BOWERS -B-

Operated by PHILLIPS PETROLEUM COMPANY (P-5 663680) in the WASHITA CREEK (MORROW 15225) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 37714District 10Field 95355500GasSave
Value, all time
$1.7 M
Jan 1993 – Sep 2002
Value, last 12 filed months
$0
at the published price for each month
Months reported
117
no gaps in the span
Streams
1
gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction1,390,917 Mcf$1,748,122
Total$1,748,122

789,514 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6976, -100.1011. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.69762, -100.10108 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
15,575 ft
1 wells filed one
Completion to plug
37.3 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,575 ft.

Completions filed
Jun 1965
1 of 1 wells
Plug dates filed
Sep 2002
1 of 1 wells

Last completion to plug: a median of 37.3 years across the 1 well that filed both dates, with the middle half between 37.3 years and 37.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-21100077115,575 ftJun 1965Sep 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (117)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

117 months

Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0
May 2002024.663.58$0
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 20015,48927.478.40$46,101
Dec 200010,51326.889.12$95,905
Nov 200010,68332.215.66$60,444
Oct 200014,09631.235.15$72,531
Sep 200013,88431.875.19$72,009
Aug 200013,66629.644.54$62,054
Jul 200015,93928.534.09$65,187
Jun 200016,05229.304.40$70,585
May 200016,64027.263.68$61,231
Apr 200016,53724.513.12$51,529
Mar 200016,24328.422.86$46,451
Feb 200017,00727.622.73$46,370
Jan 200018,13225.272.48$44,976
Dec 199916,28124.282.42$39,461
Nov 199916,97123.192.43$41,307
Oct 199919,29720.982.80$54,103
Sep 199916,31421.752.62$42,724
Aug 199918,19219.262.88$52,313
Jul 199919,09517.892.37$45,300
Jun 199921,10215.942.36$49,845
May 199913,41915.792.32$31,146
Apr 199919,40215.102.21$42,841
Mar 199923,36112.471.84$42,945
Feb 199913,5989.981.82$24,718
Jan 199917,96210.381.90$34,127
Dec 199818,2129.201.77$32,296
Nov 199817,25610.892.19$37,717
Oct 199822,43412.421.97$44,177
Sep 199823,16112.592.08$48,236
Aug 19986,57411.301.91$12,539
Jul 199817,80711.742.24$39,839
Jun 19988,89111.242.24$19,892
May 19988,00112.622.21$17,653
Apr 199815,79713.042.51$39,577
Mar 1998012.802.31$0
Feb 1998013.952.30$0
Jan 1998014.702.15$0
Dec 1997016.322.41$0
Nov 199713818.193.09$426
Oct 199713019.253.15$409
Sep 19977917.742.95$233
Aug 19976417.862.55$164
Jul 199715417.582.25$346
Jun 199714717.242.26$332
May 19972,69618.972.31$6,224
Apr 199710,31717.882.08$21,488
Mar 199714,32618.951.94$27,780
Feb 199716,88020.492.21$37,236
Jan 199718,46423.483.54$65,357
Dec 199618,66323.32$0
Nov 199615,92021.97$0
Oct 199618,63123.31$0
Sep 199621,34622.22$0
Aug 199618,71320.26$0
Jul 19964,01919.55$0
Jun 19962818.73$0
May 199622019.43$0
Apr 19966,48621.51$0
Mar 199611,14219.38$0
Feb 199610,83016.98$0
Jan 199614,83717.07$0
Dec 199519,84617.19$0
Nov 199519,01416.00$0
Oct 199514,19215.43$0
Sep 199519,18516.18$0
Aug 199512,06015.92$0
Jul 19958,78815.24$0
Jun 199515,38716.41$0
May 199523,63317.56$0
Apr 199524,27317.73$0
Mar 199522,68116.44$0
Feb 199523,55616.58$0
Jan 199525,93415.92$0
Dec 199425,60315.03$0
Nov 199422,70115.90$0
Oct 199428,66215.58$0
Sep 199420,05815.29$0
Aug 199422,74716.13$0
Jul 19947,81917.56$0
Jun 19946,55017.09$0
May 19946,34615.88$0
Apr 19949,40514.14$0
Mar 199411,97512.46$0
Feb 199413,34012.50$0
Jan 199420,81012.66$0
Dec 199325,93812.33$0
Nov 199320,93414.49$0
Oct 199327,41615.85$0
Sep 199327,34015.03$0
Aug 199323,85015.66$0
Jul 199315915.46$0
Jun 199320,69216.79$0
May 199312,91117.68$0
Apr 19937,06218.05$0
Mar 19937,10818.14$0
Feb 199321,49817.90$0
Jan 199329,20616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2001 — as filed, then multipliedworked
Gas                5,489 Mcf  × $  8.40 =    $46,101

────────────────────────────────────────────────────
Month total                                  $46,101

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/37714 is the state's own key, not one this site invented.