Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the IVESTER (ATOKA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235263District 10Field 448585002 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.4 M
Jan 2008 – May 2026
Value, last 12 filed months
$414
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 14 leases and 14 wells, and the rule below applies to all of them.

Discovered
1985-09-13
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 10/01/2005.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-30180752
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,216 bbl$179,587
GasProduction1,101,166 Mcf$6,192,564
Total$6,372,151

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.4105, -100.0646. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.41046, -100.06462 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
16,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 16,400 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-48332446205916,400 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 2025012566.743.32$414
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 202501,80362.363.54$6,388
Mar 20254610,64767.704.27$48,559
Feb 202502,44870.884.34$10,626
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 2024010178.812.20$222
Apr 20240084.451.66$0
Mar 202406,82780.301.55$10,549
Feb 202404,48676.091.78$8,001
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 2023014368.962.26$323
May 20236522070.622.23$5,080
Apr 2023010,61678.122.24$23,756
Mar 202308,10972.852.39$19,406
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202202,505109.378.43$21,125
Apr 202202,416104.226.84$16,520
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 202106077.435.24$314
Oct 202109379.795.71$531
Sep 202108869.865.35$471
Aug 20210466.024.22$17
Jul 202106070.783.98$239
Jun 202109069.493.38$304
May 2021907,15563.483.02$27,305
Apr 202108,30160.362.76$22,898
Mar 202109,18661.302.72$24,958
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200614.751.80$11
Mar 20200630.341.86$11
Feb 2020019049.881.98$376
Jan 202002,55757.252.09$5,356
Dec 201904,56959.012.30$10,529
Nov 201909055.302.75$248
Oct 201904,25053.472.42$10,279
Sep 201908,76055.052.66$23,278
Aug 2019077453.112.30$1,784
Jul 2019081056.272.46$1,993
Jun 20190652.782.49$15
May 2019013658.482.74$373
Apr 2019049062.632.75$1,348
Mar 2019013456.803.06$410
Feb 2019099150.852.79$2,767
Jan 201905,04046.033.23$16,270
Dec 2018844,12046.594.19$21,158
Nov 2018060852.934.24$2,576
Oct 2018051561.443.40$1,750
Sep 201809159.543.11$283
Aug 2018026859.403.07$822
Jul 201803,32365.142.93$9,743
Jun 201804,61160.183.08$14,188
May 201807,86765.382.90$22,821
Apr 201801,76263.842.90$5,111
Mar 201801,39761.222.79$3,893
Feb 2018082361.782.77$2,277
Jan 201801,29962.874.01$5,208
Dec 2017083957.272.92$2,451
Nov 20170855.423.12$25
Oct 2017038049.292.98$1,134
Sep 201703,32047.523.09$10,250
Aug 2017047045.373.00$1,412
Jul 2017055243.873.09$1,704
Jun 20170642.493.09$19
May 2017076545.373.26$2,497
Apr 201702,17747.933.21$6,992
Mar 201706,62246.772.98$19,758
Feb 2017027750.452.95$818
Jan 2017069949.413.42$2,390
Dec 2016093348.763.72$3,473
Nov 201601,92642.492.64$5,093
Oct 201601,67646.193.09$5,179
Sep 2016975,53941.553.10$21,205
Aug 201606,02641.442.92$17,622
Jul 201605,59241.622.92$16,353
Jun 2016012045.352.69$322
May 201601,58042.521.99$3,146
Apr 201602,26136.561.99$4,502
Mar 201604,50133.011.79$8,075
Feb 201602,90126.472.06$5,987
Jan 201602,02327.352.36$4,783
Dec 201501,89132.362.00$3,785
Nov 201522,23938.792.17$4,930
Oct 201504,04743.552.43$9,820
Sep 201502,32142.992.76$6,402
Aug 201507,33440.162.87$21,067
Jul 201509,55848.152.95$28,149
Jun 201506,54056.152.88$18,854
May 201501,39755.212.96$4,129
Apr 201521,49649.822.71$4,149
Mar 201501,64942.892.93$4,839
Feb 201501,41244.662.98$4,202
Jan 201501,12343.433.10$3,482
Dec 2014093654.693.59$3,362
Nov 2014831,05970.464.25$10,351
Oct 201401,08578.303.90$4,233
Sep 2014090586.164.05$3,661
Aug 2014045189.394.04$1,820
Jul 201401,58696.564.18$6,629
Jun 201403,88898.164.74$18,417
May 201405,63294.734.73$26,620
Apr 201406,02495.944.81$28,970
Mar 201405,85195.895.06$29,587
Feb 201405,04497.406.19$31,232
Jan 201406,27090.404.86$30,477
Dec 2013964,85691.824.35$29,960
Nov 201346,16988.853.74$23,417
Oct 201326,40897.423.78$24,413
Sep 201306,889104.113.72$25,612
Aug 201323,491104.253.52$12,506
Jul 201314,209102.523.72$15,750
Jun 201305,73794.403.93$22,566
May 201317,14194.834.15$29,723
Apr 201347,71493.964.28$33,412
Mar 201376,79993.623.91$27,259
Feb 201375,64591.233.42$19,944
Jan 201396,69291.603.42$23,710
Dec 201265,07786.773.42$17,885
Nov 201262,76386.953.62$10,537
Oct 201223,91989.383.40$13,502
Sep 201203,51094.672.92$10,244
Aug 201227,86092.662.91$23,043
Jul 201245,72785.133.02$17,641
Jun 201235,71379.822.52$14,631
May 201217,10891.612.49$17,779
Apr 201208,208101.652.00$16,390
Mar 201208,243105.052.22$18,317
Feb 201215,107101.102.57$13,227
Jan 201227,19398.092.73$19,862
Dec 201115,35996.873.24$17,459
Nov 201108,42895.723.31$27,907
Oct 201104,47484.983.65$16,324
Sep 201104,43583.623.99$17,677
Aug 201103,92783.404.15$16,294
Jul 201149,11594.144.52$41,551
Jun 201102,27392.904.64$10,546
May 201123,24198.134.40$14,472
Apr 201112,650105.964.33$11,589
Mar 201102,46796.364.06$10,009
Feb 201102,27585.644.18$9,509
Jan 201165,94186.504.59$27,781
Dec 201005,18985.734.35$22,560
Nov 20101446,61480.843.80$36,743
Oct 201038,05978.103.51$28,512
Sep 201088,69372.633.98$35,175
Aug 201039,51973.684.42$42,289
Jul 20101610,43572.554.74$50,586
Jun 2010169,70570.364.91$48,781
May 201007,52471.124.24$31,866
Apr 201009,24381.694.12$38,106
Mar 201009,61778.394.39$42,206
Feb 201008,54273.585.44$46,489
Jan 201009,59574.365.96$57,225
Dec 2009010,27371.445.48$56,335
Nov 2009011,31874.593.75$42,459
Oct 2009011,17972.544.11$45,948
Sep 200903,40465.543.06$10,432
Aug 20091884,57567.423.22$27,400
Jul 2009012,01461.133.46$41,623
Jun 2009015,29366.163.90$59,566
May 2009020,46554.743.93$80,340
Apr 2009023,93846.773.59$85,878
Mar 200919024,69542.144.06$108,244
Feb 2009010,80732.814.63$50,069
Jan 200906,69535.865.37$35,959
Dec 200809,03837.105.98$54,021
Nov 200819816,81155.496.86$126,317
Oct 200805,64175.246.92$39,047
Sep 2008012,479101.767.88$98,298
Aug 200806,141114.228.48$52,094
Jul 2008704,848131.0811.39$64,392
Jun 200818811,792131.3313.03$178,371
May 2008028,956123.1711.57$335,145
Apr 200818349,520110.3110.45$537,911
Mar 200818382,098101.909.66$812,049
Feb 2008183121,07392.538.77$1,078,813
Jan 2008036,70890.388.21$301,216

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 66.74 =         $0
Gas                  125 Mcf  × $  3.32 =       $414

────────────────────────────────────────────────────
Month total                                     $414

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/235263 is the state's own key, not one this site invented.