PRATER 33

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the HEMPHILL (GRANITE WASH.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 275056District 10Field 40311200CondensateGasSave
Value, all time
$33.6 M
Jun 2013 – May 2026
Value, last 12 filed months
$724 k
at the published price for each month
Months reported
156
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition109,471 bbl$7,090,322
GasProduction7,988,580 Mcf$26,477,106
Total$33,567,427

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6238, -100.2590. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62377, -100.25903 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,790 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,790 ft.

Completions filed
Jun 2013
1 of 1 wells

1 well

42-211351032SL11,790 ftJun 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (156)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

156 months

May 202600106.413.05$0
Apr 2026014,89798.932.87$42,750
Mar 202606,59589.753.15$20,771
Feb 202635814,60863.503.75$77,518
Jan 202619014,53159.138.00$127,452
Dec 2025015,71956.664.41$69,374
Nov 202537114,89258.593.93$80,209
Oct 2025015,11159.383.30$49,939
Sep 202519714,56562.743.08$57,175
Aug 202535116,26563.933.01$71,475
Jul 202517316,95466.743.32$67,752
Jun 202519314,90766.483.13$59,470
May 202537416,73860.553.23$76,748
Apr 2025015,96262.363.54$56,555
Mar 202518916,93767.704.27$85,088
Feb 202538815,63770.884.34$95,379
Jan 202517017,09474.324.28$85,774
Dec 202418116,93868.993.12$65,357
Nov 2024015,53469.052.20$34,151
Oct 202418115,75871.372.28$48,868
Sep 2024016,99169.612.36$40,173
Aug 202473717,17975.632.06$91,190
Jul 202417817,13179.932.15$51,001
Jun 202416917,38878.082.63$58,995
May 2024018,45778.812.20$40,577
Apr 2024017,92084.451.66$29,733
Mar 202454917,94380.301.55$71,809
Feb 2024017,05076.091.78$30,411
Jan 2024019,08673.023.30$62,939
Dec 20234621,46071.262.61$59,304
Nov 202339421,99377.892.81$92,435
Oct 202337722,07685.443.09$100,366
Sep 202324620,64789.042.74$78,374
Aug 20236622,36580.522.67$65,093
Jul 20234323,00774.852.64$63,998
Jun 202399520,74568.962.26$115,467
May 20236623,27070.622.23$56,493
Apr 202339022,64578.122.24$81,141
Mar 20234824,15272.852.39$61,296
Feb 202338717,59475.112.47$72,449
Jan 202346123,33576.533.39$114,333
Dec 202240023,32076.415.73$164,166
Nov 202220323,01385.005.65$147,191
Oct 202221824,53087.185.86$162,843
Sep 20222223,86684.888.16$196,702
Aug 202257722,75694.529.13$262,236
Jul 20222590101.587.54$26,309
Jun 202239122,902115.097.98$227,694
May 20225726,135109.378.43$226,632
Apr 202236925,748104.226.84$214,512
Mar 202242026,862108.885.08$182,092
Feb 202224224,94491.054.86$143,233
Jan 20221828,14781.844.54$129,195
Dec 202156529,25371.323.90$154,357
Nov 20213529,68377.435.24$158,155
Oct 202157231,28379.795.71$224,387
Sep 202118327,07469.865.35$157,655
Aug 202117828,41066.024.22$131,659
Jul 202119428,79670.783.98$128,399
Jun 202120028,79369.493.38$111,236
May 202121029,85563.483.02$103,423
Apr 202141130,35260.362.76$108,532
Mar 202124834,65761.302.72$109,363
Feb 202142329,28257.805.55$186,904
Jan 202157344,73750.412.81$154,608
Dec 202021436,16344.642.68$106,306
Nov 202041733,55138.772.71$106,975
Oct 202034134,91836.972.48$99,149
Sep 20203634,14037.091.99$69,309
Aug 202058035,91739.982.39$108,854
Jul 202055036,19138.371.83$87,156
Jun 202054235,19534.901.69$78,406
May 202021737,12816.921.81$71,050
Apr 202022136,34814.751.80$68,845
Mar 20201,30937,49430.341.86$109,313
Feb 202019835,82749.881.98$80,838
Jan 202090835,18157.252.09$125,678
Dec 201956839,15759.012.30$123,750
Nov 201918637,10455.302.75$112,348
Oct 201935739,99753.472.42$115,823
Sep 201988039,52755.052.66$153,478
Aug 201938641,48653.112.30$116,099
Jul 201949842,67156.272.46$132,996
Jun 201956737,98652.782.49$124,557
May 201942441,51958.482.74$138,571
Apr 201938441,02662.632.75$136,900
Mar 201947238,92456.803.06$145,999
Feb 201936437,67250.852.79$123,698
Jan 201974743,47246.033.23$174,720
Dec 201838744,81746.594.19$205,609
Nov 201858044,73452.934.24$220,248
Oct 201844847,29261.443.40$188,227
Sep 201850946,46559.543.11$174,719
Aug 201855050,00959.403.07$186,026
Jul 201859350,58665.142.93$186,940
Jun 201837348,95860.183.08$173,087
May 201873850,29865.382.90$194,155
Apr 201855651,15963.842.90$183,897
Mar 201843653,51861.222.79$175,838
Feb 201856348,07761.782.77$167,769
Jan 201837353,94162.874.01$239,717
Dec 201775854,41257.272.92$202,376
Nov 201738955,79455.423.12$195,544
Oct 201774458,73649.292.98$211,921
Sep 201791960,57247.523.09$230,674
Aug 201756662,70145.373.00$214,058
Jul 201791963,84243.873.09$237,415
Jun 201756163,21842.493.09$219,009
May 201755465,69445.373.26$239,521
Apr 201779565,97447.933.21$249,986
Mar 20171,35269,92746.772.98$271,873
Feb 201777065,34950.452.95$231,796
Jan 201777875,28349.413.42$295,819
Dec 20161,542164,72348.763.72$688,424
Nov 201691477,79342.492.64$244,548
Oct 201657083,79246.193.09$285,267
Sep 20161,12384,36741.553.10$308,252
Aug 201698990,16441.442.92$304,654
Jul 201677790,21541.622.92$296,158
Jun 20161,46094,76545.352.69$320,734
May 2016362106,30542.521.99$227,050
Apr 20161,66393,10336.561.99$246,171
Mar 2016757135,15433.011.79$267,456
Feb 201691298,47326.472.06$227,352
Jan 20161,68160,00127.352.36$187,839
Dec 201575766,92132.362.00$158,433
Nov 20151,66970,93138.792.17$218,471
Oct 20151,28767,62543.552.43$220,146
Sep 201556483,62442.992.76$254,916
Aug 20151,46082,32740.162.87$295,117
Jul 20151,25090,38248.152.95$326,370
Jun 20151,46393,97156.152.88$353,053
May 20153,121101,91955.212.96$473,527
Apr 20151,316103,69449.822.71$346,218
Mar 20151,798121,96942.892.93$435,060
Feb 20151,666148,55544.662.98$516,531
Jan 20152,519144,61143.433.10$557,785
Dec 20143,097148,98254.693.59$704,423
Nov 20141,773174,08770.464.25$865,116
Oct 20142,559176,00478.303.90$886,954
Sep 20143,960152,35586.164.05$957,537
Aug 201458178,77889.394.04$369,814
Jul 201478351,43596.564.18$290,584
Jun 201478055,87598.164.74$341,238
May 20141,16558,48094.734.73$386,770
Apr 201499260,56395.944.81$386,427
Mar 20142,14267,12095.895.06$544,809
Feb 201441562,44797.406.19$427,093
Jan 20142,39077,61190.404.86$593,301
Dec 201398990,07091.824.35$483,018
Nov 20132,17698,25788.853.74$560,650
Oct 20132,279116,25797.423.78$661,397
Sep 20132,313126,579104.113.72$711,394
Aug 20133,196172,404104.253.52$940,495
Jul 20133,668199,791102.523.72$1,118,814
Jun 201358049,67794.403.93$250,152

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas               14,897 Mcf  × $  2.87 =    $42,750

────────────────────────────────────────────────────
Month total                                  $42,750

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/275056 is the state's own key, not one this site invented.