RAMP

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238380District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Feb 2008 – May 2026
Value, last 12 filed months
$32 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-07-23193276
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,964 bbl$392,740
GasProduction516,476 Mcf$2,791,761
Total$3,184,502

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7584, -100.1383. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.75835, -100.13829 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,217 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,217 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-21134091500813,217 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 202600106.413.05$0
Apr 2026070898.932.87$2,032
Mar 2026071489.753.15$2,249
Feb 2026069663.503.75$2,610
Jan 2026076559.138.00$6,118
Dec 2025072356.664.41$3,191
Nov 2025066558.593.93$2,611
Oct 2025073059.383.30$2,413
Sep 2025071262.743.08$2,191
Aug 2025070863.933.01$2,134
Jul 2025069666.743.32$2,307
Jun 202501,38166.483.13$4,321
May 202501,36260.553.23$4,402
Apr 2025095362.363.54$3,377
Mar 2025077067.704.27$3,287
Feb 2025064170.884.34$2,782
Jan 202501,01074.324.28$4,321
Dec 20246594068.993.12$7,418
Nov 202401,14069.052.20$2,506
Oct 2024093771.372.28$2,138
Sep 202401,11769.612.36$2,641
Aug 2024082775.632.06$1,707
Jul 2024063979.932.15$1,372
Jun 2024059978.082.63$1,578
May 2024073178.812.20$1,607
Apr 2024058484.451.66$969
Mar 20243755180.301.55$3,822
Feb 2024052376.091.78$933
Jan 2024053973.023.30$1,777
Dec 2023060571.262.61$1,579
Nov 2023064077.892.81$1,797
Oct 2023075985.443.09$2,343
Sep 2023068789.042.74$1,879
Aug 2023062280.522.67$1,663
Jul 2023063774.852.64$1,683
Jun 20236556968.962.26$5,767
May 2023070270.622.23$1,564
Apr 2023069778.122.24$1,560
Mar 2023068472.852.39$1,637
Feb 2023058275.112.47$1,435
Jan 2023071976.533.39$2,436
Dec 2022077976.415.73$4,463
Nov 2022079885.005.65$4,506
Oct 2022090587.185.86$5,307
Sep 2022084184.888.16$6,866
Aug 2022091294.529.13$8,324
Jul 202261909101.587.54$13,052
Jun 20220721115.097.98$5,752
May 20221871,016109.378.43$29,020
Apr 20220955104.226.84$6,530
Mar 20220441108.885.08$2,239
Feb 2022057291.054.86$2,779
Jan 2022062881.844.54$2,850
Dec 2021052171.323.90$2,031
Nov 2021046377.435.24$2,425
Oct 2021047879.795.71$2,731
Sep 2021048469.865.35$2,590
Aug 2021063466.024.22$2,676
Jul 2021054170.783.98$2,154
Jun 2021038869.493.38$1,312
May 2021056763.483.02$1,711
Apr 2021048860.362.76$1,346
Mar 2021076461.302.72$2,076
Feb 2021063157.805.55$3,501
Jan 2021099450.412.81$2,793
Dec 202001,07244.642.68$2,868
Nov 202001,07938.772.71$2,920
Oct 2020093936.972.48$2,327
Sep 2020099437.091.99$1,979
Aug 2020094539.982.39$2,254
Jul 202001,06338.371.83$1,940
Jun 202001,02734.901.69$1,736
May 202001,06316.921.81$1,929
Apr 202001,02014.751.80$1,840
Mar 202001,05530.341.86$1,958
Feb 20201281,01449.881.98$8,393
Jan 202001,07757.252.09$2,256
Dec 201901,06459.012.30$2,452
Nov 2019099455.302.75$2,734
Oct 201901,05053.472.42$2,539
Sep 201901,02355.052.66$2,718
Aug 201901,03953.112.30$2,394
Jul 2019431,06256.272.46$5,032
Jun 201901,02252.782.49$2,546
May 20193196258.482.74$4,449
Apr 201901,06362.632.75$2,924
Mar 2019681,07556.803.06$7,154
Feb 2019097950.852.79$2,734
Jan 201901,05746.033.23$3,412
Dec 2018851,07746.594.19$8,468
Nov 201801,09152.934.24$4,623
Oct 201801,13261.443.40$3,847
Sep 201801,08759.543.11$3,378
Aug 2018901,12759.403.07$8,802
Jul 201801,15165.142.93$3,375
Jun 201801,10560.183.08$3,400
May 201801,15065.382.90$3,336
Apr 201801,13763.842.90$3,298
Mar 201811,15661.222.79$3,283
Feb 20181991,04061.782.77$15,171
Jan 201811,15662.874.01$4,698
Dec 201701,15157.272.92$3,363
Nov 201701,22055.423.12$3,804
Oct 201701,25749.292.98$3,750
Sep 201701,16347.523.09$3,591
Aug 201701,19645.373.00$3,593
Jul 201701,19543.873.09$3,689
Jun 20171721,13042.493.09$10,797
May 201711,15445.373.26$3,811
Apr 201711,10847.933.21$3,606
Mar 201701,28846.772.98$3,843
Feb 201711,33050.452.95$3,977
Jan 201711,61249.413.42$5,561
Dec 201611,34248.763.72$5,045
Nov 201601,19742.492.64$3,165
Oct 201601,02546.193.09$3,168
Sep 201601,37841.553.10$4,273
Aug 201601,26741.442.92$3,705
Jul 2016091641.622.92$2,679
Jun 201601,63245.352.69$4,383
May 201601,24542.521.99$2,479
Apr 201601,22436.561.99$2,437
Mar 201601,15133.011.79$2,065
Feb 201601,01926.472.06$2,103
Jan 201601,07827.352.36$2,549
Dec 201501,02332.362.00$2,047
Nov 201501,06938.792.17$2,317
Oct 201501,07543.552.43$2,609
Sep 201501,10542.992.76$3,048
Aug 201501,23340.162.87$3,542
Jul 201501,24248.152.95$3,658
Jun 201501,52156.152.88$4,385
May 201501,11555.212.96$3,295
Apr 2015251,22849.822.71$4,569
Mar 201501,44642.892.93$4,244
Feb 201501,16244.662.98$3,458
Jan 201501,59243.433.10$4,936
Dec 201401,11954.693.59$4,019
Nov 2014080170.464.25$3,406
Oct 201401,44078.303.90$5,617
Sep 201401,25586.164.05$5,077
Aug 201401,05589.394.04$4,257
Jul 201401,28996.564.18$5,388
Jun 201401,96798.164.74$9,317
May 201401,14294.734.73$5,398
Apr 201401,21295.944.81$5,829
Mar 201401,32395.895.06$6,690
Feb 2014080197.406.19$4,960
Jan 201401,24590.404.86$6,052
Dec 201301,29891.824.35$5,652
Nov 201301,32688.853.74$4,957
Oct 2013621,41997.423.78$11,403
Sep 201301,435104.113.72$5,335
Aug 201301,596104.253.52$5,622
Jul 201301,541102.523.72$5,729
Jun 201301,62594.403.93$6,392
May 201301,66894.834.15$6,921
Apr 201301,85893.964.28$7,957
Mar 201321,68293.623.91$6,769
Feb 201321,89691.233.42$6,667
Jan 2013083291.603.42$2,845
Dec 201221,82086.773.42$6,398
Nov 20121841,98086.953.62$23,176
Oct 201221,97889.383.40$6,903
Sep 201201,85894.672.92$5,422
Aug 201201,99292.662.91$5,793
Jul 201202,22285.133.02$6,712
Jun 201202,12279.822.52$5,345
May 201202,32691.612.49$5,788
Apr 201202,135101.652.00$4,263
Mar 20121851,992105.052.22$23,861
Feb 201201,862101.102.57$4,786
Jan 201202,85698.092.73$7,809
Dec 201103,64296.873.24$11,799
Nov 201103,60795.723.31$11,944
Oct 201103,81684.983.65$13,923
Sep 201103,84383.623.99$15,317
Aug 20111893,48583.404.15$30,223
Jul 201103,94894.144.52$17,834
Jun 201103,81992.904.64$17,720
May 20111985,05698.134.40$41,701
Apr 201104,857105.964.33$21,047
Mar 201104,75596.364.06$19,293
Feb 201103,93985.644.18$16,465
Jan 201101,06986.504.59$4,905
Dec 201003,23485.734.35$14,061
Nov 201032,58780.843.80$10,061
Oct 201033,53578.103.51$12,638
Sep 201023,19172.633.98$12,844
Aug 20101953,49573.684.42$29,813
Jul 201004,46472.554.74$21,144
Jun 201004,68170.364.91$22,986
May 201015,18171.124.24$22,014
Apr 201005,22781.694.12$21,549
Mar 20101955,43078.394.39$39,117
Feb 201005,21273.585.44$28,366
Jan 201045,73774.365.96$34,513
Dec 200906,20771.445.48$34,038
Nov 20091936,25774.593.75$37,869
Oct 200916,82772.544.11$28,133
Sep 200937,01265.543.06$21,687
Aug 200917,51167.423.22$24,242
Jul 20091897,89161.133.46$38,892
Jun 200957,75966.163.90$30,552
May 200937,80354.743.93$30,797
Apr 20091887,87846.773.59$37,055
Mar 200938,90742.144.06$36,280
Feb 20093548,05332.814.63$48,924
Jan 2009010,40135.865.37$55,864
Dec 20081878,70537.105.98$58,969
Nov 200808,11755.496.86$55,686
Oct 20083699,29275.246.92$92,083
Sep 20081907,884101.767.88$81,437
Aug 200819911,352114.228.48$119,029
Jul 200819513,015131.0811.39$173,794
Jun 200839215,551131.3313.03$254,152
May 2008023,488123.1711.57$271,857
Apr 2008020,585110.3110.45$215,213
Mar 2008017,552101.909.66$169,624
Feb 200803,72192.538.77$32,635

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                  708 Mcf  × $  2.87 =     $2,032

────────────────────────────────────────────────────
Month total                                   $2,032

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/238380 is the state's own key, not one this site invented.