Operated by CAMBRIDGE PRODUCTION, INC. (P-5 126783) in the GAGEBY CREEK (HUNTON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 79395District 10Field 33670333Hydrogen sulphide fieldNGPA filingCondensateGasSaveExport
Value, all time
$662 k
Jan 1993 – Nov 2003
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
131
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1964-09-13
as the register files it
Field class
Gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
1,320 ft
minimum

A drilling unit in this field needs at least 640 acres. The field rule took effect on 1991-11-13.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED EFFECTIVE 2/1/95

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition27 bbl$432
GasProduction432,425 Mcf$661,952
Total$662,384

228,755 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5702, -100.3549. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.57024, -100.35489 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
18,004 ft
1 wells filed one
Completion to plug
11 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 18,004 ft.

Completions filed
Dec 2002
1 of 1 wells
Plug dates filed
Nov 2003
1 of 1 wells

Last completion to plug: a median of 11 months across the 1 well that filed both dates, with the middle half between 11 months and 11 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4833002010818,004 ftDec 2002Nov 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (131)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

131 months

Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 200303831.146.10$232
Feb 2003018833.487.93$1,490
Jan 2003010430.315.58$581
Dec 2002079526.914.85$3,859
Nov 200203,14324.664.14$13,002
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 200203125.963.16$98
Jul 200203124.583.06$95
Jun 2002064623.733.34$2,157
May 200202,26924.663.58$8,132
Apr 200202,18723.653.51$7,681
Mar 200204,38422.003.10$13,602
Feb 200203,60318.222.38$8,560
Jan 200203,69517.172.38$8,778
Dec 200103,89516.932.36$9,209
Nov 200101,29718.072.41$3,120
Oct 200102,92419.782.53$7,394
Sep 200102,35524.262.25$5,302
Aug 200102,50924.873.05$7,660
Jul 200103,08523.933.20$9,863
Jun 200103,28324.563.82$12,555
May 200104,95425.524.31$21,338
Apr 200102,59324.685.34$13,834
Mar 200101,26424.545.38$6,796
Feb 200101,90227.755.77$10,969
Jan 200102,95727.478.40$24,835
Dec 200004,09826.889.12$37,384
Nov 200004,02732.215.66$22,785
Oct 200003,70131.235.15$19,044
Sep 200004,42231.875.19$22,935
Aug 200004,10929.644.54$18,658
Jul 200002,98628.534.09$12,212
Jun 200005,00029.304.40$21,986
May 2000073027.263.68$2,686
Apr 200001,44024.513.12$4,487
Mar 200005,71628.422.86$16,346
Feb 200002,83327.622.73$7,724
Jan 200004,50625.272.48$11,177
Dec 199904,57924.282.42$11,098
Nov 199906,66423.192.43$16,220
Oct 199909,08720.982.80$25,477
Sep 1999012,16121.752.62$31,848
Aug 1999010,48419.262.88$30,148
Jul 199902,34717.892.37$5,568
Jun 199903,75915.942.36$8,879
May 199901,24115.792.32$2,880
Apr 1999085915.102.21$1,897
Mar 199901,17512.471.84$2,160
Feb 199901,8479.981.82$3,357
Jan 199901,51110.381.90$2,871
Dec 199808659.201.77$1,534
Nov 1998098710.892.19$2,157
Oct 199801,84712.421.97$3,637
Sep 199801,87012.592.08$3,895
Aug 199801,48511.301.91$2,832
Jul 199801,80911.742.24$4,047
Jun 199801,02411.242.24$2,291
May 1998092712.622.21$2,045
Apr 1998093613.042.51$2,345
Mar 199801,66112.802.31$3,836
Feb 199801,50013.952.30$3,449
Jan 199802,19914.702.15$4,738
Dec 199702,19316.322.41$5,288
Nov 199701,10218.193.09$3,403
Oct 199701,45019.253.15$4,567
Sep 199702,21517.742.95$6,545
Aug 199702,39417.862.55$6,116
Jul 199702,13217.582.25$4,790
Jun 199722,20517.242.26$5,012
May 199703,66218.972.31$8,454
Apr 199704,65817.882.08$9,702
Mar 199702,85818.951.94$5,542
Feb 199703,38020.492.21$7,456
Jan 199704,89723.483.54$17,334
Dec 199604,38323.32$0
Nov 199604,30721.97$0
Oct 199607,36523.31$0
Sep 199604,35222.22$0
Aug 199603,31320.26$0
Jul 199603,48619.55$0
Jun 199602,05118.73$0
May 199604,47219.43$0
Apr 199603,85321.51$0
Mar 199605,22719.38$0
Feb 199604,43616.98$0
Jan 1996026417.07$0
Dec 199506,63217.19$0
Nov 199502,82916.00$0
Oct 199503,47715.43$0
Sep 199501,99816.18$0
Aug 199505,52515.92$0
Jul 199505,16915.24$0
Jun 199505,37816.41$0
May 199504,93417.56$0
Apr 199505,14517.73$0
Mar 199505,98716.44$0
Feb 199504,19916.58$0
Jan 1995256,72915.92$398
Dec 199405,98115.03$0
Nov 199404,44915.90$0
Oct 199406,75815.58$0
Sep 1994072815.29$0
Aug 199403,21716.13$0
Jul 199404,48317.56$0
Jun 199406,63717.09$0
May 199405,47615.88$0
Apr 199404,25814.14$0
Mar 199404,42912.46$0
Feb 199402,39012.50$0
Jan 199404,29012.66$0
Dec 199304,94312.33$0
Nov 199305,13514.49$0
Oct 199305,79515.85$0
Sep 199304,59715.03$0
Aug 199305,96815.66$0
Jul 199306,79215.46$0
Jun 199306,03616.79$0
May 199306,86017.68$0
Apr 199306,12518.05$0
Mar 199307,52218.14$0
Feb 199305,85117.90$0
Jan 199304,52416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2003 — as filed, then multipliedworked
Condensate             0 bbl  × $ 31.14 =         $0
Gas                   38 Mcf  × $  6.10 =       $232

────────────────────────────────────────────────────
Month total                                     $232

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/79395 is the state's own key, not one this site invented.