201742,73945.373.26$9,120
Apr 201702,42747.933.21$7,795
Mar 201772,50746.772.98$7,807
Feb 20171842,25550.452.95$15,941
Jan 201732,51849.413.42$8,757
Dec 201602,59948.763.72$9,676
Nov 201602,17142.492.64$5,741
Oct 201602,18946.193.09$6,765
Sep 201602,15541.553.10$6,682
Aug 201601,98441.442.92$5,802
Jul 201602,20441.622.92$6,445
Jun 201602,08445.352.69$5,597
May 201602,25442.521.99$4,488
Apr 201602,23536.561.99$4,450
Mar 201602,37533.011.79$4,261
Feb 201602,23626.472.06$4,614
Jan 201602,40027.352.36$5,674
Dec 201502,37032.362.00$4,743
Nov 201502,47438.792.17$5,362
Oct 20151932,67443.552.43$14,894
Sep 201502,69042.992.76$7,420
Aug 201502,80940.162.87$8,069
Jul 201502,81348.152.95$8,285
Jun 201502,65956.152.88$7,666
May 2015122,85255.212.96$9,091
Apr 201502,34449.822.71$6,344
Mar 201502,85842.892.93$8,387
Feb 201512,57944.662.98$7,720
Jan 201502,44443.433.10$7,578
Dec 201402,60054.693.59$9,338
Nov 201402,37270.464.25$10,085
Oct 201402,37278.303.90$9,253
Sep 201402,48786.164.05$10,061
Aug 201402,68189.394.04$10,818
Jul 201402,70696.564.18$11,310
Jun 201402,58098.164.74$12,221
May 20141742,72994.734.73$29,382
Apr 201402,70195.944.81$12,989
Mar 201402,70695.895.06$13,684
Feb 201402,46397.406.19$15,251
Jan 201402,55990.404.86$12,439
Dec 201322,47291.824.35$10,948
Nov 201302,59088.853.74$9,682
Oct 201302,76797.423.78$10,457
Sep 201302,829104.113.72$10,517
Aug 201343,029104.253.52$11,087
Jul 201363,104102.523.72$12,155
Jun 201322,86694.403.93$11,462
May 20132043,09094.834.15$32,166
Apr 201382,99293.964.28$13,565
Mar 201393,08793.623.91$12,922
Feb 201332,91391.233.42$10,236
Jan 2013243,10991.603.42$12,831
Dec 201203,67586.773.42$12,569
Nov 201203,59386.953.62$13,024
Oct 201207,14589.383.40$24,291
Sep 201203,28994.672.92$9,599
Aug 201203,36792.662.91$9,792
Jul 201203,22385.133.02$9,736
Jun 201203,01179.822.52$7,585
May 201203,08091.612.49$7,664
Apr 201202,987101.652.00$5,964
Mar 201202,095105.052.22$4,655
Feb 201203,039101.102.57$7,811
Jan 20121828,55698.092.73$41,245
Dec 201103,48296.873.24$11,281
Nov 201103,44795.723.31$11,414
Oct 201103,95284.983.65$14,419
Sep 201103,92583.623.99$15,644
Aug 201104,33383.404.15$17,979
Jul 201104,02494.144.52$18,177
Jun 2011079492.904.64$3,684
May 201104,20598.134.40$18,522
Apr 20111864,050105.964.33$37,258
Mar 201104,01796.364.06$16,298
Feb 201103,46885.644.18$14,496
Jan 201104,34386.504.59$19,929
Dec 201004,22685.734.35$18,374
Nov 201004,01680.843.80$15,242
Oct 201004,31778.103.51$15,148
Sep 201003,83072.633.98$15,241
Aug 201003,59073.684.42$15,866
Jul 20101771,22272.554.74$18,629
Jun 201003,15870.364.91$15,507
May 201003,33171.124.24$14,108
Apr 201003,24181.694.12$13,362
Mar 201003,37878.394.39$14,825
Feb 201003,06073.585.44$16,654
Jan 20101783,51374.365.96$34,188
Dec 200903,30271.445.48$18,107
Nov 200903,60774.593.75$13,532
Oct 200903,84372.544.11$15,796
Sep 200903,76365.543.06$11,533
Aug 200903,88067.423.22$12,488
Jul 20091734,08661.133.46$24,731
Jun 200903,96066.163.90$15,424
May 200903,68554.743.93$14,466
Apr 200903,37246.773.59$12,097
Mar 200903,97842.144.06$16,147
Feb 20091733,70932.814.63$22,860
Jan 200904,35735.865.37$23,401
Dec 200804,82637.105.98$28,846
Nov 200805,02555.496.86$34,473
Oct 200805,39775.246.92$37,358
Sep 200805,695101.767.88$44,860
Aug 20081725,961114.228.48$70,213
Jul 200806,654131.0811.39$75,785
Jun 20081886,675131.3313.03$111,683
May 200808,249123.1711.57$95,476
Apr 20081728,647110.3110.45$109,376
Mar 2008011,031101.909.66$106,604
Feb 2008012,78092.538.77$112,088
Jan 200816716,44890.388.21$150,061
Dec 200736323,09888.337.30$200,725
Nov 2007045,49891.677.29$331,758
Oct 200705,62382.856.92$38,922

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate           128 bbl  × $106.41 =    $13,620
Gas                    0 Mcf  × $  3.05 =         $0

────────────────────────────────────────────────────
Month total                                  $13,620

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/233382 is the state's own key, not one this site invented.