SHELL FEE 57

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 243184District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.5 M
Jan 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-07-23193279
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,128 bbl$228,529
GasProduction445,730 Mcf$2,252,307
Total$2,480,836

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.8049, -100.2036. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.80493, -100.20363 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,105 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,105 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-21133990513,105 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 202301974.852.64$50
Jun 2023024568.962.26$553
May 2023017570.622.23$390
Apr 2023035378.122.24$790
Mar 2023065172.852.39$1,558
Feb 2023095275.112.47$2,347
Jan 202301,06576.533.39$3,608
Dec 202201,07076.415.73$6,130
Nov 202201,04685.005.65$5,906
Oct 202201,16187.185.86$6,808
Sep 202201,03184.888.16$8,417
Aug 202201,10094.529.13$10,040
Jul 202201,253101.587.54$9,450
Jun 20221231,199115.097.98$23,721
May 202201,263109.378.43$10,651
Apr 202201,230104.226.84$8,410
Mar 202201,023108.885.08$5,193
Feb 202201,07091.054.86$5,199
Jan 202201,23081.844.54$5,581
Dec 202101,23971.323.90$4,831
Nov 202101,24577.435.24$6,520
Oct 2021094479.795.71$5,394
Sep 202101,22769.865.35$6,566
Aug 202101,14866.024.22$4,845
Jul 2021084570.783.98$3,365
Jun 202101,26169.493.38$4,263
May 202101,18063.483.02$3,561
Apr 202101,27260.362.76$3,509
Mar 2021551,47661.302.72$7,382
Feb 2021095857.805.55$5,315
Jan 202101,42750.412.81$4,010
Dec 202001,50944.642.68$4,037
Nov 2020099238.772.71$2,685
Oct 202001,14236.972.48$2,830
Sep 202010999137.091.99$6,016
Aug 202001,39139.982.39$3,318
Jul 202001,46238.371.83$2,668
Jun 202001,42134.901.69$2,402
May 202001,47316.921.81$2,673
Apr 2020821,41714.751.80$3,766
Mar 202001,50730.341.86$2,797
Feb 202001,41649.881.98$2,805
Jan 202001,54957.252.09$3,245
Dec 201901,59459.012.30$3,673
Nov 201901,46555.302.75$4,030
Oct 201901,40253.472.42$3,391
Sep 201901,32355.052.66$3,516
Aug 201901,40153.112.30$3,228
Jul 201901,33456.272.46$3,282
Jun 20191921,32552.782.49$13,435
May 201901,44458.482.74$3,957
Apr 201901,30962.632.75$3,601
Mar 201901,32956.803.06$4,070
Feb 201911,19450.852.79$3,385
Jan 201901,32246.033.23$4,268
Dec 201801,37746.594.19$5,763
Nov 201801,34152.934.24$5,682
Oct 201801,34961.443.40$4,584
Sep 201801,29759.543.11$4,031
Aug 201801,35159.403.07$4,143
Jul 201801,41165.142.93$4,137
Jun 201801,39460.183.08$4,289
May 201801,28365.382.90$3,722
Apr 20181941,45063.842.90$16,591
Mar 201801,45761.222.79$4,060
Feb 201801,22061.782.77$3,375
Jan 201811,60062.874.01$6,478
Dec 201701,39857.272.92$4,084
Nov 201701,43555.423.12$4,475
Oct 201701,52649.292.98$4,553
Sep 201701,49647.523.09$4,619
Aug 201701,57445.373.00$4,729
Jul 201701,48243.873.09$4,575
Jun 201701,43942.493.09$4,443
May 201701,55445.373.26$5,071
Apr 201701,42347.933.21$4,570
Mar 201701,51246.772.98$4,511
Feb 20171821,41050.452.95$13,345
Jan 201701,48049.413.42$5,060
Dec 201601,61748.763.72$6,020
Nov 201601,55242.492.64$4,104
Oct 201601,66546.193.09$5,145
Sep 201601,61641.553.10$5,011
Aug 201601,65641.442.92$4,843
Jul 201601,72641.622.92$5,047
Jun 201601,72945.352.69$4,644
May 201601,79242.521.99$3,568
Apr 201601,75836.561.99$3,500
Mar 201621,76033.011.79$3,223
Feb 201601,50726.472.06$3,110
Jan 201601,68627.352.36$3,986
Dec 201511,79132.362.00$3,617
Nov 201511,69638.792.17$3,715
Oct 201501,75843.552.43$4,266
Sep 201501,33942.992.76$3,694
Aug 201501,62540.162.87$4,668
Jul 201501,45848.152.95$4,294
Jun 201501,25156.152.88$3,606
May 201501,69655.212.96$5,012
Apr 201501,74649.822.71$4,726
Mar 201511,88642.892.93$5,578
Feb 201511,22944.662.98$3,702
Jan 201501,43043.433.10$4,434
Dec 201401,70754.693.59$6,130
Nov 201401,66970.464.25$7,096
Oct 201401,68678.303.90$6,577
Sep 201421,66286.164.05$6,896
Aug 201401,65389.394.04$6,670
Jul 201401,72096.564.18$7,189
Jun 201411,68298.164.74$8,066
May 201401,69194.734.73$7,993
Apr 201401,68895.944.81$8,118
Mar 201401,75795.895.06$8,885
Feb 201401,37397.406.19$8,502
Jan 201401,83590.404.86$8,919
Dec 201301,76491.824.35$7,681
Nov 201301,56688.853.74$5,854
Oct 2013581,80997.423.78$12,487
Sep 201301,684104.113.72$6,261
Aug 201301,629104.253.52$5,738
Jul 201301,692102.523.72$6,290
Jun 20131541,66394.403.93$21,079
May 201301,67994.834.15$6,966
Apr 201301,99293.964.28$8,531
Mar 201312,15193.623.91$8,510
Feb 201301,79591.233.42$6,139
Jan 201302,31691.603.42$7,921
Dec 201212,25486.773.42$7,796
Nov 201202,06886.953.62$7,496
Oct 201212,21289.383.40$7,609
Sep 201202,24594.672.92$6,552
Aug 201202,07792.662.91$6,040
Jul 20122082,18085.133.02$24,292
Jun 201202,46879.822.52$6,217
May 201212,01391.612.49$5,101
Apr 201202,181101.652.00$4,355
Mar 2012314,453105.052.22$13,151
Feb 201233,842101.102.57$10,178
Jan 201232,54598.092.73$7,253
Dec 201102,07196.873.24$6,710
Nov 201112,56695.723.31$8,592
Oct 201112,61184.983.65$9,611
Sep 201122,60383.623.99$10,542
Aug 2011932,95983.404.15$20,034
Jul 201112,84594.144.52$12,946
Jun 201112,72092.904.64$12,713
May 201122,70798.134.40$12,120
Apr 201101,898105.964.33$8,225
Mar 201101,26396.364.06$5,124
Feb 201102,05885.644.18$8,602
Jan 201112,45386.504.59$11,343
Dec 20102032,66885.734.35$29,003
Nov 201013,14480.843.80$12,013
Oct 201013,05778.103.51$10,805
Sep 201013,08872.633.98$12,361
Aug 201023,30473.684.42$14,749
Jul 201023,64972.554.74$17,429
Jun 201053,60070.364.91$18,029
May 201043,91171.124.24$16,848
Apr 20102003,57481.694.12$31,072
Mar 201033,62578.394.39$16,144
Feb 201003,44573.585.44$18,749
Jan 201023,91874.365.96$23,516
Dec 200904,02571.445.48$22,072
Nov 200934,26174.593.75$16,209
Oct 200914,48772.544.11$18,515
Sep 20092004,55665.543.06$27,071
Aug 200915,00267.423.22$16,166
Jul 200965,13761.133.46$18,164
Jun 200915,22766.163.90$20,425
May 20091965,56554.743.93$32,576
Apr 200935,60846.773.59$20,259
Mar 200925,66742.144.06$23,087
Feb 200915,61932.814.63$26,066
Jan 200917,12935.865.37$38,326
Dec 20083856,95837.105.98$55,872
Nov 200806,84955.496.86$46,987
Oct 200808,50875.246.92$58,892
Sep 2008010,002101.767.88$78,787
Aug 20081965,385114.228.48$68,068
Jul 200809,475131.0811.39$107,915
Jun 200819711,358131.3313.03$173,897
May 2008012,679123.1711.57$146,750
Apr 2008011,475110.3110.45$119,970
Mar 200809,058101.909.66$87,537
Feb 2008012,26492.538.77$107,562
Jan 20080090.388.21$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 74.85 =         $0
Gas                   19 Mcf  × $  2.64 =        $50

────────────────────────────────────────────────────
Month total                                      $50

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/243184 is the state's own key, not one this site invented.