VENNEMAN

Operated by APACHE CORPORATION (P-5 27200) in the BERNSTEIN (MORROW, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 65925District 10Field 07363710CondensateGasSaveExport
Value, all time
$176 k
Jan 1993 – Sep 2002
Value, last 12 filed months
$0
at the published price for each month
Months reported
117
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 36 wells, and the rule below applies to all of them.

Discovered
1955-05-19
as the register files it
Field class
Gas
the register's own label
Between wells
2,500 ft
minimum
From a lease line
1,250 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: SURVEY

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition275 bbl$4,586
GasProduction212,022 Mcf$171,225
Total$175,811

141,083 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.4011, -101.3117. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.40114, -101.31173 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,205 ft
1 wells filed one
Completion to plug
24.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,205 ft.

Completions filed
Dec 1977
1 of 1 wells
Plug dates filed
Sep 2002
1 of 1 wells

Last completion to plug: a median of 24.8 years across the 1 well that filed both dates, with the middle half between 24.8 years and 24.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-195302381 T7,205 ftDec 1977Sep 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (117)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

117 months

Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20008031.235.15$250
Sep 20000031.875.19$0
Aug 200010029.644.54$296
Jul 20000928.534.09$37
Jun 2000062229.304.40$2,735
May 200001,18627.263.68$4,364
Apr 200001,21524.513.12$3,786
Mar 200001,24528.422.86$3,560
Feb 200001,23727.622.73$3,373
Jan 200001,20425.272.48$2,987
Dec 199901,27924.282.42$3,100
Nov 199901,40523.192.43$3,420
Oct 199901,79020.982.80$5,019
Sep 199901,18321.752.62$3,098
Aug 199901,67519.262.88$4,817
Jul 199901,28517.892.37$3,049
Jun 1999681,80015.942.36$5,336
May 199902,21615.792.32$5,143
Apr 199901,61415.102.21$3,564
Mar 199902,05412.471.84$3,776
Feb 199902,1449.981.82$3,897
Jan 1999431,57910.381.90$3,446
Dec 199801,8049.201.77$3,199
Nov 199802,06210.892.19$4,507
Oct 199801,83712.421.97$3,617
Sep 199802,38712.592.08$4,971
Aug 199801,49811.301.91$2,857
Jul 199801,47511.742.24$3,300
Jun 199801,52111.242.24$3,403
May 199802,21012.622.21$4,876
Apr 199802,05213.042.51$5,141
Mar 199801,72912.802.31$3,993
Feb 199801,87513.952.30$4,311
Jan 199802,00114.702.15$4,312
Dec 199701,74616.322.41$4,210
Nov 199702,06518.193.09$6,377
Oct 199702,06619.253.15$6,508
Sep 199702,11217.742.95$6,241
Aug 199702,55717.862.55$6,532
Jul 199701,67317.582.25$3,759
Jun 199702,09717.242.26$4,733
May 199701,38918.972.31$3,207
Apr 199701,53817.882.08$3,203
Mar 199702,34018.951.94$4,538
Feb 1997090120.492.21$1,988
Jan 199701,26223.483.54$4,467
Dec 199601,46523.32$0
Nov 199601,70821.97$0
Oct 199602,26923.31$0
Sep 199602,56822.22$0
Aug 199602,33320.26$0
Jul 199602,16619.55$0
Jun 199602,67018.73$0
May 199602,62519.43$0
Apr 199602,69321.51$0
Mar 199603,03119.38$0
Feb 199602,68316.98$0
Jan 199602,77517.07$0
Dec 19951462,71017.19$2,510
Nov 199502,83316.00$0
Oct 199502,77015.43$0
Sep 199502,42516.18$0
Aug 199502,84915.92$0
Jul 199503,01815.24$0
Jun 199502,57916.41$0
May 199502,84917.56$0
Apr 199503,01917.73$0
Mar 199501,98516.44$0
Feb 199502,88416.58$0
Jan 199503,35115.92$0
Dec 199403,18715.03$0
Nov 199402,86215.90$0
Oct 199403,13415.58$0
Sep 199403,41215.29$0
Aug 199403,53516.13$0
Jul 199403,59117.56$0
Jun 199403,82217.09$0
May 199403,02415.88$0
Apr 199403,25414.14$0
Mar 199403,47312.46$0
Feb 199402,40412.50$0
Jan 199402,32812.66$0
Dec 199303,73512.33$0
Nov 199301,92514.49$0
Oct 199303,04015.85$0
Sep 199303,16615.03$0
Aug 199303,30315.66$0
Jul 199303,73315.46$0
Jun 199303,05616.79$0
May 199303,82517.68$0
Apr 199304,00618.05$0
Mar 199303,86718.14$0
Feb 199305,19217.90$0
Jan 199301,95116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2000 — as filed, then multipliedworked
Condensate             8 bbl  × $ 31.23 =       $250
Gas                    0 Mcf  × $  5.15 =         $0

────────────────────────────────────────────────────
Month total                                     $250

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/65925 is the state's own key, not one this site invented.