KIRK, JAMES

Operated by PONDEROSA TX OPERATING LLC (P-5 670097) in the PANHANDLE HUTCHINSON COUNTY FLD. field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 1052District 10Field 68887001OilCasinghead gasSaveExport
Value, all time
$217 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 918 leases and 8,177 wells, and the rule below applies to all of them.

Discovered
1921-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
467 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1989-05-01.

The Commission's schedule remark for this field reads: SPECIAL TESTING REQUIREMENTS FOR WELLS WITH GOR GREATER THAN 5000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition3,090 bbl$205,733
Casinghead gasProduction3,170 Mcf$10,955
Total$216,688

20 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7062, -101.3553. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles. 1 well has no surveyed location and is left out of it.

35.70621, -101.35531 · centre of 1 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
2,972 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,972 ft.

Plug dates filed
Feb 1986
1 of 2 wells; 1 filed none

2 wells

42-2338255922,972 ftFeb 1986Yes
42-233825609

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190153.472.42$2
Sep 20190755.052.66$19
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190150.852.79$3
Jan 20190246.033.23$6
Dec 201801146.594.19$46
Nov 201801152.934.24$47
Oct 201801661.443.40$54
Sep 201801259.543.11$37
Aug 201801259.403.07$37
Jul 201801065.142.93$29
Jun 201801360.183.08$40
May 20180165.382.90$3
Apr 201801463.842.90$41
Mar 201801661.222.79$45
Feb 20180961.782.77$25
Jan 201802662.874.01$104
Dec 201703757.272.92$108
Nov 20170955.423.12$28
Oct 201701749.292.98$51
Sep 201703347.523.09$102
Aug 201703945.373.00$117
Jul 201701443.873.09$43
Jun 201704242.493.09$130
May 201702845.373.26$91
Apr 201703747.933.21$119
Mar 20171545046.772.98$7,352
Feb 201702050.452.95$59
Jan 201702849.413.42$96
Dec 20160048.763.72$0
Nov 20160942.492.64$24
Oct 201601446.193.09$43
Sep 201601641.553.10$50
Aug 201601741.442.92$50
Jul 20160941.622.92$26
Jun 201601245.352.69$32
May 20160342.521.99$6
Apr 201601036.561.99$20
Mar 201603833.011.79$68
Feb 201603126.472.06$64
Jan 20161592027.352.36$4,396
Dec 201504832.362.00$96
Nov 201504438.792.17$95
Oct 201503943.552.43$95
Sep 201505042.992.76$138
Aug 20151547040.162.87$6,386
Jul 201504348.152.95$127
Jun 201506356.152.88$182
May 201505555.212.96$163
Apr 201503649.822.71$97
Mar 201504242.892.93$123
Feb 201503844.662.98$113
Jan 20151584243.433.10$6,992
Dec 201403454.693.59$122
Nov 201403870.464.25$162
Oct 201404878.303.90$187
Sep 201403686.164.05$146
Aug 201403989.394.04$157
Jul 201404796.564.18$196
Jun 201405098.164.74$237
May 20141664094.734.73$15,914
Apr 201403695.944.81$173
Mar 201403095.895.06$152
Feb 201403697.406.19$223
Jan 201404490.404.86$214
Dec 201303391.824.35$144
Nov 201301188.853.74$41
Oct 2013165397.423.78$16,086
Sep 2013014104.113.72$52
Aug 201309104.253.52$32
Jul 201306102.523.72$22
Jun 20130594.403.93$20
May 201302694.834.15$108
Apr 2013160093.964.28$15,034
Mar 201303493.623.91$133
Feb 201304491.233.42$150
Jan 201303491.603.42$116
Dec 201201886.773.42$62
Nov 20121604486.953.62$14,072
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 201206092.662.91$174
Jul 20121674385.133.02$14,347
Jun 201203779.822.52$93
May 201203191.612.49$77
Apr 2012045101.652.00$90
Mar 2012045105.052.22$100
Feb 201216834101.102.57$17,072
Jan 201203798.092.73$101
Dec 201103896.873.24$123
Nov 201102595.723.31$83
Oct 201103984.983.65$142
Sep 201102483.623.99$96
Aug 2011170083.404.15$14,178
Jul 201102294.144.52$99
Jun 20110092.904.64$0
May 20110198.134.40$4
Apr 201100105.964.33$0
Mar 20111584596.364.06$15,407
Feb 201103285.644.18$134
Jan 201104886.504.59$220
Dec 201005085.734.35$217
Nov 201005480.843.80$205
Oct 201006178.103.51$214
Sep 20101735972.633.98$12,800
Aug 201005873.684.42$256
Jul 201001972.554.74$90
Jun 201004670.364.91$226
May 20101654971.124.24$11,942
Apr 201005981.694.12$243
Mar 201006278.394.39$272
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 2009160074.593.75$11,934
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 2009173054.743.93$9,470
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 2008162037.105.98$6,010
Nov 20080155.496.86$7
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200810110.3110.45$110
Mar 200810101.909.66$102
Feb 20081092.538.77$93
Jan 20081090.388.21$90
Dec 20071088.337.30$88
Nov 20071091.677.29$92
Oct 20071082.856.92$83
Sep 20071075.846.24$76
Aug 20071069.066.39$69
Jul 20071070.906.39$71
Jun 20071062.007.55$62
May 20071058.747.85$59
Apr 20071059.617.81$60
Mar 20071056.927.30$57
Feb 20071055.108.22$55
Jan 20071050.306.73$50
Dec 20061056.656.92$57
Nov 20061054.207.62$54
Oct 20061054.906.01$55
Sep 20061060.085.04$60
Aug 20061068.717.34$69
Jul 20061069.376.34$69
Jun 20061066.286.38$66
May 20061066.016.42$66
Apr 20061064.397.36$64
Mar 20061056.707.08$57
Feb 20061057.597.75$58
Jan 20061060.598.93$61
Dec 20051054.9413.42$55
Nov 20051054.6910.59$55
Oct 20051058.3413.80$58
Sep 20051061.4512.08$61
Aug 20051061.519.80$62
Jul 20051055.697.84$56
Jun 20051052.337.38$52
May 20051045.226.65$45
Apr 20051049.207.36$49
Mar 20051050.377.15$50
Feb 20051045.226.31$45
Jan 20051043.166.32$43
Dec 20041039.866.75$40
Nov 20041045.286.33$45
Oct 20041049.706.52$50
Sep 20041043.245.28$43
Aug 20041042.375.55$42
Jul 20041038.286.08$38
Jun 20041036.106.43$36
May 20041037.486.49$37
Apr 20041034.475.86$34
Mar 20041034.365.53$34
Feb 20041032.455.51$32
Jan 20041032.036.30$32
Dec 20031030.266.30$30
Nov 20031028.804.60$29
Oct 20031028.174.76$28
Sep 20031026.314.75$26
Aug 20031029.765.13$30
Jul 20031029.415.17$29
Jun 20031028.565.98$29
May 20031026.595.97$27
Apr 20031026.675.41$27
Mar 20031031.146.10$31
Feb 20031033.487.93$33
Jan 20031030.315.58$30
Dec 20021026.914.85$27
Nov 20021024.664.14$25
Oct 20021026.464.23$26
Sep 20021027.443.64$27
Aug 20021025.963.16$26
Jul 20021024.583.06$25
Jun 20021023.733.34$24
May 20021024.663.58$25
Apr 20021023.653.51$24
Mar 20021022.003.10$22
Feb 20021018.222.38$18
Jan 20021017.172.38$17
Dec 20011016.932.36$17
Nov 20011018.072.41$18
Oct 20011019.782.53$20
Sep 20011024.262.25$24
Aug 20011024.873.05$25
Jul 20011023.933.20$24
Jun 20011024.563.82$25
May 20011025.524.31$26
Apr 20011024.685.34$25
Mar 20011024.545.38$25
Feb 20011027.755.77$28
Jan 20011027.478.40$27
Dec 20001026.889.12$27
Nov 20001032.215.66$32
Oct 20001031.235.15$31
Sep 20001031.875.19$32
Aug 20001029.644.54$30
Jul 20001028.534.09$29
Jun 20001029.304.40$29
May 20001027.263.68$27
Apr 20001024.513.12$25
Mar 20001028.422.86$28
Feb 20001027.622.73$28
Jan 20001025.272.48$25
Dec 19991024.282.42$24
Nov 19991023.192.43$23
Oct 19991020.982.80$21
Sep 19991021.752.62$22
Aug 19991019.262.88$19
Jul 19991017.892.37$18
Jun 19991015.942.36$16
May 19991015.792.32$16
Apr 19991015.102.21$15
Mar 19991012.471.84$12
Feb 1999109.981.82$10
Jan 19991010.381.90$10
Dec 1998109.201.77$9
Nov 19981010.892.19$11
Oct 19982012.421.97$25
Sep 19981012.592.08$13
Aug 19981011.301.91$11
Jul 19981011.742.24$12
Jun 19981011.242.24$11
May 19981012.622.21$13
Apr 19981013.042.51$13
Mar 19981012.802.31$13
Feb 19981013.952.30$14
Jan 19984014.702.15$59
Dec 19974016.322.41$65
Nov 19974018.193.09$73
Oct 19974019.253.15$77
Sep 19974017.742.95$71
Aug 19974017.862.55$71
Jul 19974017.582.25$70
Jun 19974017.242.26$69
May 19974018.972.31$76
Apr 19974017.882.08$72
Mar 19974018.951.94$76
Feb 19974020.492.21$82
Jan 19974023.483.54$94
Dec 19964023.32$93
Nov 19964021.97$88
Oct 19963023.31$70
Sep 19963022.22$67
Aug 19964020.26$81
Jul 19965019.55$98
Jun 19963018.73$56
May 19963019.43$58
Apr 19963021.51$65
Mar 19963019.38$58
Feb 19963016.98$51
Jan 19963017.07$51
Dec 19953017.19$52
Nov 19954016.00$64
Oct 19952015.43$31
Sep 19953016.18$49
Aug 19953015.92$48
Jul 19952015.24$30
Jun 19952016.41$33
May 19953017.56$53
Apr 19953017.73$53
Mar 19953016.44$49
Feb 19953016.58$50
Jan 19955015.92$80
Dec 19944015.03$60
Nov 19943015.90$48
Oct 19942015.58$31
Sep 19944015.29$61
Aug 19943116.13$48
Jul 19942117.56$35
Jun 19943117.09$51
May 19942115.88$32
Apr 19942114.14$28
Mar 19942112.46$25
Feb 19942112.50$25
Jan 19942112.66$25
Dec 19933112.33$37
Nov 19932114.49$29
Oct 19932115.85$32
Sep 19932115.03$30
Aug 19933115.66$47
Jul 19932115.46$31
Jun 19933116.79$50
May 19933117.68$53
Apr 19936118.05$108
Mar 19934118.14$73
Feb 19932117.90$36
Jan 19932116.93$34

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2019 — as filed, then multipliedworked
Oil                    0 bbl  × $ 53.47 =         $0
Casinghead gas         1 Mcf  × $  2.42 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/1052 is the state's own key, not one this site invented.