MEEK

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 241228District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.0 M
Jul 2008 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
215
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-11-24185243
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,751 bbl$632,675
GasProduction529,828 Mcf$2,384,302
Total$3,016,978

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6465, -100.3048. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.64646, -100.30481 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,490 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,490 ft.

Completions filed
Jul 2008
1 of 1 wells

1 well

42-21134186404513,490 ftJul 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (215)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

215 months

May 20266138106.413.05$1,059
Apr 2026016598.932.87$474
Mar 2026018389.753.15$576
Feb 2026013463.503.75$503
Jan 2026010959.138.00$872
Dec 2025011056.664.41$485
Nov 20253110258.593.93$2,217
Oct 2025014159.383.30$466
Sep 2025029862.743.08$917
Aug 202508963.933.01$268
Jul 2025033066.743.32$1,094
Jun 2025018066.483.13$563
May 20250060.553.23$0
Apr 202505662.363.54$198
Mar 20250067.704.27$0
Feb 2025012470.884.34$538
Jan 202503274.324.28$137
Dec 2024019668.993.12$612
Nov 2024011169.052.20$244
Oct 2024010471.372.28$237
Sep 202407769.612.36$182
Aug 2024012575.632.06$258
Jul 2024014379.932.15$307
Jun 202407378.082.63$192
May 2024011078.812.20$242
Apr 2024037384.451.66$619
Mar 20240080.301.55$0
Feb 2024022376.091.78$398
Jan 2024026373.023.30$867
Dec 2023019771.262.61$514
Nov 2023040377.892.81$1,131
Oct 2023019785.443.09$608
Sep 2023034989.042.74$955
Aug 2023029280.522.67$780
Jul 2023030274.852.64$798
Jun 2023028868.962.26$650
May 2023276870.622.23$2,058
Apr 2023015578.122.24$347
Mar 2023023672.852.39$565
Feb 2023018375.112.47$451
Jan 2023016976.533.39$573
Dec 2022027776.415.73$1,587
Nov 2022014585.005.65$819
Oct 2022024887.185.86$1,454
Sep 2022026684.888.16$2,172
Aug 2022031094.529.13$2,829
Jul 202279371101.587.54$10,823
Jun 20220383115.097.98$3,055
May 20220391109.378.43$3,297
Apr 20220628104.226.84$4,294
Mar 202201,014108.885.08$5,147
Feb 2022052691.054.86$2,556
Jan 2022080781.844.54$3,662
Dec 2021090171.323.90$3,513
Nov 202102,34677.435.24$12,286
Oct 202101,29379.795.71$7,388
Sep 202101,23769.865.35$6,619
Aug 202101,28566.024.22$5,423
Jul 202101,30870.783.98$5,209
Jun 202101,19169.493.38$4,026
May 202101,14563.483.02$3,455
Apr 2021066260.362.76$1,826
Mar 2021061461.302.72$1,668
Feb 2021030757.805.55$1,703
Jan 2021033550.412.81$941
Dec 20209314644.642.68$4,542
Nov 2020020738.772.71$560
Oct 2020011036.972.48$273
Sep 2020018237.091.99$362
Aug 2020037639.982.39$897
Jul 20208926338.371.83$3,895
Jun 2020030034.901.69$507
May 2020033416.921.81$606
Apr 202001,48014.751.80$2,670
Mar 202001,16330.341.86$2,159
Feb 2020085249.881.98$1,688
Jan 2020094257.252.09$1,973
Dec 2019094859.012.30$2,185
Nov 201901,03255.302.75$2,839
Oct 2019098253.472.42$2,375
Sep 201901,35755.052.66$3,606
Aug 201901,34153.112.30$3,090
Jul 201901,20656.272.46$2,967
Jun 2019091952.782.49$2,289
May 2019068858.482.74$1,885
Apr 2019560962.632.75$1,988
Mar 2019061756.803.06$1,889
Feb 2019033050.852.79$921
Jan 2019050846.033.23$1,640
Dec 2018039746.594.19$1,662
Nov 2018045452.934.24$1,924
Oct 2018049861.443.40$1,692
Sep 2018047059.543.11$1,461
Aug 201801,24059.403.07$3,803
Jul 201801,88265.142.93$5,518
Jun 2018991,78660.183.08$11,453
May 201801,82665.382.90$5,297
Apr 201801,82263.842.90$5,285
Mar 201801,94561.222.79$5,420
Feb 201801,80961.782.77$5,004
Jan 201801,86062.874.01$7,457
Dec 201702,00157.272.92$5,846
Nov 201701,70255.423.12$5,307
Oct 201701,63849.292.98$4,887
Sep 201701,50847.523.09$4,656
Aug 201701,89345.373.00$5,687
Jul 201701,86343.873.09$5,752
Jun 201701,79642.493.09$5,545
May 201701,66145.373.26$5,421
Apr 201701,53847.933.21$4,939
Mar 201701,62746.772.98$4,854
Feb 201701,50950.452.95$4,455
Jan 201701,58049.413.42$5,402
Dec 201601,39348.763.72$5,186
Nov 201601,53842.492.64$4,067
Oct 201601,74346.193.09$5,386
Sep 201601,77641.553.10$5,507
Aug 201601,92441.442.92$5,626
Jul 201612,16841.622.92$6,382
Jun 201642,56245.352.69$7,063
May 201632,53142.521.99$5,167
Apr 201632,46736.561.99$5,022
Mar 20161072,22933.011.79$7,531
Feb 201611,91326.472.06$3,974
Jan 201602,39827.352.36$5,670
Dec 201522,64332.362.00$5,354
Nov 201512,59638.792.17$5,665
Oct 201512,28343.552.43$5,583
Sep 201511,93942.992.76$5,392
Aug 201502,16440.162.87$6,216
Jul 201502,26448.152.95$6,668
Jun 201542,31556.152.88$6,898
May 201502,47055.212.96$7,300
Apr 201572,58149.822.71$7,334
Mar 201582,56542.892.93$7,871
Feb 201552,11344.662.98$6,512
Jan 201572,59843.433.10$8,359
Dec 201442,59754.693.59$9,546
Nov 201402,38170.464.25$10,124
Oct 201402,66478.303.90$10,392
Sep 201402,64586.164.05$10,700
Aug 201412,95189.394.04$11,997
Jul 201432,78596.564.18$11,930
Jun 201433,24298.164.74$15,651
May 201413738,03294.734.73$192,739
Apr 201474,66495.944.81$23,101
Mar 2014114,19395.895.06$22,258
Feb 201404,56097.406.19$28,236
Jan 201406,20190.404.86$30,141
Dec 201304,74891.824.35$20,675
Nov 201304,01788.853.74$15,017
Oct 201303,91697.423.78$14,800
Sep 20131093,443104.113.72$24,148
Aug 201303,804104.253.52$13,400
Jul 201303,782102.523.72$14,060
Jun 2013153,62594.403.93$15,675
May 2013194,10994.834.15$18,850
Apr 2013203,99493.964.28$18,984
Mar 20131474,31193.623.91$30,631
Feb 2013243,37491.233.42$13,728
Jan 2013224,61991.603.42$17,812
Dec 2012163,98886.773.42$15,028
Nov 2012163,71586.953.62$14,858
Oct 20121563,72089.383.40$26,590
Sep 2012012494.672.92$362
Aug 201203,09992.662.91$9,012
Jul 20121332,55885.133.02$19,050
Jun 201262,87579.822.52$7,721
May 20121323,11291.612.49$19,836
Apr 201283,042101.652.00$6,887
Mar 20121362,689105.052.22$20,262
Feb 2012153,942101.102.57$11,648
Jan 2012823,95598.092.73$18,857
Dec 201103,11796.873.24$10,098
Nov 20111213,72195.723.31$23,903
Oct 2011113,25684.983.65$12,814
Sep 20111022,60183.623.99$18,896
Aug 2011931,70183.404.15$14,814
Jul 201162,29294.144.52$10,918
Jun 20111062,72192.904.64$22,473
May 20111145,36998.134.40$34,836
Apr 2011815,453105.964.33$32,212
Mar 20111953,11696.364.06$31,433
Feb 201102,80785.644.18$11,733
Jan 20111103,50986.504.59$25,617
Dec 20101354,39185.734.35$30,665
Nov 2010214,48780.843.80$18,727
Oct 20101424,97578.103.51$28,547
Sep 20101395,49972.633.98$31,979
Aug 20101326,34373.684.42$37,758
Jul 20101286,78272.554.74$41,409
Jun 20101577,20770.364.91$46,436
May 20101728,33971.124.24$47,550
Apr 20102059,13981.694.12$54,424
Mar 201019611,07678.394.39$63,973
Feb 201041611,88473.585.44$95,286
Jan 201042217,92874.365.96$138,304
Dec 200969716,49971.445.48$140,270
Nov 2009821,83774.593.75$13,008
Oct 2009172,19172.544.11$10,239
Sep 2009812,34665.543.06$12,499
Aug 2009562,46667.423.22$11,712
Jul 2009262,46861.133.46$10,140
Jun 2009762,30866.163.90$14,018
May 2009802,30254.743.93$13,416
Apr 2009261,94846.773.59$8,204
Mar 2009752,30842.144.06$12,529
Feb 2009772,35232.814.63$13,423
Jan 2009882,82435.865.37$18,323
Dec 20081083,17037.105.98$22,954
Nov 20081253,94155.496.86$33,973
Oct 20081676,14375.246.92$55,087
Sep 20081858,803101.767.88$88,168
Aug 200822715,508114.228.48$157,483
Jul 200854820,037131.0811.39$300,042

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             6 bbl  × $106.41 =       $638
Gas                  138 Mcf  × $  3.05 =       $420

────────────────────────────────────────────────────
Month total                                   $1,059

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/241228 is the state's own key, not one this site invented.