Operated by MEWBOURNE OIL COMPANY (P-5 562560) in the BECHTHOLD (TONKAWA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 75921District 10Field 06589500CondensateGasSaveExport
Value, all time
$96 k
Jan 1993 – Jun 2000
Value, last 12 filed months
$20 k
at the published price for each month
Months reported
90
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 58 wells, and the rule below applies to all of them.

Discovered
1959-04-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: FOR GAS WELLS.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition233 bbl$6,742
GasProduction94,327 Mcf$88,932
Total$95,675

56,499 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.4979, -100.4773. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.49793, -100.47731 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,260 ft
1 wells filed one
Completion to plug
22.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,260 ft.

Completions filed
Mar 1978
1 of 1 wells
Plug dates filed
Jun 2000
1 of 1 wells

Last completion to plug: a median of 22.3 years across the 1 well that filed both dates, with the middle half between 22.3 years and 22.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2953048716,260 ftMar 1978Jun 2000Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (90)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

90 months

Jun 2000225029.304.40$6,593
May 20000027.263.68$0
Apr 200002624.513.12$81
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 199902824.282.42$68
Nov 199901,11123.192.43$2,704
Oct 199901,18920.982.80$3,334
Sep 199901,15521.752.62$3,025
Aug 1999268719.262.88$2,014
Jul 1999082517.892.37$1,957
Jun 199901,06515.942.36$2,516
May 1999088815.792.32$2,061
Apr 199901,11215.102.21$2,455
Mar 199901,17212.471.84$2,155
Feb 199909999.981.82$1,816
Jan 199901,11610.381.90$2,120
Dec 199801,1469.201.77$2,032
Nov 199801,10210.892.19$2,409
Oct 199801,16612.421.97$2,296
Sep 199801,12012.592.08$2,333
Aug 199801,16411.301.91$2,220
Jul 199801,24011.742.24$2,774
Jun 199801,11911.242.24$2,504
May 199801,22712.622.21$2,707
Apr 199801,14213.042.51$2,861
Mar 199801,26512.802.31$2,921
Feb 199801,15313.952.30$2,651
Jan 199801,10314.702.15$2,377
Dec 199701,19016.322.41$2,869
Nov 199701,21518.193.09$3,752
Oct 199701,24519.253.15$3,922
Sep 199701,28017.742.95$3,782
Aug 199701,30917.862.55$3,344
Jul 199701,26017.582.25$2,831
Jun 199701,29617.242.26$2,925
May 199701,11518.972.31$2,574
Apr 1997052017.882.08$1,083
Mar 1997061918.951.94$1,200
Feb 1997065020.492.21$1,434
Jan 1997180923.483.54$2,887
Dec 199601,13923.32$0
Nov 199601,26721.97$0
Oct 1996075423.31$0
Sep 1996079322.22$0
Aug 1996099920.26$0
Jul 199601,10519.55$0
Jun 199601,18118.73$0
May 199601,20619.43$0
Apr 199601,15921.51$0
Mar 199601,17219.38$0
Feb 199601,10116.98$0
Jan 199601,14117.07$0
Dec 199501,06617.19$0
Nov 199501,18616.00$0
Oct 199501,26115.43$0
Sep 199501,21816.18$0
Aug 199501,26315.92$0
Jul 199501,03415.24$0
Jun 199501,04716.41$0
May 199501,09617.56$0
Apr 199501,13617.73$0
Mar 199501,14716.44$0
Feb 199501,02416.58$0
Jan 199501,15315.92$0
Dec 199401,34215.03$0
Nov 199401,15115.90$0
Oct 199401,16115.58$0
Sep 199401,28015.29$0
Aug 199401,33316.13$0
Jul 199451,34617.56$88
Jun 199401,27617.09$0
May 199401,35015.88$0
Apr 199401,29914.14$0
Mar 199401,48112.46$0
Feb 1994088912.50$0
Jan 1994044712.66$0
Dec 1993066312.33$0
Nov 199301,14614.49$0
Oct 199301,34715.85$0
Sep 199301,41515.03$0
Aug 199301,55015.66$0
Jul 199301,68615.46$0
Jun 1993056316.79$0
May 199301,40817.68$0
Apr 199301,36518.05$0
Mar 199301,43618.14$0
Feb 199301,38517.90$0
Jan 199301,53216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2000 — as filed, then multipliedworked
Condensate           225 bbl  × $ 29.30 =     $6,593
Gas                    0 Mcf  × $  4.40 =         $0

────────────────────────────────────────────────────
Month total                                   $6,593

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/75921 is the state's own key, not one this site invented.