RAMP 30

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 246121District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.3 M
Aug 2008 – May 2026
Value, last 12 filed months
$55 k
at the published price for each month
Months reported
214
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-04-16190054
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition9,738 bbl$656,615
GasProduction598,459 Mcf$2,618,214
Total$3,274,828

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7344, -100.1996. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.73436, -100.19962 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,201 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,201 ft.

Completions filed
Oct 2008
1 of 1 wells

1 well

42-21134269813,201 ftOct 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (214)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

214 months

May 202601,089106.413.05$3,317
Apr 202601,02298.932.87$2,933
Mar 202601,12189.753.15$3,531
Feb 2026097363.503.75$3,649
Jan 202601,13659.138.00$9,086
Dec 202501,14656.664.41$5,058
Nov 2025097958.593.93$3,844
Oct 20255399859.383.30$6,445
Sep 2025090362.743.08$2,778
Aug 202501,07863.933.01$3,250
Jul 2025093966.743.32$3,113
Jun 20257289766.483.13$7,593
May 202501,13060.553.23$3,653
Apr 2025090262.363.54$3,196
Mar 202501,05667.704.27$4,507
Feb 202501,26070.884.34$5,469
Jan 202501,24474.324.28$5,323
Dec 202401,19468.993.12$3,727
Nov 202401,09669.052.20$2,409
Oct 20247269871.372.28$6,731
Sep 2024072869.612.36$1,721
Aug 2024079975.632.06$1,649
Jul 202401,10379.932.15$2,368
Jun 202401,28578.082.63$3,385
May 2024681,21778.812.20$8,035
Apr 2024096384.451.66$1,598
Mar 2024015180.301.55$233
Feb 202401,00076.091.78$1,784
Jan 202401,08073.023.30$3,561
Dec 2023511,11371.262.61$6,540
Nov 2023098377.892.81$2,760
Oct 202301,07385.443.09$3,313
Sep 2023098789.042.74$2,699
Aug 202301,07580.522.67$2,873
Jul 20231121,08774.852.64$11,255
Jun 202301,12368.962.26$2,536
May 202301,12670.622.23$2,508
Apr 202301,10378.122.24$2,468
Mar 202301,12472.852.39$2,690
Feb 202301,21575.112.47$2,996
Jan 202301,36476.533.39$4,621
Dec 20221211,21776.415.73$16,218
Nov 202201,31785.005.65$7,436
Oct 202201,36987.185.86$8,027
Sep 202201,33884.888.16$10,923
Aug 202201,42294.529.13$12,979
Jul 202201,528101.587.54$11,524
Jun 202201,381115.097.98$11,017
May 202201,355109.378.43$11,427
Apr 2022961,517104.226.84$20,378
Mar 202201,423108.885.08$7,224
Feb 202201,33591.054.86$6,487
Jan 20221011,52181.844.54$15,168
Dec 202101,51671.323.90$5,911
Nov 202101,48177.435.24$7,756
Oct 202101,42679.795.71$8,148
Sep 202101,36669.865.35$7,309
Aug 202101,38666.024.22$5,850
Jul 202101,37770.783.98$5,483
Jun 202101,49169.493.38$5,041
May 20211611,76763.483.02$15,553
Apr 202101,69660.362.76$4,678
Mar 202101,37361.302.72$3,730
Feb 202101,26257.805.55$7,002
Jan 202101,54550.412.81$4,342
Dec 202001,41544.642.68$3,786
Nov 202001,73738.772.71$4,701
Oct 20201901,74036.972.48$11,337
Sep 202001,46137.091.99$2,909
Aug 202001,60439.982.39$3,826
Jul 202001,61538.371.83$2,948
Jun 202001,54134.901.69$2,605
May 202001,62316.921.81$2,945
Apr 202001,54614.751.80$2,790
Mar 202001,61930.341.86$3,005
Feb 20201261,51749.881.98$9,290
Jan 202001,60257.252.09$3,356
Dec 201901,61859.012.30$3,728
Nov 201901,58055.302.75$4,346
Oct 201901,59853.472.42$3,865
Sep 2019721,53255.052.66$8,035
Aug 201901,58553.112.30$3,652
Jul 201901,69856.272.46$4,177
Jun 2019841,67952.782.49$8,616
May 201901,68158.482.74$4,606
Apr 201901,62662.632.75$4,473
Mar 201911,69556.803.06$5,247
Feb 2019801,52350.852.79$8,321
Jan 201901,71746.033.23$5,543
Dec 201801,82946.594.19$7,655
Nov 20181911,71852.934.24$17,389
Oct 201801,78661.443.40$6,069
Sep 201801,71659.543.11$5,333
Aug 201801,80459.403.07$5,532
Jul 201801,75665.142.93$5,148
Jun 201801,71260.183.08$5,268
May 201801,91165.382.90$5,543
Apr 201801,77063.842.90$5,134
Mar 20181941,89961.222.79$17,169
Feb 201801,73961.782.77$4,810
Jan 201811,90162.874.01$7,685
Dec 201701,87957.272.92$5,490
Nov 201701,93555.423.12$6,034
Oct 201702,00749.292.98$5,988
Sep 2017982,08147.523.09$11,082
Aug 201702,11845.373.00$6,363
Jul 201702,36843.873.09$7,311
Jun 201702,38342.493.09$7,357
May 20171061,82945.373.26$10,778
Apr 201701,55547.933.21$4,994
Mar 201702,17046.772.98$6,475
Feb 20171952,24550.452.95$16,466
Jan 201702,30249.413.42$7,870
Dec 201602,91048.763.72$10,833
Nov 201601,51942.492.64$4,017
Oct 20161941,33346.193.09$13,080
Sep 201601,55641.553.10$4,825
Aug 201603,13941.442.92$9,180
Jul 201603,22441.622.92$9,428
Jun 201602,27145.352.69$6,100
May 20161942,30942.521.99$12,846
Apr 201601,48836.561.99$2,963
Mar 201601,39233.011.79$2,497
Feb 201601,09326.472.06$2,256
Jan 201601,52127.352.36$3,596
Dec 201501,65532.362.00$3,312
Nov 201501,62138.792.17$3,513
Oct 201501,78543.552.43$4,331
Sep 201502,09642.992.76$5,782
Aug 201502,28040.162.87$6,549
Jul 201502,21548.152.95$6,523
Jun 201502,25356.152.88$6,495
May 201502,31655.212.96$6,845
Apr 20151752,45849.822.71$15,371
Mar 201502,48242.892.93$7,284
Feb 201502,32044.662.98$6,905
Jan 20151922,50343.433.10$16,099
Dec 201402,88754.693.59$10,368
Nov 201402,80670.464.25$11,931
Oct 201402,41478.303.90$9,417
Sep 20141922,52286.164.05$26,745
Aug 201401,48489.394.04$5,988
Jul 201401,51196.564.18$6,315
Jun 201401,43398.164.74$6,788
May 201401,57094.734.73$7,421
Apr 201401,53595.944.81$7,382
Mar 201401,61195.895.06$8,147
Feb 201401,43797.406.19$8,898
Jan 201401,73690.404.86$8,438
Dec 201301,76091.824.35$7,664
Nov 201301,81688.853.74$6,789
Oct 20131271,97297.423.78$19,825
Sep 201302,015104.113.72$7,491
Aug 201302,391104.253.52$8,423
Jul 201302,395102.523.72$8,904
Jun 20131862,36494.403.93$26,857
May 201302,32994.834.15$9,663
Apr 201302,50893.964.28$10,741
Mar 201302,73793.623.91$10,710
Feb 201322,73591.233.42$9,536
Jan 20131873,09891.603.42$27,724
Dec 201232,85086.773.42$10,008
Nov 201253,24386.953.62$12,191
Oct 20122143,37589.383.40$30,601
Sep 201222,40894.672.92$7,217
Aug 201202,55492.662.91$7,427
Jul 201202,72185.133.02$8,220
Jun 201202,86379.822.52$7,212
May 20121943,60891.612.49$26,750
Apr 201253,549101.652.00$7,595
Mar 201242,540105.052.22$6,064
Feb 201212,890101.102.57$7,529
Jan 20122053,39398.092.73$29,385
Dec 201113,23896.873.24$10,587
Nov 201123,11895.723.31$10,516
Oct 20111884,26084.983.65$31,519
Sep 201122,68183.623.99$10,853
Aug 20111983,76183.404.15$32,119
Jul 201163,73494.144.52$17,432
Jun 201123,35192.904.64$15,734
May 20112023,87098.134.40$36,869
Apr 201102,773105.964.33$12,016
Mar 201123,09696.364.06$12,754
Feb 201122,81985.644.18$11,955
Jan 201113,74686.504.59$17,276
Dec 20102024,03085.734.35$34,839
Nov 201064,36980.843.80$17,067
Oct 2010114,87278.103.51$17,954
Sep 20102014,22172.633.98$31,396
Aug 201024,24773.684.42$18,916
Jul 201014,56672.554.74$21,699
Jun 20102044,13770.364.91$34,668
May 201034,65171.124.24$19,911
Apr 201054,73981.694.12$19,946
Mar 20102033,51878.394.39$31,353
Feb 201065,24573.585.44$28,987
Jan 20101946,19974.365.96$51,397
Dec 2009116,41271.445.48$35,948
Nov 20092146,69174.593.75$41,064
Oct 20092007,16872.544.11$43,970
Sep 20092027,10765.543.06$35,020
Aug 2009107,38767.423.22$24,449
Jul 20093877,47661.133.46$49,558
Jun 2009148,23066.163.90$32,982
May 200949,28654.743.93$36,673
Apr 20093789,26646.773.59$50,921
Mar 20091908,86942.144.06$44,006
Feb 20091969,08632.814.63$48,526
Jan 200919411,71535.865.37$69,878
Dec 200858912,66237.105.98$97,534
Nov 200819214,47955.496.86$109,985
Oct 200840817,74475.246.92$153,522
Sep 200857821,984101.767.88$231,987
Aug 2008038,923114.228.48$330,185

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,089 Mcf  × $  3.05 =     $3,317

────────────────────────────────────────────────────
Month total                                   $3,317

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/246121 is the state's own key, not one this site invented.