Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the STILES RANCH (GRANITE WASH CONS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 253939District 10Field 861252502 tax incentive programmesCondensateGasSaveExport
Value, all time
$7.3 M
Dec 2008 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
210
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 906 leases and 906 wells, and the rule below applies to all of them.

Discovered
2008-06-24
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-10-11.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-02-09196737
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition26,745 bbl$1,592,578
GasProduction1,413,790 Mcf$5,678,041
Total$7,270,618

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5551, -100.1025. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.55507, -100.10247 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
15,010 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,010 ft.

Completions filed
Dec 2008
1 of 1 wells

1 well

42-483327631715,010 ftDec 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (210)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

210 months

May 2026036106.413.05$110
Apr 202604798.932.87$135
Mar 202607389.753.15$230
Feb 20260963.503.75$34
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 2025031759.383.30$1,048
Sep 20250862.743.08$25
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 2025027460.553.23$886
Apr 202507162.363.54$252
Mar 202507567.704.27$320
Feb 202507470.884.34$321
Jan 202506574.324.28$278
Dec 202402268.993.12$69
Nov 202405669.052.20$123
Oct 202402271.372.28$50
Sep 202402169.612.36$50
Aug 202407475.632.06$153
Jul 202401,10279.932.15$2,366
Jun 2024034178.082.63$898
May 2024671,77978.812.20$9,191
Apr 202402,34684.451.66$3,892
Mar 202401,97380.301.55$3,049
Feb 2024096476.091.78$1,719
Jan 202402,00873.023.30$6,622
Dec 202302,40671.262.61$6,281
Nov 202302,06477.892.81$5,795
Oct 202302,52785.443.09$7,802
Sep 202302,22489.042.74$6,083
Aug 202302,28380.522.67$6,102
Jul 20231672,14774.852.64$18,172
Jun 202302,11868.962.26$4,783
May 202302,40370.622.23$5,352
Apr 202301,96278.122.24$4,390
Mar 202301,92872.852.39$4,614
Feb 20232181,81175.112.47$20,839
Jan 202302,41976.533.39$8,195
Dec 202202,89276.415.73$16,569
Nov 202201,58085.005.65$8,921
Oct 202202,12187.185.86$12,437
Sep 202202,01784.888.16$16,466
Aug 202202,10094.529.13$19,167
Jul 202202,006101.587.54$15,129
Jun 202202,228115.097.98$17,773
May 202202,026109.378.43$17,085
Apr 202202,255104.226.84$15,419
Mar 202201,292108.885.08$6,559
Feb 2022941,47291.054.86$15,711
Jan 202201,71581.844.54$7,782
Dec 202101,75471.323.90$6,839
Nov 202101,61877.435.24$8,473
Oct 2021622,10279.795.71$16,958
Sep 2021892,08369.865.35$17,364
Aug 202102,10866.024.22$8,897
Jul 202102,13170.783.98$8,486
Jun 202102,03369.493.38$6,873
May 20211902,10363.483.02$18,407
Apr 202102,15560.362.76$5,944
Mar 202102,69761.302.72$7,328
Feb 2021083457.805.55$4,627
Jan 202102,17050.412.81$6,098
Dec 202002,20944.642.68$5,910
Nov 202002,17038.772.71$5,873
Oct 2020542,13336.972.48$7,283
Sep 202001,98437.091.99$3,950
Aug 20201722,26739.982.39$12,284
Jul 20201832,35338.371.83$11,316
Jun 202002,15834.901.69$3,648
May 202002,53316.921.81$4,597
Apr 202002,33614.751.80$4,215
Mar 202002,12230.341.86$3,939
Feb 20201852,17449.881.98$13,534
Jan 202002,18257.252.09$4,571
Dec 201902,26059.012.30$5,208
Nov 201902,42955.302.75$6,681
Oct 201902,59953.472.42$6,286
Sep 201902,51155.052.66$6,672
Aug 201902,54253.112.30$5,858
Jul 20191832,30356.272.46$15,963
Jun 201902,18552.782.49$5,443
May 201902,79158.482.74$7,648
Apr 201902,22562.632.75$6,120
Mar 20191992,30056.803.06$18,346
Feb 201902,00850.852.79$5,607
Jan 20191972,51446.033.23$17,184
Dec 201802,62046.594.19$10,966
Nov 201802,47852.934.24$10,500
Oct 201812,66061.443.40$9,100
Sep 20181872,62559.543.11$19,292
Aug 201802,32959.403.07$7,142
Jul 201812,78165.142.93$8,219
Jun 201802,28560.183.08$7,031
May 201802,51865.382.90$7,304
Apr 20181942,56263.842.90$19,817
Mar 201803,07361.222.79$8,564
Feb 20182042,93261.782.77$20,713
Jan 201843,14062.874.01$12,841
Dec 201703,29657.272.92$9,629
Nov 20171963,14055.423.12$20,654
Oct 201712,77249.292.98$8,320
Sep 201722,94147.523.09$9,175
Aug 20171923,33445.373.00$18,728
Jul 201703,27843.873.09$10,120
Jun 201703,20042.493.09$9,879
May 20172003,54045.373.26$20,626
Apr 201703,22447.933.21$10,354
Mar 201703,39946.772.98$10,142
Feb 20171973,23250.452.95$19,481
Jan 201703,46949.413.42$11,860
Dec 20161983,42548.763.72$22,405
Nov 201603,52342.492.64$9,316
Oct 201603,26946.193.09$10,102
Sep 20161763,27341.553.10$17,461
Aug 201603,36641.442.92$9,843
Jul 201603,35941.622.92$9,823
Jun 201603,25845.352.69$8,750
May 20161793,67442.521.99$14,926
Apr 201602,89136.561.99$5,756
Mar 201603,37933.011.79$6,062
Feb 201602,76126.472.06$5,698
Jan 201601,59127.352.36$3,762
Dec 201501,81132.362.00$3,625
Nov 20151851,75038.792.17$10,969
Oct 201503,55943.552.43$8,636
Sep 201504,98542.992.76$13,751
Aug 201504,88640.162.87$14,035
Jul 201503,82348.152.95$11,259
Jun 20151823,69556.152.88$20,871
May 201504,15255.212.96$12,271
Apr 201504,00549.822.71$10,840
Mar 20151844,00442.892.93$19,642
Feb 201503,60244.662.98$10,720
Jan 201503,86443.433.10$11,981
Dec 201404,75254.693.59$17,066
Nov 20141805,20170.464.25$34,797
Oct 201404,65578.303.90$18,159
Sep 201403,98086.164.05$16,101
Aug 20141804,44689.394.04$34,030
Jul 20141984,36996.564.18$37,380
Jun 201404,53098.164.74$21,458
May 20143635,24294.734.73$59,164
Apr 201404,05995.944.81$19,520
Mar 20141844,74695.895.06$41,643
Feb 201403,77697.406.19$23,381
Jan 20142054,88290.404.86$42,262
Dec 201305,17491.824.35$22,530
Nov 201304,45688.853.74$16,658
Oct 20131465,62197.423.78$35,467
Sep 201305,596104.113.72$20,804
Aug 20131775,879104.253.52$39,162
Jul 20132246,994102.523.72$48,966
Jun 20131875,49094.403.93$39,247
May 201307,53894.834.15$31,276
Apr 201305,56593.964.28$23,833
Mar 20131455,84393.623.91$36,438
Feb 20131405,56791.233.42$31,811
Jan 20131785,77091.603.42$36,038
Dec 20121966,02786.773.42$37,620
Nov 201206,35886.953.62$23,048
Oct 20121126,34689.383.40$31,585
Sep 2012966,52594.672.92$28,131
Aug 201206,89492.662.91$20,049
Jul 20123797,14885.133.02$53,857
Jun 201207,41879.822.52$18,686
May 20121977,86691.612.49$37,620
Apr 201207,404101.652.00$14,784
Mar 20123857,881105.052.22$57,956
Feb 201207,420101.102.57$19,071
Jan 201208,00298.092.73$21,878
Dec 20111978,31896.873.24$46,032
Nov 20111887,86695.723.31$44,042
Oct 201109,16984.983.65$33,453
Sep 20111278,93883.623.99$46,245
Aug 20111889,14283.404.15$53,612
Jul 20111819,85994.144.52$61,575
Jun 201118810,09692.904.64$64,309
May 201118610,31998.134.40$63,706
Apr 201135810,423105.964.33$83,099
Mar 2011011,66396.364.06$47,321
Feb 201108,92685.644.18$37,311
Jan 201118412,43386.504.59$72,968
Dec 201018012,89185.734.35$71,478
Nov 201018711,52980.843.80$58,873
Oct 201018813,19278.103.51$60,972
Sep 201018513,85872.633.98$68,584
Aug 201018713,74773.684.42$74,531
Jul 201018415,40872.554.74$86,329
Jun 201036817,31870.364.91$110,931
May 2010013,14671.124.24$55,676
Apr 201017517,39481.694.12$86,006
Mar 201017318,78778.394.39$96,011
Feb 20107618,09173.585.44$104,050
Jan 201035019,51374.365.96$142,403
Dec 2009020,80671.445.48$114,095
Nov 200933523,34374.593.75$112,559
Oct 200942024,88272.544.11$132,738
Sep 200921726,56165.543.06$95,625
Aug 200962629,95167.423.22$138,602
Jul 200960933,31661.133.46$152,651
Jun 200993338,19866.163.90$210,508
May 200983842,83954.743.93$214,047
Apr 20091,24150,57346.773.59$239,472
Mar 20091,64365,48142.144.06$335,023
Feb 20092,18180,07032.814.63$442,523
Jan 20095,237157,19135.865.37$1,032,072
Dec 2008015,57137.105.98$93,070

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   36 Mcf  × $  3.05 =       $110

────────────────────────────────────────────────────
Month total                                     $110

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well