Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236011District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Oct 2007 – May 2026
Value, last 12 filed months
$26 k
at the published price for each month
Months reported
224
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-17185521
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,632 bbl$365,197
GasProduction222,668 Mcf$1,324,774
Total$1,689,972

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7260, -100.1861. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.72599, -100.18610 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,800 ft.

Completions filed
Oct 2007
1 of 1 wells

1 well

42-21133894212,800 ftOct 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (224)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

224 months

May 20260162106.413.05$493
Apr 20260098.932.87$0
Mar 2026081889.753.15$2,576
Feb 2026031363.503.75$1,174
Jan 2026013159.138.00$1,048
Dec 2025027156.664.41$1,196
Nov 2025030058.593.93$1,178
Oct 2025061159.383.30$2,019
Sep 2025087162.743.08$2,680
Aug 202501,39163.933.01$4,194
Jul 202501,58566.743.32$5,255
Jun 202501,19566.483.13$3,739
May 2025057860.553.23$1,868
Apr 20255811062.363.54$4,007
Mar 2025017367.704.27$738
Feb 2025016570.884.34$716
Jan 2025010374.324.28$441
Dec 202407168.993.12$222
Nov 2024011269.052.20$246
Oct 2024014971.372.28$340
Sep 2024023569.612.36$556
Aug 2024036875.632.06$759
Jul 2024026779.932.15$573
Jun 2024020878.082.63$548
May 20245017778.812.20$4,330
Apr 2024011484.451.66$189
Mar 20240080.301.55$0
Feb 2024031176.091.78$555
Jan 2024017573.023.30$577
Dec 2023023971.262.61$624
Nov 2023044077.892.81$1,235
Oct 2023062185.443.09$1,917
Sep 2023073789.042.74$2,016
Aug 2023069880.522.67$1,866
Jul 2023071074.852.64$1,876
Jun 2023032568.962.26$734
May 20234618470.622.23$3,658
Apr 2023014478.122.24$322
Mar 2023013072.852.39$311
Feb 2023013875.112.47$340
Jan 2023013476.533.39$454
Dec 2022013976.415.73$796
Nov 2022021685.005.65$1,220
Oct 2022015087.185.86$880
Sep 2022018384.888.16$1,494
Aug 202202194.529.13$192
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 2021166071.323.90$11,839
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 202001438.772.71$38
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 202008139.982.39$193
Jul 2020030438.371.83$555
Jun 2020034534.901.69$583
May 2020042316.921.81$768
Apr 2020043414.751.80$783
Mar 2020045430.341.86$843
Feb 2020042649.881.98$844
Jan 2020046657.252.09$976
Dec 2019045259.012.30$1,042
Nov 2019043855.302.75$1,205
Oct 2019048553.472.42$1,173
Sep 2019045655.052.66$1,212
Aug 2019047253.112.30$1,088
Jul 2019047956.272.46$1,178
Jun 2019047652.782.49$1,186
May 20197545858.482.74$5,641
Apr 2019047662.632.75$1,309
Mar 2019050156.803.06$1,534
Feb 2019046450.852.79$1,296
Jan 2019050446.033.23$1,627
Dec 2018052146.594.19$2,181
Nov 201810449752.934.24$7,611
Oct 2018052461.443.40$1,781
Sep 2018051859.543.11$1,610
Aug 2018055959.403.07$1,714
Jul 20183956865.142.93$4,206
Jun 2018053860.183.08$1,655
May 2018056465.382.90$1,636
Apr 2018042363.842.90$1,227
Mar 2018049661.222.79$1,382
Feb 2018054561.782.77$1,508
Jan 2018062162.874.01$2,490
Dec 2017055957.272.92$1,633
Nov 2017060655.423.12$1,890
Oct 2017039449.292.98$1,176
Sep 20175747847.523.09$4,184
Aug 2017053345.373.00$1,601
Jul 2017052043.873.09$1,605
Jun 2017051542.493.09$1,590
May 201715257145.373.26$8,760
Apr 2017058347.933.21$1,872
Mar 2017065546.772.98$1,954
Feb 2017062650.452.95$1,848
Jan 2017072549.413.42$2,479
Dec 2016077448.763.72$2,881
Nov 2016084342.492.64$2,229
Oct 201619189146.193.09$11,576
Sep 2016067141.553.10$2,081
Aug 201601,07841.442.92$3,152
Jul 201601,44041.622.92$4,211
Jun 201601,02645.352.69$2,756
May 20161881,50142.521.99$10,982
Apr 2016012536.561.99$249
Mar 2016044033.011.79$789
Feb 2016094526.472.06$1,950
Jan 201601,01227.352.36$2,393
Dec 201501,14332.362.00$2,288
Nov 20150038.792.17$0
Oct 2015058443.552.43$1,417
Sep 2015072642.992.76$2,003
Aug 2015083740.162.87$2,404
Jul 2015084348.152.95$2,483
Jun 201501,14456.152.88$3,298
May 2015086955.212.96$2,568
Apr 201501,12949.822.71$3,056
Mar 201501,16042.892.93$3,404
Feb 201501,02644.662.98$3,054
Jan 2015058943.433.10$1,826
Dec 2014056154.693.59$2,015
Nov 201419261370.464.25$16,135
Oct 2014073278.303.90$2,856
Sep 2014083186.164.05$3,362
Aug 2014083889.394.04$3,381
Jul 2014089096.564.18$3,720
Jun 2014062198.164.74$2,942
May 201418667094.734.73$20,787
Apr 2014073695.944.81$3,540
Mar 2014069195.895.06$3,494
Feb 2014043697.406.19$2,700
Jan 2014065090.404.86$3,159
Dec 2013080291.824.35$3,492
Nov 2013072488.853.74$2,707
Oct 2013090397.423.78$3,413
Sep 2013188782104.113.72$22,480
Aug 20130422104.253.52$1,487
Jul 20130393102.523.72$1,461
Jun 2013053594.403.93$2,104
May 201319240494.834.15$19,884
Apr 2013037993.964.28$1,623
Mar 2013144793.623.91$1,843
Feb 2013055791.233.42$1,905
Jan 2013053191.603.42$1,816
Dec 2012128986.773.42$1,075
Nov 2012127486.953.62$1,080
Oct 201220636889.383.40$19,663
Sep 2012942194.672.92$2,081
Aug 2012044992.662.91$1,306
Jul 2012047985.133.02$1,447
Jun 2012035379.822.52$889
May 2012055491.612.49$1,379
Apr 20120480101.652.00$958
Mar 2012161300105.052.22$17,580
Feb 20120487101.102.57$1,252
Jan 2012054198.092.73$1,479
Dec 2011071396.873.24$2,310
Nov 2011057995.723.31$1,917
Oct 2011123784.983.65$950
Sep 2011039483.623.99$1,570
Aug 201118254983.404.15$17,457
Jul 2011063694.144.52$2,873
Jun 2011029892.904.64$1,383
May 2011164498.134.40$2,935
Apr 20110419105.964.33$1,816
Mar 2011144896.364.06$1,914
Feb 2011089485.644.18$3,737
Jan 201101,20686.504.59$5,534
Dec 20101971,20885.734.35$22,141
Nov 201021,46880.843.80$5,733
Oct 201021,47478.103.51$5,328
Sep 201011,22072.633.98$4,928
Aug 2010071373.684.42$3,151
Jul 201011,03572.554.74$4,975
Jun 201071,37970.364.91$7,264
May 201031,22371.124.24$5,393
Apr 201071,13281.694.12$5,239
Mar 20101951,30378.394.39$21,004
Feb 201001,52673.585.44$8,305
Jan 201041,31874.365.96$8,158
Dec 200921,49471.445.48$8,336
Nov 200952,27974.593.75$8,923
Oct 20091952,23472.544.11$23,328
Sep 200901,68865.543.06$5,173
Aug 200901,38367.423.22$4,451
Jul 200931,72161.133.46$6,146
Jun 200941,86866.163.90$7,541
May 20091882,48954.743.93$20,062
Apr 200902,76146.773.59$9,905
Mar 20091952,42442.144.06$18,056
Feb 200912,60232.814.63$12,088
Jan 200923,32035.865.37$17,903
Dec 20081953,94737.105.98$30,826
Nov 200814,94155.496.86$33,953
Oct 20082054,94175.246.92$49,626
Sep 20081915,387101.767.88$61,870
Aug 200806,048114.228.48$51,305
Jul 200806,445131.0811.39$73,405
Jun 20081957,486131.3313.03$123,172
May 200838312,549123.1711.57$192,420
Apr 200807,205110.3110.45$75,327
Mar 200805,901101.909.66$57,028
Feb 200806,30392.538.77$55,281
Jan 200807,09490.388.21$58,211
Dec 200706,73888.337.30$49,201
Nov 200708,74491.677.29$63,759
Oct 200701,80182.856.92$12,466

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  162 Mcf  × $  3.05 =       $493

────────────────────────────────────────────────────
Month total                                     $493

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/236011 is the state's own key, not one this site invented.