BEARD "19"

Operated by HIGH RIVER RES OPERATING, LLC (P-5 385674) in the SMITH PERRYTON (MORROW-MISS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234505District 10Field 84300700GasSaveExport
Value, all time
$328 k
Jan 2008 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
221
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 19 leases and 19 wells, and the rule below applies to all of them.

Discovered
2007-12-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-01-01.

The Commission's schedule remark for this field reads: SUSPENSION OF ALLOCATION FORMULA.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction62,650 Mcf$327,909
Total$327,909

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.4020, -100.9981. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.40204, -100.99812 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,150 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,150 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-3573269518,150 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 2026210106.413.05$640
Apr 202620298.932.87$580
Mar 202621089.753.15$661
Feb 202618863.503.75$705
Jan 202620759.138.00$1,656
Dec 202521056.664.41$927
Nov 202520958.593.93$821
Oct 202521059.383.30$694
Sep 202520362.743.08$625
Aug 202520563.933.01$618
Jul 202521466.743.32$709
Jun 202520566.483.13$641
May 202522160.553.23$714
Apr 202520862.363.54$737
Mar 202521467.704.27$913
Feb 202540770.884.34$1,767
Jan 202542774.324.28$1,827
Dec 202422268.993.12$693
Nov 202420869.052.20$457
Oct 202444071.372.28$1,004
Sep 202422169.612.36$523
Aug 202422275.632.06$458
Jul 202422779.932.15$487
Jun 202421978.082.63$577
May 202422778.812.20$499
Apr 202421984.451.66$363
Mar 202421080.301.55$324
Feb 20246376.091.78$112
Jan 202422173.023.30$729
Dec 202321071.262.61$548
Nov 202321177.892.81$592
Oct 202322185.443.09$682
Sep 202321889.042.74$596
Aug 202323180.522.67$617
Jul 202323874.852.64$629
Jun 202323568.962.26$531
May 202324570.622.23$546
Apr 202324378.122.24$544
Mar 202326372.852.39$629
Feb 202323975.112.47$589
Jan 202326676.533.39$901
Dec 202229176.415.73$1,667
Nov 202224385.005.65$1,372
Oct 202229987.185.86$1,753
Sep 20224184.888.16$335
Aug 202234294.529.13$3,121
Jul 2022358101.587.54$2,700
Jun 2022347115.097.98$2,768
May 2022361109.378.43$3,044
Apr 2022326104.226.84$2,229
Mar 2022376108.885.08$1,909
Feb 202239591.054.86$1,919
Jan 202248481.844.54$2,196
Dec 20211,05871.323.90$4,125
Nov 202153577.435.24$2,802
Oct 202154879.795.71$3,131
Sep 202164269.865.35$3,435
Aug 202175266.024.22$3,174
Jul 202189070.783.98$3,544
Jun 20211,49269.493.38$5,044
May 20212363.483.02$69
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 201617941.442.92$523
Jul 201626241.622.92$766
Jun 201625945.352.69$696
May 201622542.521.99$448
Apr 201616536.561.99$329
Mar 201612833.011.79$230
Feb 201620626.472.06$425
Jan 201624927.352.36$589
Dec 201521732.362.00$434
Nov 201522538.792.17$488
Oct 201520743.552.43$502
Sep 201516142.992.76$444
Aug 201520240.162.87$580
Jul 201522648.152.95$666
Jun 201512856.152.88$369
May 201522555.212.96$665
Apr 201521549.822.71$582
Mar 201529542.892.93$866
Feb 201519244.662.98$571
Jan 201533243.433.10$1,029
Dec 201431254.693.59$1,121
Nov 201426270.464.25$1,114
Oct 201440378.303.90$1,572
Sep 201428086.164.05$1,133
Aug 201420289.394.04$815
Jul 201434596.564.18$1,442
Jun 201433098.164.74$1,563
May 201437194.734.73$1,754
Apr 201428395.944.81$1,361
Mar 201420395.895.06$1,027
Feb 201419797.406.19$1,220
Jan 201422890.404.86$1,108
Dec 201324191.824.35$1,049
Nov 201316388.853.74$609
Oct 201320897.423.78$786
Sep 2013109104.113.72$405
Aug 2013215104.253.52$757
Jul 2013235102.523.72$874
Jun 201321594.403.93$846
May 201321894.834.15$905
Apr 201322093.964.28$942
Mar 201322893.623.91$892
Feb 201320991.233.42$715
Jan 201322391.603.42$763
Dec 201224686.773.42$841
Nov 201225486.953.62$921
Oct 201227789.383.40$942
Sep 201229894.672.92$870
Aug 201224192.662.91$701
Jul 201228985.133.02$873
Jun 201227179.822.52$683
May 201230291.612.49$751
Apr 2012295101.652.00$589
Mar 2012311105.052.22$691
Feb 2012293101.102.57$753
Jan 201231998.092.73$872
Dec 201132396.873.24$1,046
Nov 201132895.723.31$1,086
Oct 201133784.983.65$1,230
Sep 201133483.623.99$1,331
Aug 201133883.404.15$1,402
Jul 201133094.144.52$1,491
Jun 201130292.904.64$1,401
May 201131798.134.40$1,396
Apr 2011315105.964.33$1,365
Mar 201131996.364.06$1,294
Feb 201132685.644.18$1,363
Jan 201138186.504.59$1,748
Dec 201036585.734.35$1,587
Nov 201034180.843.80$1,294
Oct 201035878.103.51$1,256
Sep 201035672.633.98$1,417
Aug 201035373.684.42$1,560
Jul 201038072.554.74$1,800
Jun 201040770.364.91$1,999
May 201047871.124.24$2,024
Apr 201051081.694.12$2,103
Mar 201033778.394.39$1,479
Feb 201038873.585.44$2,112
Jan 201045774.365.96$2,726
Dec 200946871.445.48$2,566
Nov 200968274.593.75$2,559
Oct 200948372.544.11$1,985
Sep 200944965.543.06$1,376
Aug 200952767.423.22$1,696
Jul 200957861.133.46$2,002
Jun 200950666.163.90$1,971
May 200921854.743.93$856
Apr 200994346.773.59$3,383
Mar 20091,11742.144.06$4,534
Feb 200998432.814.63$4,559
Jan 200929535.865.37$1,584
Dec 200836237.105.98$2,164
Nov 200846255.496.86$3,169
Oct 200863975.246.92$4,423
Sep 2008861101.767.88$6,782
Aug 20081,080114.228.48$9,162
Jul 20081,036131.0811.39$11,799
Jun 20081,271131.3313.03$16,564
May 20081,663123.1711.57$19,248
Apr 20082,222110.3110.45$23,231
Mar 20083,366101.909.66$32,529
Feb 200847792.538.77$4,184
Jan 200841590.388.21$3,405

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  210 Mcf  × $  3.05 =       $640

────────────────────────────────────────────────────
Month total                                     $640

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/234505 is the state's own key, not one this site invented.