MARIAN OSBORNE 26

Operated by BCE-MACH III LLC (P-5 40209) in the RED DEER CREEK (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 241472District 10Field 752003002 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.2 M
Jul 2008 – May 2026
Value, last 12 filed months
$71 k
at the published price for each month
Months reported
215
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 157 leases and 157 wells, and the rule below applies to all of them.

Discovered
1978-03-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-09-09.

The Commission's schedule remark for this field reads: AND PLAT AS LONG AS THE ALLOCATION IS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-01-15188504
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,216 bbl$1,047,231
GasProduction1,135,883 Mcf$5,130,206
Total$6,177,437

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7717, -100.6027. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.77171, -100.60271 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
no depth filed
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

Completions filed
Jul 2008
1 of 1 wells

1 well

42-3933210230Jul 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (215)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

215 months

May 202601,429106.413.05$4,353
Apr 202601,34898.932.87$3,868
Mar 202601,38689.753.15$4,365
Feb 202601,35163.503.75$5,067
Jan 202601,31059.138.00$10,477
Dec 202501,34256.664.41$5,923
Nov 202501,40958.593.93$5,532
Oct 202501,43759.383.30$4,749
Sep 202501,44662.743.08$4,449
Aug 202501,55463.933.01$4,685
Jul 20251061,69066.743.32$12,677
Jun 202501,66866.483.13$5,219
May 20250060.553.23$0
Apr 202501,47162.363.54$5,212
Mar 202501,53267.704.27$6,539
Feb 202501,44870.884.34$6,286
Jan 202501,57474.324.28$6,735
Dec 20241891,61568.993.12$18,080
Nov 202401,64169.052.20$3,608
Oct 202401,93471.372.28$4,412
Sep 202401,97569.612.36$4,670
Aug 202402,10475.632.06$4,342
Jul 202402,01279.932.15$4,319
Jun 202402,06578.082.63$5,439
May 20241962,20978.812.20$20,303
Apr 202402,03484.451.66$3,375
Mar 202402,07480.301.55$3,205
Feb 202401,98276.091.78$3,535
Jan 202402,23673.023.30$7,374
Dec 202302,38471.262.61$6,224
Nov 202302,32377.892.81$6,522
Oct 202302,42385.443.09$7,480
Sep 20231942,38389.042.74$23,791
Aug 202302,44880.522.67$6,543
Jul 202302,31774.852.64$6,121
Jun 202302,24468.962.26$5,068
May 202302,29170.622.23$5,103
Apr 202302,23878.122.24$5,008
Mar 202302,35372.852.39$5,631
Feb 20231892,10975.112.47$19,396
Jan 202302,34876.533.39$7,954
Dec 202202,35976.415.73$13,515
Nov 202202,29185.005.65$12,935
Oct 202202,36087.185.86$13,838
Sep 2022792,25384.888.16$25,098
Aug 2022352,32594.529.13$24,529
Jul 202202,329101.587.54$17,566
Jun 202202,244115.097.98$17,901
May 202202,306109.378.43$19,447
Apr 20221872,203104.226.84$34,552
Mar 202202,240108.885.08$11,371
Feb 202202,05191.054.86$9,965
Jan 202202,23981.844.54$10,160
Dec 202102,28671.323.90$8,913
Nov 202102,06877.435.24$10,830
Oct 20211932,40179.795.71$29,118
Sep 202102,25169.865.35$12,045
Aug 202102,37566.024.22$10,024
Jul 202102,38270.783.98$9,485
Jun 202122,33069.493.38$8,016
May 20211942,48163.483.02$19,802
Apr 202102,57960.362.76$7,114
Mar 202102,20761.302.72$5,996
Feb 202102,04157.805.55$11,323
Jan 202102,13350.412.81$5,994
Dec 2020242,31244.642.68$7,257
Nov 202062,18838.772.71$6,155
Oct 202062,61236.972.48$6,695
Sep 20202012,62037.091.99$12,672
Aug 202002,80339.982.39$6,685
Jul 202062,83138.371.83$5,397
Jun 2020132,79134.901.69$5,171
May 2020283,36916.921.81$6,588
Apr 20206599714.751.80$2,758
Mar 202052,41930.341.86$4,642
Feb 20201952,60049.881.98$14,876
Jan 202002,77657.252.09$5,815
Dec 201992,75259.012.30$6,873
Nov 201922,47655.302.75$6,921
Oct 201902,54153.472.42$6,146
Sep 201902,50355.052.66$6,651
Aug 201902,62953.112.30$6,058
Jul 20191892,55456.272.46$16,918
Jun 2019342,46552.782.49$7,935
May 201902,48558.482.74$6,810
Apr 201932,76862.632.75$7,802
Mar 201922,46156.803.06$7,649
Feb 201902,33950.852.79$6,531
Jan 201922,76246.033.23$9,008
Dec 20183912,77746.594.19$29,840
Nov 201802,75952.934.24$11,691
Oct 201802,80461.443.40$9,528
Sep 201832,76559.543.11$8,772
Aug 201802,93359.403.07$8,994
Jul 20181842,97065.142.93$20,693
Jun 201822,77960.183.08$8,671
May 201842,87965.382.90$8,613
Apr 201802,89363.842.90$8,392
Mar 20181933,08561.222.79$20,413
Feb 201802,59261.782.77$7,170
Jan 201802,88162.874.01$11,551
Dec 201702,93557.272.92$8,575
Nov 20171162,90855.423.12$15,497
Oct 201733,10249.292.98$9,403
Sep 201722,92247.523.09$9,116
Aug 201702,96145.373.00$8,896
Jul 20171903,39443.873.09$18,814
Jun 201743,18042.493.09$9,988
May 201703,22645.373.26$10,528
Apr 201703,05447.933.21$9,808
Mar 201703,04746.772.98$9,091
Feb 201702,76550.452.95$8,164
Jan 2017433,10249.413.42$12,730
Dec 201613,19748.763.72$11,951
Nov 20161883,09242.492.64$16,164
Oct 201603,13546.193.09$9,688
Sep 201603,07341.553.10$9,528
Aug 201603,34341.442.92$9,776
Jul 20161833,39941.622.92$17,556
Jun 201603,32745.352.69$8,936
May 201603,47942.521.99$6,927
Apr 201603,29536.561.99$6,560
Mar 20161813,42733.011.79$12,123
Feb 201613,26326.472.06$6,760
Jan 201603,44527.352.36$8,145
Dec 201513,75532.362.00$7,548
Nov 201503,66938.792.17$7,952
Oct 201503,87743.552.43$9,408
Sep 201503,78542.992.76$10,441
Aug 201503,99640.162.87$11,478
Jul 201514,34448.152.95$12,842
Jun 201523,90456.152.88$11,367
May 201504,08855.212.96$12,082
Apr 201503,91449.822.71$10,594
Mar 201504,91042.892.93$14,409
Feb 201504,04744.662.98$12,045
Jan 201504,72443.433.10$14,647
Dec 201404,67954.693.59$16,804
Nov 201404,27070.464.25$18,155
Oct 201404,36178.303.90$17,012
Sep 201404,26486.164.05$17,250
Aug 201414,46989.394.04$18,122
Jul 201414,54596.564.18$19,093
Jun 201404,45898.164.74$21,117
May 201404,72394.734.73$22,324
Apr 201404,57195.944.81$21,982
Mar 201414,80095.895.06$24,369
Feb 201404,23797.406.19$26,236
Jan 201404,86090.404.86$23,623
Dec 201314,93791.824.35$21,590
Nov 201304,94088.853.74$18,467
Oct 20131815,29997.423.78$37,660
Sep 201304,811104.113.72$17,886
Aug 20131805,275104.253.52$37,347
Jul 201305,387102.523.72$20,027
Jun 20131875,40994.403.93$38,929
May 201305,81594.834.15$24,127
Apr 201305,36993.964.28$22,993
Mar 20131955,38593.623.91$39,327
Feb 20131924,96991.233.42$34,510
Jan 201305,26491.603.42$18,002
Dec 20121735,04986.773.42$32,280
Nov 201204,98886.953.62$18,081
Oct 20121595,16089.383.40$31,754
Sep 201204,89794.672.92$14,291
Aug 201204,96792.662.91$14,445
Jul 201204,94485.133.02$14,935
Jun 20121694,95479.822.52$25,969
May 20121855,59891.612.49$30,877
Apr 201204,985101.652.00$9,954
Mar 201206,110105.052.22$13,577
Feb 20121955,834101.102.57$34,709
Jan 201206,23098.092.73$17,033
Dec 201106,18596.873.24$20,038
Nov 20111786,34495.723.31$38,045
Oct 201106,81484.983.65$24,861
Sep 201106,73283.623.99$26,832
Aug 20111707,08283.404.15$43,563
Jul 201107,29094.144.52$32,931
Jun 201107,33492.904.64$34,029
May 20111677,75198.134.40$50,529
Apr 20113397,471105.964.33$68,294
Mar 201108,14796.364.06$33,055
Feb 201106,99085.644.18$29,218
Jan 201108,33986.504.59$38,266
Dec 201008,25785.734.35$35,899
Nov 201008,19880.843.80$31,114
Oct 20101608,63978.103.51$42,809
Sep 20101678,60772.633.98$46,381
Aug 20101859,09773.684.42$53,834
Jul 201009,68272.554.74$45,859
Jun 201009,76470.364.91$47,945
May 201017310,22171.124.24$55,592
Apr 2010010,34481.694.12$42,645
Mar 201019210,93378.394.39$63,032
Feb 2010010,35773.585.44$56,367
Jan 201018812,13674.365.96$86,360
Dec 200919512,09171.445.48$80,235
Nov 2009012,24974.593.75$45,952
Oct 200918712,80672.544.11$66,201
Sep 200917713,15465.543.06$51,914
Aug 200916914,46267.423.22$57,940
Jul 200917315,45961.133.46$64,133
Jun 200919215,91166.163.90$74,676
May 200918317,51554.743.93$78,777
Apr 200938718,13846.773.59$83,170
Mar 200934219,92742.144.06$95,296
Feb 200934619,76132.814.63$102,905
Jan 200937823,49035.865.37$139,720
Dec 200854826,25937.105.98$177,285
Nov 200856528,75655.496.86$228,628
Oct 200837833,93975.246.92$263,366
Sep 200873237,371101.767.88$368,863
Aug 200892348,549114.228.48$517,267
Jul 200855532,394131.0811.39$441,699

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,429 Mcf  × $  3.05 =     $4,353

────────────────────────────────────────────────────
Month total                                   $4,353

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/241472 is the state's own key, not one this site invented.