RAMP RANCH

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the RAMP, NE. (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236326District 10Field 744634442 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.1 M
Jan 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 28 leases and 28 wells, and the rule below applies to all of them.

Discovered
1976-01-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 04/01/99.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-17185524
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,898 bbl$304,625
GasProduction557,903 Mcf$2,842,560
Total$3,147,185

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7765, -100.1727. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.77654, -100.17271 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,006 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,006 ft.

Completions filed
Jun 2013
1 of 1 wells

1 well

42-21133931702513,006 ftJun 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 202437076.091.78$2,815
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 2023049978.122.24$1,117
Mar 202310587272.852.39$9,736
Feb 2023075375.112.47$1,857
Jan 202301,08276.533.39$3,666
Dec 2022090376.415.73$5,173
Nov 2022063985.005.65$3,608
Oct 2022088587.185.86$5,189
Sep 2022095484.888.16$7,788
Aug 202201,00594.529.13$9,173
Jul 202201,065101.587.54$8,032
Jun 202201,042115.097.98$8,312
May 202201,089109.378.43$9,184
Apr 202201,032104.226.84$7,056
Mar 20220677108.885.08$3,437
Feb 2022083491.054.86$4,052
Jan 202201,01981.844.54$4,624
Dec 202101,00271.323.90$3,907
Nov 2021094577.435.24$4,949
Oct 2021096979.795.71$5,537
Sep 202101,01469.865.35$5,426
Aug 202101,05066.024.22$4,432
Jul 202101,17370.783.98$4,671
Jun 202101,10269.493.38$3,725
May 202113295563.483.02$11,261
Apr 2021080360.362.76$2,215
Mar 202101,30961.302.72$3,556
Feb 2021077257.805.55$4,283
Jan 202101,05450.412.81$2,962
Dec 202001,03944.642.68$2,780
Nov 202001,00738.772.71$2,726
Oct 202001,11636.972.48$2,766
Sep 2020057837.091.99$1,151
Aug 2020092139.982.39$2,197
Jul 202001,02638.371.83$1,873
Jun 202001,14434.901.69$1,934
May 202001,21816.921.81$2,210
Apr 202001,21214.751.80$2,187
Mar 202001,26430.341.86$2,346
Feb 202001,19149.881.98$2,359
Jan 202001,27757.252.09$2,675
Dec 201901,31259.012.30$3,023
Nov 20191811,24055.302.75$13,420
Oct 201901,28753.472.42$3,113
Sep 201901,21255.052.66$3,221
Aug 201901,37353.112.30$3,164
Jul 201901,10756.272.46$2,723
Jun 201901,10652.782.49$2,755
May 201901,15358.482.74$3,160
Apr 201901,22662.632.75$3,372
Mar 201901,22556.803.06$3,751
Feb 201901,28050.852.79$3,574
Jan 201901,24346.033.23$4,013
Dec 201801,42346.594.19$5,956
Nov 201801,28252.934.24$5,432
Oct 201801,35261.443.40$4,594
Sep 201801,42759.543.11$4,435
Aug 201801,44359.403.07$4,425
Jul 201801,62765.142.93$4,770
Jun 201801,64460.183.08$5,058
May 20181931,49465.382.90$16,952
Apr 201801,67163.842.90$4,847
Mar 201811,82061.222.79$5,133
Feb 201801,62161.782.77$4,484
Jan 201801,73362.874.01$6,948
Dec 201701,45757.272.92$4,257
Nov 201701,79855.423.12$5,607
Oct 201701,72349.292.98$5,141
Sep 201701,57447.523.09$4,859
Aug 201701,70545.373.00$5,123
Jul 201701,71443.873.09$5,292
Jun 201701,73842.493.09$5,366
May 201702,05445.373.26$6,703
Apr 201702,13947.933.21$6,870
Mar 201701,90746.772.98$5,690
Feb 201701,89650.452.95$5,598
Jan 201701,34449.413.42$4,595
Dec 201601,98248.763.72$7,379
Nov 201611,64742.492.64$4,398
Oct 20161952,03546.193.09$15,296
Sep 201602,03241.553.10$6,300
Aug 201612,05041.442.92$6,036
Jul 201602,20441.622.92$6,445
Jun 201601,54245.352.69$4,142
May 201601,95442.521.99$3,890
Apr 201602,03436.561.99$4,050
Mar 201601,57033.011.79$2,817
Feb 201651,80726.472.06$3,861
Jan 201601,48127.352.36$3,502
Dec 201501,02532.362.00$2,051
Nov 2015090438.792.17$1,959
Oct 201511,67943.552.43$4,118
Sep 201511,74742.992.76$4,862
Aug 201501,97540.162.87$5,673
Jul 201522,36548.152.95$7,061
Jun 201512,42756.152.88$7,053
May 201502,04255.212.96$6,035
Apr 2015992,26749.822.71$11,068
Mar 201502,25242.892.93$6,609
Feb 201512,02244.662.98$6,063
Jan 20151922,08443.433.10$14,800
Dec 201402,39454.693.59$8,598
Nov 201402,18170.464.25$9,273
Oct 201412,15878.303.90$8,497
Sep 201402,28586.164.05$9,244
Aug 201402,28389.394.04$9,212
Jul 201402,41296.564.18$10,081
Jun 201412,33798.164.74$11,168
May 201402,35594.734.73$11,131
Apr 201402,32295.944.81$11,167
Mar 201402,49195.895.06$12,596
Feb 201402,18397.406.19$13,517
Jan 201402,67590.404.86$13,002
Dec 201301,48791.824.35$6,475
Nov 201302,60688.853.74$9,742
Oct 20131762,64597.423.78$27,142
Sep 201302,788104.113.72$10,365
Aug 201302,824104.253.52$9,948
Jul 201302,593102.523.72$9,640
Jun 201302,59894.403.93$10,219
May 201303,34194.834.15$13,862
Apr 201303,43993.964.28$14,728
Mar 201302,09093.623.91$8,178
Feb 201302,58791.233.42$8,847
Jan 201303,14591.603.42$10,756
Dec 201222,62386.773.42$9,145
Nov 201232,34786.953.62$8,769
Oct 20121732,42989.383.40$23,721
Sep 201272,93294.672.92$9,219
Aug 201253,11692.662.91$9,525
Jul 201203,06585.133.02$9,259
Jun 201202,81979.822.52$7,101
May 201213,03091.612.49$7,631
Apr 201202,924101.652.00$5,839
Mar 201232,212105.052.22$5,230
Feb 201202,678101.102.57$6,883
Jan 20121863,61598.092.73$28,128
Dec 201113,73296.873.24$12,188
Nov 201123,47195.723.31$11,685
Oct 201113,78384.983.65$13,887
Sep 201103,80883.623.99$15,178
Aug 201124,18583.404.15$17,532
Jul 201133,82994.144.52$17,579
Jun 201121,90792.904.64$9,034
May 201133,38798.134.40$15,214
Apr 20112002,073105.964.33$30,175
Mar 201113,71296.364.06$15,157
Feb 20111983,83885.644.18$32,999
Jan 201134,59986.504.59$21,363
Dec 201023,95485.734.35$17,362
Nov 201014,15580.843.80$15,850
Oct 201024,55978.103.51$16,153
Sep 201004,13772.633.98$16,463
Aug 201014,68373.684.42$20,770
Jul 201004,93772.554.74$23,384
Jun 201024,59770.364.91$22,714
May 201034,93271.124.24$21,101
Apr 201024,83781.694.12$20,105
Mar 20102015,26478.394.39$38,858
Feb 201004,85873.585.44$26,439
Jan 201005,66374.365.96$33,775
Dec 200925,80571.445.48$31,976
Nov 200935,84874.593.75$22,163
Oct 20091906,27372.544.11$39,566
Sep 200956,36565.543.06$19,835
Aug 200966,73867.423.22$22,091
Jul 200958,64361.133.46$30,249
Jun 200949,00566.163.90$35,339
May 20091889,50854.743.93$47,617
Apr 200929,80146.773.59$35,255
Mar 2009212,50542.144.06$50,842
Feb 20091957,36232.814.63$40,506
Jan 200917,92935.865.37$42,623
Dec 20081958,50137.105.98$58,046
Nov 200808,58355.496.86$58,882
Oct 200849,87375.246.92$68,642
Sep 20081919,640101.767.88$95,371
Aug 200819011,248114.228.48$117,119
Jul 200819110,450131.0811.39$144,056
Jun 200818813,040131.3313.03$194,636
May 2008018,967123.1711.57$219,530
Apr 200809,773110.3110.45$102,175
Mar 2008013,933101.909.66$134,649
Feb 2008014,42392.538.77$126,498
Jan 200801,81390.388.21$14,877

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2024 — as filed, then multipliedworked
Condensate            37 bbl  × $ 76.09 =     $2,815
Gas                    0 Mcf  × $  1.78 =         $0

────────────────────────────────────────────────────
Month total                                   $2,815

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/236326 is the state's own key, not one this site invented.