BOHR

Operated by BOHR, BILL & LEON (P-5 79570) in the PANHANDLE, WEST field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 38759District 10Field 68831001GasSaveExport
Value, all time
$18 k
Jan 1993 – Feb 2016
Value, last 12 filed months
$144
at the published price for each month
Months reported
278
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,532 leases and 4,532 wells, and the rule below applies to all of them.

Discovered
1933-02-08
as the register files it
Field class
Gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 2013-11-12.

The Commission's schedule remark for this field reads: IS HEREBY SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction4,656 Mcf$18,267
Total$18,267

960 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.2399, -101.0466. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.23994, -101.04663 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
2,904 ft
1 wells filed one
Completion to plug
50.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,904 ft.

Completions filed
May 1965
1 of 1 wells
Plug dates filed
Feb 2016
1 of 1 wells

Last completion to plug: a median of 50.8 years across the 1 well that filed both dates, with the middle half between 50.8 years and 50.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1790015212,904 ftMay 1965Feb 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (278)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

278 months

Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 20151048.152.95$29
Jun 20151056.152.88$29
May 20151055.212.96$30
Apr 20151049.822.71$27
Mar 20151042.892.93$29
Feb 20151044.662.98$30
Jan 20151043.433.10$31
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 20141494.734.73$66
Apr 20141195.944.81$53
Mar 2014995.895.06$46
Feb 20141097.406.19$62
Jan 20141390.404.86$63
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 20131797.423.78$64
Sep 201315104.113.72$56
Aug 201320104.253.52$70
Jul 201310102.523.72$37
Jun 20131494.403.93$55
May 20131594.834.15$62
Apr 20131193.964.28$47
Mar 20131093.623.91$39
Feb 2013991.233.42$31
Jan 20131191.603.42$38
Dec 20121086.773.42$34
Nov 2012986.953.62$33
Oct 20121189.383.40$37
Sep 20121094.672.92$29
Aug 2012992.662.91$26
Jul 20121185.133.02$33
Jun 20121079.822.52$25
May 2012991.612.49$22
Apr 201211101.652.00$22
Mar 201210105.052.22$22
Feb 201211101.102.57$28
Jan 2012998.092.73$25
Dec 20111196.873.24$36
Nov 20111095.723.31$33
Oct 20111184.983.65$40
Sep 2011983.623.99$36
Aug 20111183.404.15$46
Jul 2011994.144.52$41
Jun 20111292.904.64$56
May 20111098.134.40$44
Apr 201111105.964.33$48
Mar 20111096.364.06$41
Feb 20111185.644.18$46
Jan 2011986.504.59$41
Dec 20101085.734.35$43
Nov 20101180.843.80$42
Oct 2010978.103.51$32
Sep 20101172.633.98$44
Aug 2010973.684.42$40
Jul 20101172.554.74$52
Jun 2010970.364.91$44
May 20101171.124.24$47
Apr 20101081.694.12$41
Mar 20101278.394.39$53
Feb 2010973.585.44$49
Jan 20101074.365.96$60
Dec 20091171.445.48$60
Nov 20091074.593.75$38
Oct 2009972.544.11$37
Sep 20091065.543.06$31
Aug 20091167.423.22$35
Jul 20092061.133.46$69
Jun 20092066.163.90$78
May 20092054.743.93$79
Apr 20092046.773.59$72
Mar 20092042.144.06$81
Feb 20092032.814.63$93
Jan 20092035.865.37$107
Dec 20082037.105.98$120
Nov 20082055.496.86$137
Oct 20082075.246.92$138
Sep 200820101.767.88$158
Aug 200820114.228.48$170
Jul 200820131.0811.39$228
Jun 200820131.3313.03$261
May 200820123.1711.57$231
Apr 200820110.3110.45$209
Mar 200820101.909.66$193
Feb 20082092.538.77$175
Jan 20082090.388.21$164
Dec 20072088.337.30$146
Nov 20072091.677.29$146
Oct 20072082.856.92$138
Sep 20072075.846.24$125
Aug 20072069.066.39$128
Jul 20072070.906.39$128
Jun 20072062.007.55$151
May 20072058.747.85$157
Apr 20072059.617.81$156
Mar 20072056.927.30$146
Feb 20072055.108.22$164
Jan 20072050.306.73$135
Dec 20062056.656.92$138
Nov 20062054.207.62$152
Oct 20062054.906.01$120
Sep 20062060.085.04$101
Aug 20062068.717.34$147
Jul 20062069.376.34$127
Jun 20062066.286.38$128
May 20062066.016.42$129
Apr 20062064.397.36$147
Mar 20062056.707.08$142
Feb 20062057.597.75$155
Jan 20062060.598.93$179
Dec 20052054.9413.42$268
Nov 20052054.6910.59$212
Oct 20052058.3413.80$276
Sep 20052061.4512.08$242
Aug 20052061.519.80$196
Jul 20052055.697.84$157
Jun 20052052.337.38$148
May 20052045.226.65$133
Apr 20052049.207.36$147
Mar 20052050.377.15$143
Feb 20052045.226.31$126
Jan 20052043.166.32$126
Dec 20042039.866.75$135
Nov 20042045.286.33$127
Oct 20042049.706.52$130
Sep 20042043.245.28$106
Aug 20042042.375.55$111
Jul 20042038.286.08$122
Jun 20042036.106.43$129
May 20042037.486.49$130
Apr 20042034.475.86$117
Mar 20042034.365.53$111
Feb 20042032.455.51$110
Jan 20042032.036.30$126
Dec 20032030.266.30$126
Nov 20032028.804.60$92
Oct 20032028.174.76$95
Sep 20032026.314.75$95
Aug 20032029.765.13$103
Jul 20032029.415.17$103
Jun 20032028.565.98$120
May 20032026.595.97$119
Apr 20032026.675.41$108
Mar 20032031.146.10$122
Feb 20032033.487.93$159
Jan 20032030.315.58$112
Dec 20022026.914.85$97
Nov 20022024.664.14$83
Oct 20022026.464.23$85
Sep 20022027.443.64$73
Aug 20022025.963.16$63
Jul 20022024.583.06$61
Jun 20022023.733.34$67
May 20022024.663.58$72
Apr 20022023.653.51$70
Mar 20022022.003.10$62
Feb 20022018.222.38$48
Jan 20022017.172.38$48
Dec 20012016.932.36$47
Nov 20012018.072.41$48
Oct 20012019.782.53$51
Sep 20012024.262.25$45
Aug 20012024.873.05$61
Jul 20012023.933.20$64
Jun 20012024.563.82$76
May 20012025.524.31$86
Apr 20012024.685.34$107
Mar 20012024.545.38$108
Feb 20012027.755.77$115
Jan 20012027.478.40$168
Dec 20002026.889.12$182
Nov 20002032.215.66$113
Oct 20002031.235.15$103
Sep 20002031.875.19$104
Aug 20002029.644.54$91
Jul 20002028.534.09$82
Jun 20002029.304.40$88
May 20002027.263.68$74
Apr 20002024.513.12$62
Mar 20002028.422.86$57
Feb 20002027.622.73$55
Jan 20002025.272.48$50
Dec 19992024.282.42$48
Nov 19992023.192.43$49
Oct 19992020.982.80$56
Sep 19992021.752.62$52
Aug 19992019.262.88$58
Jul 19992017.892.37$47
Jun 19992015.942.36$47
May 19992015.792.32$46
Apr 19992015.102.21$44
Mar 19992012.471.84$37
Feb 1999209.981.82$36
Jan 19992010.381.90$38
Dec 1998209.201.77$35
Nov 19982010.892.19$44
Oct 19982012.421.97$39
Sep 19982012.592.08$42
Aug 19982011.301.91$38
Jul 19982011.742.24$45
Jun 19982011.242.24$45
May 19982012.622.21$44
Apr 19982013.042.51$50
Mar 19982012.802.31$46
Feb 19982013.952.30$46
Jan 19982014.702.15$43
Dec 19972016.322.41$48
Nov 19972018.193.09$62
Oct 19972019.253.15$63
Sep 19972017.742.95$59
Aug 19972017.862.55$51
Jul 19972017.582.25$45
Jun 19972017.242.26$45
May 19972018.972.31$46
Apr 19972017.882.08$42
Mar 19972018.951.94$39
Feb 19972020.492.21$44
Jan 19972023.483.54$71
Dec 19962023.32$0
Nov 19962021.97$0
Oct 19962023.31$0
Sep 19962022.22$0
Aug 19962020.26$0
Jul 19962019.55$0
Jun 19962018.73$0
May 19962019.43$0
Apr 19962021.51$0
Mar 19962019.38$0
Feb 19962016.98$0
Jan 19962017.07$0
Dec 19952017.19$0
Nov 19952016.00$0
Oct 19952015.43$0
Sep 19952016.18$0
Aug 19952015.92$0
Jul 19952015.24$0
Jun 19952016.41$0
May 19952017.56$0
Apr 19952017.73$0
Mar 19952016.44$0
Feb 19952016.58$0
Jan 19952015.92$0
Dec 19942015.03$0
Nov 19942015.90$0
Oct 19942015.58$0
Sep 19942015.29$0
Aug 19942016.13$0
Jul 19942017.56$0
Jun 19942017.09$0
May 19942015.88$0
Apr 19942014.14$0
Mar 19942012.46$0
Feb 19942012.50$0
Jan 19942012.66$0
Dec 19932012.33$0
Nov 19932014.49$0
Oct 19932015.85$0
Sep 19932015.03$0
Aug 19932015.66$0
Jul 19932015.46$0
Jun 19932016.79$0
May 19932017.68$0
Apr 19932018.05$0
Mar 19932018.14$0
Feb 19932017.90$0
Jan 19932016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2015 — as filed, then multipliedworked
Gas                   10 Mcf  × $  2.95 =        $29

────────────────────────────────────────────────────
Month total                                      $29

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/38759 is the state's own key, not one this site invented.