TEAS 43

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 251208District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.3 M
Aug 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-10-15174421
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,304 bbl$165,474
GasProduction393,958 Mcf$2,122,703
Total$2,288,177

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6724, -100.2922. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67237, -100.29225 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,900 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-211336124324P11,900 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018038446.594.19$1,607
Nov 2018037252.934.24$1,576
Oct 2018038461.443.40$1,305
Sep 20183937259.543.11$3,478
Aug 2018038459.403.07$1,178
Jul 2018038465.142.93$1,126
Jun 2018037260.183.08$1,145
May 2018038465.382.90$1,114
Apr 2018037263.842.90$1,079
Mar 2018038461.222.79$1,070
Feb 2018034761.782.77$960
Jan 201801,50562.874.01$6,034
Dec 201701,54757.272.92$4,520
Nov 201701,50355.423.12$4,687
Oct 201701,49149.292.98$4,449
Sep 201701,54047.523.09$4,754
Aug 201701,61445.373.00$4,849
Jul 201701,89443.873.09$5,847
Jun 201701,86042.493.09$5,742
May 201701,78745.373.26$5,832
Apr 201701,64547.933.21$5,283
Mar 201701,75846.772.98$5,245
Feb 201701,50450.452.95$4,441
Jan 201701,78549.413.42$6,103
Dec 201601,74948.763.72$6,511
Nov 201601,45242.492.64$3,840
Oct 201601,55446.193.09$4,802
Sep 20160041.553.10$0
Aug 201601,81641.442.92$5,311
Jul 201601,53641.622.92$4,492
Jun 201601,63945.352.69$4,402
May 201601,72142.521.99$3,427
Apr 201601,61636.561.99$3,218
Mar 201601,64233.011.79$2,946
Feb 20161211,66226.472.06$6,633
Jan 201601,60627.352.36$3,797
Dec 201501,58032.362.00$3,162
Nov 201501,66138.792.17$3,600
Oct 201501,79043.552.43$4,344
Sep 201501,71942.992.76$4,742
Aug 201501,72840.162.87$4,964
Jul 201501,80548.152.95$5,316
Jun 201501,71456.152.88$4,941
May 201501,77355.212.96$5,240
Apr 201501,72649.822.71$4,672
Mar 201501,78642.892.93$5,241
Feb 201501,62744.662.98$4,842
Jan 201501,43343.433.10$4,443
Dec 201401,66354.693.59$5,972
Nov 201401,59170.464.25$6,765
Oct 201401,66078.303.90$6,476
Sep 201401,66986.164.05$6,752
Aug 20141521,70589.394.04$20,467
Jul 201401,80896.564.18$7,557
Jun 201401,72398.164.74$8,162
May 201401,82694.734.73$8,631
Apr 201401,76995.944.81$8,507
Mar 201401,80295.895.06$9,112
Feb 201401,65497.406.19$10,242
Jan 201401,86090.404.86$9,041
Dec 201301,82291.824.35$7,934
Nov 201301,81988.853.74$6,800
Oct 201301,91097.423.78$7,219
Sep 201301,754104.113.72$6,521
Aug 201311,939104.253.52$6,935
Jul 201301,921102.523.72$7,142
Jun 201301,77994.403.93$6,998
May 201321,79794.834.15$7,646
Apr 201331,67293.964.28$7,442
Mar 20131881,65393.623.91$24,069
Feb 201301,35991.233.42$4,648
Jan 201301,40391.603.42$4,798
Dec 201201,28286.773.42$4,385
Nov 201201,78186.953.62$6,456
Oct 201201,91089.383.40$6,493
Sep 201201,32494.672.92$3,864
Aug 201241,72192.662.91$5,376
Jul 201201,68285.133.02$5,081
Jun 201221,65779.822.52$4,334
May 201221,73991.612.49$4,510
Apr 201201,694101.652.00$3,383
Mar 201201,697105.052.22$3,771
Feb 201201,690101.102.57$4,344
Jan 201201,91698.092.73$5,239
Dec 201101,93396.873.24$6,262
Nov 201101,83995.723.31$6,089
Oct 201102,02084.983.65$7,370
Sep 201101,92283.623.99$7,661
Aug 201102,00883.404.15$8,332
Jul 201102,04594.144.52$9,238
Jun 201101,99992.904.64$9,275
May 201102,05398.134.40$9,043
Apr 201101,978105.964.33$8,571
Mar 201101,76996.364.06$7,177
Feb 20111611,71985.644.18$20,973
Jan 201102,14386.504.59$9,834
Dec 201001,99785.734.35$8,682
Nov 201002,23780.843.80$8,490
Oct 201002,15478.103.51$7,558
Sep 201002,18772.633.98$8,703
Aug 201002,21473.684.42$9,784
Jul 201002,15772.554.74$10,217
Jun 201002,17170.364.91$10,660
May 201002,38571.124.24$10,101
Apr 20101672,24681.694.12$22,902
Mar 201002,35578.394.39$10,335
Feb 201002,14073.585.44$11,647
Jan 201002,41274.365.96$14,385
Dec 200902,60671.445.48$14,291
Nov 200902,43774.593.75$9,142
Oct 200902,61772.544.11$10,757
Sep 200902,55465.543.06$7,827
Aug 200902,81267.423.22$9,050
Jul 200902,88761.133.46$10,002
Jun 200902,73466.163.90$10,649
May 200902,95554.743.93$11,601
Apr 200902,96446.773.59$10,633
Mar 200902,93642.144.06$11,917
Feb 20091722,75832.814.63$18,421
Jan 200903,10835.865.37$16,693
Dec 200803,05637.105.98$18,266
Nov 200803,22855.496.86$22,145
Oct 200804,60775.246.92$31,890
Sep 200804,228101.767.88$33,304
Aug 20081823,601114.228.48$51,335
Jul 200803,600131.0811.39$41,002
Jun 200803,419131.3313.03$44,559
May 200803,757123.1711.57$43,485
Apr 200803,611110.3110.45$37,753
Mar 200803,929101.909.66$37,970
Feb 200803,77092.538.77$33,065
Jan 20081823,90990.388.21$48,525
Dec 200704,30388.337.30$31,420
Nov 200704,39491.677.29$32,040
Oct 200704,81482.856.92$33,322
Sep 200704,86775.846.24$30,390
Aug 20071735,20469.066.39$45,190
Jul 20071855,37570.906.39$47,452
Jun 200705,45562.007.55$41,177
May 200705,94658.747.85$46,654
Apr 200706,13059.617.81$47,846
Mar 200706,86456.927.30$50,121
Feb 20071776,57555.108.22$63,773
Jan 200708,11750.306.73$54,602
Dec 200609,17456.656.92$63,470
Nov 200619510,25954.207.62$88,717
Oct 2006013,67654.906.01$82,245
Sep 200619620,76560.085.04$116,373
Aug 2006018,31668.717.34$134,438

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 46.59 =         $0
Gas                  384 Mcf  × $  4.19 =     $1,607

────────────────────────────────────────────────────
Month total                                   $1,607

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/251208 is the state's own key, not one this site invented.