STUDER

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the CANADIAN, SE (DOUGLAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 96580District 10Field 15217250NGPA filingCondensateGasSaveExport
Value, all time
$6 k
Jan 1993 – Feb 2007
Value, last 12 filed months
$0
at the published price for each month
Months reported
170
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 419 leases and 430 wells, and the rule below applies to all of them.

Discovered
1972-08-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: COMBINED W/HUMPHREYS (DOUGLAS) 9/81 CARRIED AS CANADIAN,SE (DOUGLA

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8 bbl$234
GasProduction3,828 Mcf$5,770
Total$6,005

1,821 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9279, -100.2271. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.92791, -100.22708 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,300 ft
1 wells filed one
Completion to plug
26.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,300 ft.

Completions filed
Nov 1980
1 of 1 wells
Plug dates filed
Feb 2007
1 of 1 wells

Last completion to plug: a median of 26.3 years across the 1 well that filed both dates, with the middle half between 26.3 years and 26.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2113126857,300 ftNov 1980Feb 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (170)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

170 months

Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 200005332.215.66$300
Oct 200005531.235.15$283
Sep 200008231.875.19$425
Aug 200004729.644.54$213
Jul 200007828.534.09$319
Jun 200085029.304.40$454
May 200006327.263.68$232
Apr 200008024.513.12$249
Mar 200007028.422.86$200
Feb 200008027.622.73$218
Jan 200001025.272.48$25
Dec 199903224.282.42$78
Nov 199901423.192.43$34
Oct 19990920.982.80$25
Sep 199901421.752.62$37
Aug 199903619.262.88$104
Jul 199903417.892.37$81
Jun 199901515.942.36$35
May 199902515.792.32$58
Apr 199905215.102.21$115
Mar 199904312.471.84$79
Feb 19990309.981.82$55
Jan 199905610.381.90$106
Dec 19980129.201.77$21
Nov 199804110.892.19$90
Oct 199802812.421.97$55
Sep 199805112.592.08$106
Aug 199803011.301.91$57
Jul 199803811.742.24$85
Jun 199804611.242.24$103
May 199805512.622.21$121
Apr 199805913.042.51$148
Mar 199804412.802.31$102
Feb 199806413.952.30$147
Jan 19980014.702.15$0
Dec 199703516.322.41$84
Nov 199702618.193.09$80
Oct 199702319.253.15$72
Sep 199701717.742.95$50
Aug 199702917.862.55$74
Jul 199703717.582.25$83
Jun 199705917.242.26$133
May 199705918.972.31$136
Apr 199705417.882.08$112
Mar 199705518.951.94$107
Feb 199707720.492.21$170
Jan 199704023.483.54$142
Dec 199604423.32$0
Nov 199605621.97$0
Oct 199605423.31$0
Sep 199605122.22$0
Aug 199605920.26$0
Jul 199606619.55$0
Jun 199608218.73$0
May 199602319.43$0
Apr 199608521.51$0
Mar 199602719.38$0
Feb 199607816.98$0
Jan 199605817.07$0
Dec 199501817.19$0
Nov 199504516.00$0
Oct 199508815.43$0
Sep 199502416.18$0
Aug 199502715.92$0
Jul 199501815.24$0
Jun 199501416.41$0
May 199503717.56$0
Apr 199502917.73$0
Mar 199501216.44$0
Feb 199503116.58$0
Jan 199504615.92$0
Dec 199402315.03$0
Nov 199401715.90$0
Oct 19940015.58$0
Sep 199402315.29$0
Aug 199402016.13$0
Jul 199403217.56$0
Jun 199403517.09$0
May 199406715.88$0
Apr 199403014.14$0
Mar 199401312.46$0
Feb 199407312.50$0
Jan 199401212.66$0
Dec 199303512.33$0
Nov 199303314.49$0
Oct 199302815.85$0
Sep 199304415.03$0
Aug 199303515.66$0
Jul 199304215.46$0
Jun 199303016.79$0
May 199302517.68$0
Apr 199303018.05$0
Mar 199302818.14$0
Feb 199302717.90$0
Jan 199304716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2000 — as filed, then multipliedworked
Condensate             0 bbl  × $ 32.21 =         $0
Gas                   53 Mcf  × $  5.66 =       $300

────────────────────────────────────────────────────
Month total                                     $300

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/96580 is the state's own key, not one this site invented.