BYRUM 4

Operated by BCE-MACH III LLC (P-5 40209) in the RED DEER CREEK (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234099District 10Field 752003002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Jul 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 157 leases and 157 wells, and the rule below applies to all of them.

Discovered
1978-03-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-09-09.

The Commission's schedule remark for this field reads: AND PLAT AS LONG AS THE ALLOCATION IS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-23182866
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,157 bbl$814,616
GasProduction405,239 Mcf$2,418,633
Total$3,233,249

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7599, -100.5869. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.75990, -100.58692 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,200 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-393319681711,200 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 2017105047.933.21$5,033
Mar 20173346.772.98$149
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 2016111,08441.553.10$3,818
Aug 201651,24341.442.92$3,842
Jul 201651,23141.622.92$3,808
Jun 20161881,27645.352.69$11,953
May 201691,23442.521.99$2,840
Apr 201651,07436.561.99$2,321
Mar 201631,13033.011.79$2,126
Feb 201651,06826.472.06$2,336
Jan 20162021,09327.352.36$8,109
Dec 201531,01232.362.00$2,123
Nov 201541,43738.792.17$3,270
Oct 201561,43343.552.43$3,739
Sep 201551,33042.992.76$3,884
Aug 20151921,46140.162.87$11,907
Jul 2015171,46848.152.95$5,142
Jun 201571,08256.152.88$3,512
May 2015231,31255.212.96$5,147
Apr 201521,05049.822.71$2,942
Mar 201501,18442.892.93$3,475
Feb 201531,10844.662.98$3,432
Jan 20151911,22243.433.10$12,084
Dec 2014111,37554.693.59$5,540
Nov 201431,31970.464.25$5,820
Oct 201431,45978.303.90$5,926
Sep 201481,54986.164.05$6,956
Aug 201441,62189.394.04$6,898
Jul 2014101,64496.564.18$7,837
Jun 20141751,37298.164.74$23,677
May 201451,49794.734.73$7,549
Apr 201431,43895.944.81$7,203
Mar 201461,62895.895.06$8,808
Feb 201431,37997.406.19$8,831
Jan 201401,65390.404.86$8,035
Dec 20131821,57391.824.35$23,561
Nov 201371,28888.853.74$5,437
Oct 201301,71497.423.78$6,478
Sep 201301,712104.113.72$6,365
Aug 201301,715104.253.52$6,041
Jul 20131821,905102.523.72$25,741
Jun 201301,84294.403.93$7,245
May 201301,60894.834.15$6,672
Apr 2013047793.964.28$2,043
Mar 201301,63993.623.91$6,413
Feb 20131731,41291.233.42$20,612
Jan 201302,04591.603.42$6,994
Dec 201202,16186.773.42$7,391
Nov 201201,98786.953.62$7,203
Oct 20121721,92489.383.40$21,914
Sep 201202,28294.672.92$6,660
Aug 201202,39392.662.91$6,959
Jul 20121642,67785.133.02$22,048
Jun 201202,61079.822.52$6,575
May 201202,69691.612.49$6,709
Apr 20121762,685101.652.00$23,252
Mar 201202,808105.052.22$6,240
Feb 201202,649101.102.57$6,809
Jan 20121732,97798.092.73$25,109
Dec 201103,01896.873.24$9,778
Nov 20111733,06795.723.31$26,715
Oct 201103,15384.983.65$11,504
Sep 201103,39483.623.99$13,528
Aug 20111683,61183.404.15$28,994
Jul 20111723,78394.144.52$33,281
Jun 201103,96892.904.64$18,411
May 20113554,35798.134.40$54,028
Apr 201103,867105.964.33$16,757
Mar 20111783,63396.364.06$31,892
Feb 20111712,80485.644.18$26,365
Jan 201102,41786.504.59$11,091
Dec 201001385.734.35$57
Nov 20100080.843.80$0
Oct 2010023878.103.51$835
Sep 2010030272.633.98$1,202
Aug 2010030873.684.42$1,361
Jul 2010027572.554.74$1,303
Jun 2010028370.364.91$1,390
May 2010032571.124.24$1,376
Apr 2010034181.694.12$1,406
Mar 2010038178.394.39$1,672
Feb 2010037973.585.44$2,063
Jan 2010050374.365.96$3,000
Dec 2009063371.445.48$3,471
Nov 2009080574.593.75$3,020
Oct 200901,12672.544.11$4,628
Sep 200901,42765.543.06$4,373
Aug 200901,87067.423.22$6,019
Jul 200902,31261.133.46$8,010
Jun 200903,00566.163.90$11,704
May 20091805,52454.743.93$31,539
Apr 20091916,19846.773.59$31,168
Mar 200906,62642.144.06$26,895
Feb 20093796,13532.814.63$40,858
Jan 200905,92135.865.37$31,802
Dec 200804,30237.105.98$25,714
Nov 20081893,14755.496.86$32,077
Oct 200803,73175.246.92$25,826
Sep 20083635,837101.767.88$82,917
Aug 200806,285114.228.48$53,316
Jul 20081766,587131.0811.39$98,092
Jun 200814,704131.3313.03$61,437
May 20081868,033123.1711.57$115,886
Apr 200836110,488110.3110.45$149,472
Mar 2008012,040101.909.66$116,355
Feb 200839212,00592.538.77$141,563
Jan 200836514,43190.388.21$151,406
Dec 200740417,63188.337.30$164,426
Nov 200736418,21091.677.29$166,150
Oct 200778826,90082.856.92$251,487
Sep 200797227,17075.846.24$243,370
Aug 20071,17534,10569.066.39$299,006
Jul 2007011,38370.906.39$72,714

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2017 — as filed, then multipliedworked
Condensate           105 bbl  × $ 47.93 =     $5,033
Gas                    0 Mcf  × $  3.21 =         $0

────────────────────────────────────────────────────
Month total                                   $5,033

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/234099 is the state's own key, not one this site invented.