SMITH, MARTHA ANN

Operated by BP AMERICA PRODUCTION COMPANY (P-5 40798) in the LIPSCOMB (ATOKA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 56612District 10Field 53869090CondensateGasSaveExport
Value, all time
$692 k
Jan 1993 – Sep 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
165
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 74 leases and 74 wells, and the rule below applies to all of them.

Discovered
1957-12-04
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 640 acres. The field rule took effect on 2008-09-23.

The Commission's schedule remark for this field reads: FORMULA.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition266 bbl$3,522
GasProduction477,695 Mcf$688,354
Total$691,876

249,076 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2633, -100.1086. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.26334, -100.10861 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
14,688 ft
1 wells filed one
Completion to plug
33.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,688 ft.

Completions filed
Sep 1973
1 of 1 wells
Plug dates filed
Sep 2006
1 of 1 wells

Last completion to plug: a median of 33.0 years across the 1 well that filed both dates, with the middle half between 33.0 years and 33.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-29530012114,688 ftSep 1973Sep 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (165)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

165 months

Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 200302133.487.93$166
Jan 20030030.315.58$0
Dec 200201926.914.85$92
Nov 200201824.664.14$74
Oct 200201926.464.23$80
Sep 200201827.443.64$65
Aug 200221925.963.16$112
Jul 200232024.583.06$135
Jun 200201823.733.34$60
May 2002029624.663.58$1,061
Apr 200236423.653.51$296
Mar 200201922.003.10$59
Feb 200201718.222.38$40
Jan 200201917.172.38$45
Dec 200101916.932.36$45
Nov 200101,31418.072.41$3,161
Oct 200101,96619.782.53$4,972
Sep 200101,70124.262.25$3,830
Aug 2001043824.873.05$1,337
Jul 200101,44623.933.20$4,623
Jun 200103,50424.563.82$13,400
May 200103,85825.524.31$16,618
Apr 200103,42024.685.34$18,247
Mar 200103,26524.545.38$17,554
Feb 200103,06127.755.77$17,653
Jan 200103,46327.478.40$29,085
Dec 200003,19826.889.12$29,174
Nov 200003,28632.215.66$18,592
Oct 200003,57831.235.15$18,411
Sep 200003,34931.875.19$17,370
Aug 200003,82629.644.54$17,373
Jul 200003,29128.534.09$13,459
Jun 200002,66229.304.40$11,705
May 200003,58127.263.68$13,177
Apr 200003,76724.513.12$11,738
Mar 200003,67528.422.86$10,510
Feb 200003,87927.622.73$10,576
Jan 200004,24925.272.48$10,540
Dec 199904,44324.282.42$10,769
Nov 199903,71223.192.43$9,035
Oct 199904,53620.982.80$12,718
Sep 199904,22421.752.62$11,062
Aug 199904,17019.262.88$11,991
Jul 199904,70017.892.37$11,150
Jun 199904,33215.942.36$10,233
May 199903,45415.792.32$8,017
Apr 199903,70215.102.21$8,174
Mar 199963,61012.471.84$6,711
Feb 199904,1179.981.82$7,484
Jan 1999854,60310.381.90$9,628
Dec 199804,3659.201.77$7,741
Nov 199803,87210.892.19$8,463
Oct 199804,55312.421.97$8,966
Sep 1998584,19912.592.08$9,475
Aug 199804,15911.301.91$7,933
Jul 199804,59111.742.24$10,271
Jun 199804,40411.242.24$9,853
May 199805,03312.622.21$11,105
Apr 199804,48613.042.51$11,239
Mar 199804,40312.802.31$10,168
Feb 199804,24913.952.30$9,769
Jan 199804,37814.702.15$9,434
Dec 199704,44816.322.41$10,725
Nov 199704,34218.193.09$13,409
Oct 199704,80619.253.15$15,138
Sep 199704,34717.742.95$12,845
Aug 199704,71017.862.55$12,033
Jul 199704,87717.582.25$10,958
Jun 199704,61517.242.26$10,417
May 199704,67118.972.31$10,783
Apr 199704,53117.882.08$9,437
Mar 199705,03718.951.94$9,767
Feb 199704,49620.492.21$9,918
Jan 199705,08123.483.54$17,985
Dec 199604,68823.32$0
Nov 199604,70621.97$0
Oct 199604,92623.31$0
Sep 199604,48822.22$0
Aug 199604,60420.26$0
Jul 199604,88019.55$0
Jun 199604,85818.73$0
May 199604,34619.43$0
Apr 199604,84321.51$0
Mar 199605,11319.38$0
Feb 199604,84616.98$0
Jan 199605,09217.07$0
Dec 199504,88317.19$0
Nov 199505,47516.00$0
Oct 199505,31715.43$0
Sep 199505,10016.18$0
Aug 199505,41815.92$0
Jul 199505,79215.24$0
Jun 199504,71616.41$0
May 199505,33917.56$0
Apr 199505,51617.73$0
Mar 199505,37516.44$0
Feb 199505,07416.58$0
Jan 199505,41015.92$0
Dec 19941095,59115.03$1,638
Nov 199405,27415.90$0
Oct 199405,69015.58$0
Sep 199405,82115.29$0
Aug 199405,97916.13$0
Jul 199405,45517.56$0
Jun 199404,97717.09$0
May 199406,11815.88$0
Apr 199405,93914.14$0
Mar 199406,22812.46$0
Feb 199402,91112.50$0
Jan 199405,82412.66$0
Dec 199306,09912.33$0
Nov 199305,21114.49$0
Oct 199304,58115.85$0
Sep 199305,75715.03$0
Aug 199305,64015.66$0
Jul 199305,87015.46$0
Jun 199306,68916.79$0
May 199304,66117.68$0
Apr 199306,49218.05$0
Mar 199304,88918.14$0
Feb 199302,86817.90$0
Jan 199303,70716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2003 — as filed, then multipliedworked
Condensate             0 bbl  × $ 33.48 =         $0
Gas                   21 Mcf  × $  7.93 =       $166

────────────────────────────────────────────────────
Month total                                     $166

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/56612 is the state's own key, not one this site invented.