Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the BERNSTEIN (MORROW, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 43760District 10Field 07363710CondensateGasSaveExport
Value, all time
$2.0 M
Jan 1993 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 36 wells, and the rule below applies to all of them.

Discovered
1955-05-19
as the register files it
Field class
Gas
the register's own label
Between wells
2,500 ft
minimum
From a lease line
1,250 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: SURVEY

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition695 bbl$25,952
GasProduction660,059 Mcf$1,964,650
Total$1,990,602

212,551 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3388, -101.2675. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.33879, -101.26752 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,074 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,074 ft.

Completions filed
Oct 1967
1 of 1 wells

1 well

42-1958057827,074 ftOct 1967

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260689.753.15$19
Feb 202602563.503.75$94
Jan 2026010659.138.00$848
Dec 2025012856.664.41$565
Nov 2025011658.593.93$455
Oct 202508259.383.30$271
Sep 202504662.743.08$142
Aug 20250063.933.01$0
Jul 202506966.743.32$229
Jun 202507766.483.13$241
May 2025010360.553.23$333
Apr 202503562.363.54$124
Mar 202502667.704.27$111
Feb 20250070.884.34$0
Jan 202503174.324.28$133
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202405071.372.28$114
Sep 202406769.612.36$158
Aug 202401475.632.06$29
Jul 20240379.932.15$6
Jun 2024017378.082.63$456
May 2024020978.812.20$459
Apr 2024028084.451.66$465
Mar 2024030180.301.55$465
Feb 2024028776.091.78$512
Jan 2024018873.023.30$620
Dec 2023027271.262.61$710
Nov 2023016377.892.81$458
Oct 2023025885.443.09$797
Sep 2023029989.042.74$818
Aug 2023021380.522.67$569
Jul 2023017074.852.64$449
Jun 2023017068.962.26$384
May 2023022470.622.23$499
Apr 2023029178.122.24$651
Mar 2023033272.852.39$795
Feb 2023025775.112.47$634
Jan 2023025476.533.39$860
Dec 2022029576.415.73$1,690
Nov 2022037485.005.65$2,112
Oct 2022029087.185.86$1,700
Sep 2022028984.888.16$2,359
Aug 2022035194.529.13$3,204
Jul 202200101.587.54$0
Jun 20220276115.097.98$2,202
May 20220295109.378.43$2,488
Apr 20220318104.226.84$2,174
Mar 20220144108.885.08$731
Feb 2022020291.054.86$981
Jan 2022030781.844.54$1,393
Dec 2021019171.323.90$745
Nov 2021024577.435.24$1,283
Oct 2021026579.795.71$1,514
Sep 20210069.865.35$0
Aug 2021027166.024.22$1,144
Jul 2021027170.783.98$1,079
Jun 2021026669.493.38$899
May 2021027563.483.02$830
Apr 2021027760.362.76$764
Mar 2021032761.302.72$888
Feb 202106457.805.55$355
Jan 2021024650.412.81$691
Dec 2020024644.642.68$658
Nov 20200038.772.71$0
Oct 2020025636.972.48$634
Sep 2020028237.091.99$561
Aug 2020028839.982.39$687
Jul 2020029038.371.83$529
Jun 2020031734.901.69$536
May 2020038816.921.81$704
Apr 2020030414.751.80$549
Mar 202001430.341.86$26
Feb 202001749.881.98$34
Jan 202001657.252.09$34
Dec 201902159.012.30$48
Nov 2019017255.302.75$473
Oct 201904353.472.42$104
Sep 2019011355.052.66$300
Aug 2019069153.112.30$1,592
Jul 2019041156.272.46$1,011
Jun 2019039652.782.49$987
May 2019049958.482.74$1,367
Apr 2019040062.632.75$1,100
Mar 2019024456.803.06$747
Feb 2019014650.852.79$408
Jan 2019023046.033.23$742
Dec 2018031346.594.19$1,310
Nov 2018027252.934.24$1,153
Oct 2018011561.443.40$391
Sep 201808759.543.11$270
Aug 2018021159.403.07$647
Jul 2018010865.142.93$317
Jun 2018043160.183.08$1,326
May 2018061065.382.90$1,769
Apr 2018059163.842.90$1,714
Mar 2018055561.222.79$1,547
Feb 2018037461.782.77$1,035
Jan 2018041262.874.01$1,652
Dec 2017039657.272.92$1,157
Nov 2017041555.423.12$1,294
Oct 2017043849.292.98$1,307
Sep 2017045347.523.09$1,399
Aug 2017054345.373.00$1,631
Jul 2017079943.873.09$2,467
Jun 2017090242.493.09$2,785
May 2017063845.373.26$2,082
Apr 2017070247.933.21$2,255
Mar 2017079946.772.98$2,384
Feb 2017034250.452.95$1,010
Jan 2017025249.413.42$862
Dec 2016057148.763.72$2,126
Nov 2016058742.492.64$1,552
Oct 2016062246.193.09$1,922
Sep 2016059841.553.10$1,854
Aug 2016064141.442.92$1,875
Jul 20161062941.622.92$2,256
Jun 2016060345.352.69$1,620
May 2016060242.521.99$1,199
Apr 2016057036.561.99$1,135
Mar 2016057033.011.79$1,023
Feb 2016054526.472.06$1,125
Jan 2016067627.352.36$1,598
Dec 2015089432.362.00$1,789
Nov 2015068538.792.17$1,485
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 2015082048.152.95$2,415
Jun 2015076556.152.88$2,205
May 2015068755.212.96$2,030
Apr 2015081849.822.71$2,214
Mar 2015084642.892.93$2,483
Feb 2015070544.662.98$2,098
Jan 2015063443.433.10$1,966
Dec 2014093854.693.59$3,369
Nov 201401,00670.464.25$4,277
Oct 201401,02178.303.90$3,983
Sep 2014098386.164.05$3,977
Aug 2014085089.394.04$3,430
Jul 20141457496.564.18$3,751
Jun 2014073598.164.74$3,482
May 201401,11594.734.73$5,270
Apr 2014058495.944.81$2,809
Mar 2014096495.895.06$4,875
Feb 2014042797.406.19$2,644
Jan 2014086890.404.86$4,219
Dec 2013069291.824.35$3,013
Nov 2013066188.853.74$2,471
Oct 2013074697.423.78$2,819
Sep 201301,038104.113.72$3,859
Aug 201301,173104.253.52$4,132
Jul 201301,031102.523.72$3,833
Jun 201301,03094.403.93$4,051
May 201301,07094.834.15$4,440
Apr 201301,05393.964.28$4,510
Mar 201301,14193.623.91$4,465
Feb 2013098591.233.42$3,369
Jan 2013057391.603.42$1,960
Dec 201201,03786.773.42$3,547
Nov 201201,21086.953.62$4,386
Oct 201201,30489.383.40$4,433
Sep 2012082794.672.92$2,414
Aug 201201,14792.662.91$3,336
Jul 201201,47785.133.02$4,462
Jun 201201,36779.822.52$3,444
May 2012088391.612.49$2,197
Apr 201201,097101.652.00$2,190
Mar 201201,396105.052.22$3,102
Feb 201201,270101.102.57$3,264
Jan 201201,39698.092.73$3,817
Dec 201108896.873.24$285
Nov 2011093695.723.31$3,099
Oct 201101,32684.983.65$4,838
Sep 201101,32783.623.99$5,289
Aug 201101,40083.404.15$5,809
Jul 201101,45794.144.52$6,582
Jun 201101,14792.904.64$5,322
May 201101,62398.134.40$7,149
Apr 2011901,374105.964.33$15,490
Mar 201101,55996.364.06$6,325
Feb 201101,04685.644.18$4,372
Jan 2011065686.504.59$3,010
Dec 201001,35685.734.35$5,896
Nov 201001,10580.843.80$4,194
Oct 201001,51478.103.51$5,312
Sep 201001,32372.633.98$5,265
Aug 201001,46873.684.42$6,488
Jul 201001,44272.554.74$6,830
Jun 201001,39270.364.91$6,835
May 201001,38871.124.24$5,878
Apr 201001,51181.694.12$6,229
Mar 201001,64378.394.39$7,211
Feb 201001,32973.585.44$7,233
Jan 201001,31374.365.96$7,831
Dec 200901,15871.445.48$6,350
Nov 200901,72674.593.75$6,475
Oct 200901,75072.544.11$7,193
Sep 200901,40865.543.06$4,315
Aug 200901,44767.423.22$4,657
Jul 200901,71261.133.46$5,931
Jun 200901,61966.163.90$6,306
May 200901,63554.743.93$6,419
Apr 200901,82846.773.59$6,558
Mar 2009048442.144.06$1,965
Feb 200901,21032.814.63$5,606
Jan 200901,01935.865.37$5,473
Dec 2008095537.105.98$5,708
Nov 200801,49755.496.86$10,270
Oct 200801,55275.246.92$10,743
Sep 200801,264101.767.88$9,957
Aug 200801,350114.228.48$11,452
Jul 200801,405131.0811.39$16,002
Jun 200801,438131.3313.03$18,741
May 200801,417123.1711.57$16,401
Apr 200801,439110.3110.45$15,045
Mar 200801,468101.909.66$14,187
Feb 200801,29492.538.77$11,349
Jan 200801,37990.388.21$11,316
Dec 200701,26588.337.30$9,237
Nov 200701,26591.677.29$9,224
Oct 200701,01782.856.92$7,040
Sep 200701,33175.846.24$8,311
Aug 200701,16169.066.39$7,416
Jul 200701,62970.906.39$10,406
Jun 200701,13162.007.55$8,537
May 200701,53458.747.85$12,036
Apr 200701,86059.617.81$14,518
Mar 200701,54656.927.30$11,289
Feb 200701,25855.108.22$10,336
Jan 2007092850.306.73$6,243
Dec 200601,30356.656.92$9,015
Nov 2006086554.207.62$6,589
Oct 200601,89854.906.01$11,414
Sep 20061221,91260.085.04$16,961
Aug 200601,94268.717.34$14,254
Jul 200602,14269.376.34$13,586
Jun 200601,52266.286.38$9,716
May 200601,69166.016.42$10,865
Apr 200601,91164.397.36$14,066
Mar 200602,00856.707.08$14,223
Feb 200601,59257.597.75$12,340
Jan 200602,05460.598.93$18,349
Dec 200501,81654.9413.42$24,362
Nov 200501,74654.6910.59$18,487
Oct 200501,57658.3413.80$21,742
Sep 200501,78561.4512.08$21,561
Aug 200501,90661.519.80$18,673
Jul 200502,18755.697.84$17,154
Jun 200502,18752.337.38$16,142
May 200501,92445.226.65$12,797
Apr 200502,11649.207.36$15,575
Mar 200501,99550.377.15$14,274
Feb 200501,72345.226.31$10,875
Jan 200501,77843.166.32$11,241
Dec 200402,62439.866.75$17,715
Nov 200401,65745.286.33$10,490
Oct 200402,37649.706.52$15,480
Sep 200401,33643.245.28$7,059
Aug 200402,41842.375.55$13,422
Jul 200402,10538.286.08$12,807
Jun 200402,11836.106.43$13,625
May 200402,41137.486.49$15,658
Apr 200402,41934.475.86$14,172
Mar 200402,44334.365.53$13,510
Feb 200402,17332.455.51$11,972
Jan 200402,32932.036.30$14,672
Dec 200302,68930.266.30$16,945
Nov 200302,81128.804.60$12,917
Oct 200301,36528.174.76$6,497
Sep 2003049326.314.75$2,341
Aug 200302,85729.765.13$14,656
Jul 200303,06929.415.17$15,869
Jun 200303,10128.565.98$18,553
May 200301,58626.595.97$9,473
Apr 2003072026.675.41$3,893
Mar 200301,10031.146.10$6,706
Feb 2003022133.487.93$1,752
Jan 2003070930.315.58$3,958
Dec 200201,39126.914.85$6,752
Nov 200201,82324.664.14$7,542
Oct 200202,20926.464.23$9,342
Sep 200241,43127.443.64$5,312
Aug 200201,87825.963.16$5,942
Jul 200201,78024.583.06$5,450
Jun 200202,00723.733.34$6,700
May 200202,45524.663.58$8,799
Apr 200202,05623.653.51$7,221
Mar 200202,31422.003.10$7,180
Feb 200202,06418.222.38$4,903
Jan 200202,24817.172.38$5,341
Dec 200102,40016.932.36$5,675
Nov 200101,87418.072.41$4,508
Oct 200102,39219.782.53$6,049
Sep 200102,42124.262.25$5,450
Aug 200102,90024.873.05$8,854
Jul 200102,85723.933.20$9,134
Jun 200102,70724.563.82$10,352
May 200101,96125.524.31$8,447
Apr 200102,41324.685.34$12,874
Mar 200102,91024.545.38$15,645
Feb 200102,83927.755.77$16,373
Jan 200103,07927.478.40$25,860
Dec 200002,57426.889.12$23,481
Nov 200002,82432.215.66$15,978
Oct 200003,08131.235.15$15,853
Sep 200003,22131.875.19$16,706
Aug 200003,08229.644.54$13,995
Jul 200002,31028.534.09$9,447
Jun 200001,92329.304.40$8,456
May 2000152,60527.263.68$9,995
Apr 200002,81524.513.12$8,772
Mar 200003,07828.422.86$8,802
Feb 200002,74127.622.73$7,473
Jan 200003,39825.272.48$8,429
Dec 199902,87524.282.42$6,968
Nov 199902,43323.192.43$5,922
Oct 199902,90320.982.80$8,139
Sep 199903,02021.752.62$7,909
Aug 199902,99219.262.88$8,604
Jul 199902,83917.892.37$6,735
Jun 199902,24515.942.36$5,303
May 199902,92815.792.32$6,796
Apr 199903,31215.102.21$7,313
Mar 1999643,82612.471.84$7,832
Feb 199903,8339.981.82$6,968
Jan 199962,55510.381.90$4,917
Dec 199803,1329.201.77$5,554
Nov 199803,65310.892.19$7,984
Oct 199803,65512.421.97$7,197
Sep 19980012.592.08$0
Aug 199802,10511.301.91$4,015
Jul 199803,56311.742.24$7,971
Jun 199803,19411.242.24$7,146
May 199803,75212.622.21$8,278
Apr 199803,47013.042.51$8,694
Mar 199802,66212.802.31$6,148
Feb 199803,06013.952.30$7,035
Jan 199803,76414.702.15$8,111
Dec 199702,88316.322.41$6,951
Nov 19971552,93218.193.09$11,874
Oct 199703,21419.253.15$10,124
Sep 199703,40917.742.95$10,073
Aug 199703,17917.862.55$8,122
Jul 199703,11517.582.25$6,999
Jun 199703,26117.242.26$7,361
May 199703,51618.972.31$8,117
Apr 199703,54817.882.08$7,390
Mar 199703,41818.951.94$6,628
Feb 199703,31320.492.21$7,308
Jan 199703,63423.483.54$12,863
Dec 199603,85723.32$0
Nov 199603,50121.97$0
Oct 199603,85923.31$0
Sep 199603,54422.22$0
Aug 199604,20120.26$0
Jul 199602,85119.55$0
Jun 199603,92718.73$0
May 199603,44119.43$0
Apr 199604,08521.51$0
Mar 199604,07019.38$0
Feb 199604,90116.98$0
Jan 199604,02117.07$0
Dec 199504,45817.19$0
Nov 199504,25416.00$0
Oct 199504,59215.43$0
Sep 199504,62816.18$0
Aug 199504,05715.92$0
Jul 199503,26815.24$0
Jun 199504,45916.41$0
May 199504,20217.56$0
Apr 199504,41617.73$0
Mar 19951144,72116.44$1,874
Feb 199504,29416.58$0
Jan 199504,70915.92$0
Dec 199404,75315.03$0
Nov 199404,92815.90$0
Oct 199405,11215.58$0
Sep 199405,30115.29$0
Aug 199403,09016.13$0
Jul 199404,70517.56$0
Jun 199404,62717.09$0
May 199404,44115.88$0
Apr 199404,85314.14$0
Mar 199404,31012.46$0
Feb 199404,22912.50$0
Jan 199404,90412.66$0
Dec 19931015,22112.33$1,245
Nov 199305,21714.49$0
Oct 199304,68515.85$0
Sep 199304,90215.03$0
Aug 199303,26415.66$0
Jul 199305,09715.46$0
Jun 199304,92916.79$0
May 199304,97217.68$0
Apr 199305,17418.05$0
Mar 199305,20418.14$0
Feb 199304,99517.90$0
Jan 199305,32216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.75 =         $0
Gas                    6 Mcf  × $  3.15 =        $19

────────────────────────────────────────────────────
Month total                                      $19

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/43760 is the state's own key, not one this site invented.