HOOVER

Operated by UNITED OIL & SHALE LLC (P-5 103207) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 241803District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.1 M
Jun 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
216
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-02-09196654
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,530 bbl$778,442
GasProduction491,348 Mcf$2,348,915
Total$3,127,356

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7732, -100.2969. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.77318, -100.29693 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,700 ft.

Completions filed
Jun 2008
1 of 1 wells

1 well

42-21134193191812,700 ftJun 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (216)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

216 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 202321071.262.61$1,496
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 202301,06075.112.47$2,614
Jan 2023951,61376.533.39$12,735
Dec 2022261,47876.415.73$10,454
Nov 202201,41985.005.65$8,012
Oct 202201,62687.185.86$9,534
Sep 20221581,57084.888.16$26,228
Aug 202201,66894.529.13$15,224
Jul 202201,631101.587.54$12,301
Jun 202201,632115.097.98$13,019
May 202201,611109.378.43$13,586
Apr 202201,485104.226.84$10,154
Mar 2022591,766108.885.08$15,389
Feb 202201,13391.054.86$5,505
Jan 2022109081.844.54$8,921
Dec 202101,65671.323.90$6,457
Nov 202101,40177.435.24$7,337
Oct 202101,67679.795.71$9,576
Sep 2021421,61469.865.35$11,571
Aug 2021671,66666.024.22$11,455
Jul 202101,67770.783.98$6,678
Jun 2021831,61769.493.38$11,234
May 202101,69163.483.02$5,103
Apr 2021921,67060.362.76$10,160
Mar 202101,76961.302.72$4,806
Feb 2021090257.805.55$5,004
Jan 202101,64350.412.81$4,617
Dec 20201481,56144.642.68$10,783
Nov 202001,71238.772.71$4,634
Oct 202001,61536.972.48$4,003
Sep 202001,71737.091.99$3,419
Aug 2020941,89039.982.39$8,266
Jul 202001,96638.371.83$3,588
Jun 20201781,62934.901.69$8,966
May 202001,94216.921.81$3,524
Apr 202001,87814.751.80$3,389
Mar 202001,91730.341.86$3,558
Feb 202001,69349.881.98$3,353
Jan 20201971,87757.252.09$15,210
Dec 201901,88959.012.30$4,353
Nov 201901,73455.302.75$4,770
Oct 201901,72553.472.42$4,172
Sep 201901,67955.052.66$4,462
Aug 201901,72253.112.30$3,968
Jul 20191841,73256.272.46$14,615
Jun 201901,68852.782.49$4,205
May 201901,74758.482.74$4,787
Apr 201901,70462.632.75$4,687
Mar 201901,73656.803.06$5,316
Feb 20191981,58450.852.79$14,491
Jan 201901,75246.033.23$5,656
Dec 201801,83746.594.19$7,689
Nov 201801,79252.934.24$7,593
Oct 201801,86661.443.40$6,341
Sep 20181951,78959.543.11$17,171
Aug 201801,84859.403.07$5,667
Jul 201801,80765.142.93$5,298
Jun 201801,79660.183.08$5,526
May 201801,85765.382.90$5,387
Apr 20181921,82463.842.90$17,548
Mar 201811,94261.222.79$5,473
Feb 201801,78661.782.77$4,940
Jan 20181921,89962.874.01$19,685
Dec 201701,53257.272.92$4,476
Nov 201701,68355.423.12$5,248
Oct 201701,86949.292.98$5,577
Sep 201702,09547.523.09$6,468
Aug 20171921,96345.373.00$14,609
Jul 201702,06943.873.09$6,388
Jun 201701,95242.493.09$6,026
May 201711,91145.373.26$6,282
Apr 201711,79747.933.21$5,819
Mar 20171941,86846.772.98$14,647
Feb 201701,73250.452.95$5,114
Jan 201701,42849.413.42$4,882
Dec 201612,00748.763.72$7,520
Nov 201601,92442.492.64$5,088
Oct 201602,14046.193.09$6,613
Sep 20161922,07541.553.10$14,411
Aug 201602,10241.442.92$6,147
Jul 201602,11541.622.92$6,185
Jun 20161922,07845.352.69$14,288
May 201602,21242.521.99$4,404
Apr 201601,49336.561.99$2,973
Mar 201601,92433.011.79$3,452
Feb 20161791,80526.472.06$8,463
Jan 201602,02827.352.36$4,795
Dec 201501,62032.362.00$3,242
Nov 201501,85538.792.17$4,020
Oct 201501,96843.552.43$4,776
Sep 201501,97242.992.76$5,440
Aug 201502,01240.162.87$5,779
Jul 201501,91148.152.95$5,628
Jun 20151972,05956.152.88$16,997
May 20151951,95655.212.96$16,547
Apr 201501,58849.822.71$4,298
Mar 201502,08042.892.93$6,104
Feb 201501,65844.662.98$4,935
Jan 201502,03543.433.10$6,310
Dec 201402,02154.693.59$7,258
Nov 201401,88270.464.25$8,002
Oct 201402,17278.303.90$8,473
Sep 201402,12086.164.05$8,576
Aug 201402,23889.394.04$9,031
Jul 201402,31896.564.18$9,688
Jun 201401,80298.164.74$8,536
May 201401,87194.734.73$8,843
Apr 201403195.944.81$149
Mar 20141961,97495.895.06$28,777
Feb 201401,95597.406.19$12,105
Jan 201402,07490.404.86$10,081
Dec 201302,08491.824.35$9,075
Nov 201301,97588.853.74$7,383
Oct 201301,55597.423.78$5,877
Sep 2013601,679104.113.72$12,489
Aug 20131902,159104.253.52$27,413
Jul 201302,059102.523.72$7,655
Jun 201302,25094.403.93$8,850
May 201302,50394.834.15$10,385
Apr 201302,39393.964.28$10,248
Mar 20132032,53493.623.91$28,920
Feb 201302,31491.233.42$7,914
Jan 201302,55891.603.42$8,748
Dec 201222,33686.773.42$8,163
Nov 201212,48786.953.62$9,102
Oct 20121832,44389.383.40$24,662
Sep 201212,33094.672.92$6,895
Aug 201222,59592.662.91$7,732
Jul 20121992,63885.133.02$24,910
Jun 201202,48979.822.52$6,270
May 201222,72491.612.49$6,961
Apr 201202,289101.652.00$4,571
Mar 20121362,306105.052.22$19,411
Feb 201212,771101.102.57$7,223
Jan 201212,65598.092.73$7,357
Dec 20111852,49796.873.24$26,011
Nov 201122,35895.723.31$7,999
Oct 201112,42684.983.65$8,936
Sep 20111942,58583.623.99$26,526
Aug 201102,91383.404.15$12,087
Jul 201142,91094.144.52$13,522
Jun 20111973,13692.904.64$32,852
May 201113,33698.134.40$14,793
Apr 20111993,056105.964.33$34,329
Mar 201103,60196.364.06$14,610
Feb 201113,18785.644.18$13,407
Jan 201123,45086.504.59$16,004
Dec 201013,02385.734.35$13,229
Nov 20101993,57480.843.80$29,652
Oct 201044,03978.103.51$14,485
Sep 201023,60272.633.98$14,479
Aug 20101983,98373.684.42$32,191
Jul 201003,90172.554.74$18,477
Jun 201053,86970.364.91$19,350
May 20102034,22271.124.24$32,318
Apr 201044,26381.694.12$17,902
Mar 201054,32378.394.39$19,364
Feb 20101984,05673.585.44$36,643
Jan 201044,75174.365.96$28,633
Dec 20092054,61371.445.48$39,942
Nov 20091984,09274.593.75$30,120
Oct 200914,90772.544.11$20,242
Sep 20092035,28465.543.06$29,499
Aug 200945,74667.423.22$18,763
Jul 20091945,89761.133.46$32,289
Jun 20091953,80066.163.90$27,702
May 20091904,49754.743.93$28,055
Apr 20091974,35246.773.59$24,826
Mar 20091916,01342.144.06$32,456
Feb 20091895,16032.814.63$30,107
Jan 20092137,57135.865.37$48,302
Dec 20081939,49237.105.98$63,895
Nov 2008010,72855.496.86$73,598
Oct 200838010,93975.246.92$104,311
Sep 200837510,354101.767.88$119,719
Aug 200838515,886114.228.48$178,736
Jul 200875629,436131.0811.39$434,356
Jun 200809,614131.3313.03$125,296

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2023 — as filed, then multipliedworked
Condensate            21 bbl  × $ 71.26 =     $1,496
Gas                    0 Mcf  × $  2.61 =         $0

────────────────────────────────────────────────────
Month total                                   $1,496

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/241803 is the state's own key, not one this site invented.