HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the FRYE RANCH (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 242282District 10Field 331512002 tax incentive programmesCondensateGasSaveExport
Value, all time
$7.0 M
Feb 2008 – May 2026
Value, last 12 filed months
$51 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 199 leases and 218 wells, and the rule below applies to all of them.

Discovered
2007-10-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-02-04.

The Commission's schedule remark for this field reads: NO BETWEEN WELL SPACING.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-12-05183612
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,624 bbl$555,554
GasProduction1,220,217 Mcf$6,487,362
Total$7,042,916

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.4388, -100.1491. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.43876, -100.14913 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
15,450 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,450 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-4833246130115,450 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 202601,015106.413.05$3,092
Apr 20260098.932.87$0
Mar 202601,16389.753.15$3,663
Feb 202601,12963.503.75$4,234
Jan 202601,24659.138.00$9,965
Dec 202501,31956.664.41$5,821
Nov 202501,19158.593.93$4,676
Oct 202501,25259.383.30$4,138
Sep 202501,23162.743.08$3,788
Aug 202501,24563.933.01$3,753
Jul 202501,28566.743.32$4,260
Jun 202501,28166.483.13$4,008
May 202501,37660.553.23$4,448
Apr 202501,25962.363.54$4,461
Mar 202501,85467.704.27$7,913
Feb 202501,86270.884.34$8,083
Jan 202502,12574.324.28$9,092
Dec 202402,10568.993.12$6,570
Nov 202402,03869.052.20$4,480
Oct 202402,13371.372.28$4,866
Sep 202402,12069.612.36$5,012
Aug 202402,10175.632.06$4,336
Jul 202402,01879.932.15$4,332
Jun 20241072,34978.082.63$14,542
May 202402,31978.812.20$5,098
Apr 202402,09084.451.66$3,468
Mar 20240080.301.55$0
Feb 2024622,14076.091.78$8,535
Jan 202402,30973.023.30$7,614
Dec 202302,34371.262.61$6,117
Nov 202302,21377.892.81$6,213
Oct 202302,31685.443.09$7,150
Sep 202302,24389.042.74$6,135
Aug 202302,27780.522.67$6,086
Jul 202302,28574.852.64$6,037
Jun 202302,22168.962.26$5,016
May 2023942,19770.622.23$11,532
Apr 202302,25878.122.24$5,053
Mar 202302,38072.852.39$5,696
Feb 202302,19575.112.47$5,412
Jan 202302,30476.533.39$7,805
Dec 202202,29276.415.73$13,131
Nov 202202,25485.005.65$12,727
Oct 202202,29287.185.86$13,440
Sep 202202,24584.888.16$18,327
Aug 202202,05094.529.13$18,711
Jul 202202,485101.587.54$18,742
Jun 202202,449115.097.98$19,536
May 202202,535109.378.43$21,378
Apr 202202,477104.226.84$16,937
Mar 202202,518108.885.08$12,782
Feb 202202,24891.054.86$10,923
Jan 202202,60481.844.54$11,816
Dec 202102,55671.323.90$9,966
Nov 202102,48077.435.24$12,987
Oct 202102,55379.795.71$14,588
Sep 202102,28069.865.35$12,200
Aug 202102,50166.024.22$10,556
Jul 202102,52870.783.98$10,067
Jun 202102,04569.493.38$6,913
May 2021572,22463.483.02$10,330
Apr 202102,14260.362.76$5,909
Mar 202102,19561.302.72$5,964
Feb 202101,75657.805.55$9,742
Jan 202102,36950.412.81$6,658
Dec 202002,25944.642.68$6,044
Nov 202002,14138.772.71$5,795
Oct 202002,05336.972.48$5,088
Sep 2020681,99237.091.99$6,488
Aug 20201782,00239.982.39$11,891
Jul 202002,19638.371.83$4,008
Jun 202002,14134.901.69$3,619
May 202002,30316.921.81$4,179
Apr 202002,53714.751.80$4,578
Mar 2020021830.341.86$405
Feb 202002,19149.881.98$4,340
Jan 202002,89857.252.09$6,071
Dec 201902,90859.012.30$6,701
Nov 201902,69155.302.75$7,402
Oct 201903,02353.472.42$7,311
Sep 201903,18155.052.66$8,453
Aug 201903,29753.112.30$7,597
Jul 20191983,45956.272.46$19,651
Jun 201903,17152.782.49$7,900
May 201903,42958.482.74$9,397
Apr 201903,39562.632.75$9,339
Mar 2019143,58656.803.06$11,776
Feb 201903,28050.852.79$9,158
Jan 2019143,63046.033.23$12,363
Dec 2018203,54546.594.19$15,769
Nov 201803,29152.934.24$13,945
Oct 201883,47361.443.40$12,293
Sep 20181843,47759.543.11$21,762
Aug 201863,45659.403.07$10,954
Jul 201803,37365.142.93$9,889
Jun 20182133,50060.183.08$23,588
May 201863,18865.382.90$9,640
Apr 201803,34263.842.90$9,694
Mar 201882,90461.222.79$8,583
Feb 201863,04961.782.77$8,805
Jan 2018153,51162.874.01$15,020
Dec 2017133,52257.272.92$11,034
Nov 201703,52355.423.12$10,986
Oct 20171993,72849.292.98$20,932
Sep 201704,16147.523.09$12,846
Aug 201784,34245.373.00$13,408
Jul 201764,46643.873.09$14,051
Jun 2017234,49742.493.09$14,861
May 2017174,73145.373.26$16,210
Apr 201764,00547.933.21$13,150
Mar 201704,49346.772.98$13,406
Feb 2017283,54350.452.95$11,874
Jan 201774,45749.413.42$15,583
Dec 20162114,55648.763.72$27,250
Nov 2016144,43842.492.64$12,330
Oct 2016144,71346.193.09$15,211
Sep 201674,57741.553.10$14,482
Aug 2016154,79841.442.92$14,653
Jul 20161994,98741.622.92$22,866
Jun 2016125,13045.352.69$14,323
May 2016336,68742.521.99$14,717
Apr 201604,48436.561.99$8,928
Mar 20163333.011.79$104
Feb 20162022,23326.472.06$9,955
Jan 201612,42827.352.36$5,768
Dec 201552,67432.362.00$5,514
Nov 201502,53338.792.17$5,490
Oct 201512,79543.552.43$6,826
Sep 201532,68442.992.76$7,533
Aug 201502,85040.162.87$8,187
Jul 201543,06848.152.95$9,228
Jun 201543,10756.152.88$9,182
May 201502,99055.212.96$8,837
Apr 201543,10349.822.71$8,598
Mar 201532,99542.892.93$8,918
Feb 201512,68644.662.98$8,039
Jan 201503,05143.433.10$9,460
Dec 201423,15254.693.59$11,429
Nov 201423,78870.464.25$16,247
Oct 201404,11078.303.90$16,033
Sep 201434,07286.164.05$16,732
Aug 201433,61189.394.04$14,839
Jul 201423,13096.564.18$13,275
Jun 201422,80498.164.74$13,479
May 201403,04694.734.73$14,397
Apr 201403,18995.944.81$15,336
Mar 201403,43495.895.06$17,365
Feb 201403,03997.406.19$18,817
Jan 201403,31990.404.86$16,133
Dec 201303,05591.824.35$13,303
Nov 201303,34688.853.74$12,508
Oct 201303,74997.423.78$14,169
Sep 201303,878104.113.72$14,417
Aug 201303,915104.253.52$13,791
Jul 201304,070102.523.72$15,131
Jun 201303,96694.403.93$15,600
May 2013114,60094.834.15$20,129
Apr 2013164,55993.964.28$21,028
Mar 2013114,75593.623.91$19,636
Feb 201344,41291.233.42$15,454
Jan 2013104,95691.603.42$17,865
Dec 2012145,13086.773.42$18,760
Nov 2012115,07186.953.62$19,339
Oct 2012225,34689.383.40$20,141
Sep 20120094.672.92$0
Aug 201275,52292.662.91$16,707
Jul 2012135,70485.133.02$18,337
Jun 2012186,05479.822.52$16,687
May 201236,31291.612.49$15,981
Apr 2012136,257101.652.00$13,815
Mar 2012166,109105.052.22$15,255
Feb 2012336,074101.102.57$18,948
Jan 2012136,68898.092.73$19,561
Dec 201106,81196.873.24$22,066
Nov 2011286,67295.723.31$24,773
Oct 2011176,76884.983.65$26,138
Sep 2011216,76983.623.99$28,736
Aug 20112107,15083.404.15$47,182
Jul 201187,39794.144.52$34,167
Jun 201177,43292.904.64$35,134
May 201197,51198.134.40$33,968
Apr 201107,644105.964.33$33,124
Mar 2011338,09296.364.06$36,012
Feb 2011176,98685.644.18$30,657
Jan 2011488,16386.504.59$41,610
Dec 2010168,89885.734.35$40,058
Nov 201008,53380.843.80$32,386
Oct 20102499,20578.103.51$51,746
Sep 2010399,15872.633.98$39,277
Aug 20102159,42573.684.42$57,494
Jul 2010349,47672.554.74$47,350
Jun 2010279,38770.364.91$47,994
May 20102489,94671.124.24$59,761
Apr 20101049,80081.694.12$48,898
Mar 201024910,37978.394.39$65,069
Feb 2010499,45673.585.44$55,068
Jan 201023210,68774.365.96$80,990
Dec 20093311,02071.445.48$62,788
Nov 2009011,29174.593.75$42,358
Oct 20093611,94072.544.11$51,688
Sep 200917811,87965.543.06$48,072
Aug 2009012,90067.423.22$41,519
Jul 20093313,18461.133.46$47,693
Jun 200921313,10866.163.90$65,148
May 20093914,29054.743.93$58,234
Apr 200920514,19846.773.59$60,523
Mar 20092614,11042.144.06$58,368
Feb 200921212,89032.814.63$66,675
Jan 200919914,26735.865.37$83,764
Dec 20084215,36337.105.98$93,385
Nov 200820315,76655.496.86$119,425
Oct 20081917,93175.246.92$125,548
Sep 200821418,660101.767.88$168,763
Aug 200818920,661114.228.48$196,855
Jul 20083422,601131.0811.39$261,869
Jun 200821826,693131.3313.03$376,510
May 200821531,200123.1711.57$387,599
Apr 200842537,190110.3110.45$435,698
Mar 200819854,036101.909.66$542,384
Feb 200830383,07992.538.77$756,688

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,015 Mcf  × $  3.05 =     $3,092

────────────────────────────────────────────────────
Month total                                   $3,092

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/242282 is the state's own key, not one this site invented.