BROWN-WARE

Operated by BCE-MACH III LLC (P-5 40209) in the PANHANDLE CARSON COUNTY FIELD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 179District 10Field 68845001OilCasinghead gasSaveExport
Value, all time
$4.0 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 580 leases and 3,796 wells, and the rule below applies to all of them.

Discovered
1921-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1989-05-01.

The Commission's schedule remark for this field reads: SPECIAL TESTING REQUIREMENTS FOR WELLS WITH GOR GREATER THAN 5000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition65,521 bbl$2,826,031
Casinghead gasProduction334,497 Mcf$1,219,678
Total$4,045,709

92,929 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (21)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6071, -101.2236. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.8 miles. 1 well has no surveyed location and is left out of it.

35.60482, -101.22297 · centre of 20 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
4.8%
1 of 21 wells
With a plug date
4.8%
1 of 21 wells
Median depth
3,175 ft
8 wells filed one
Completion to plug
45.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
14.8%
A plug date is filed
14.8%
BothOn the schedule and plugged. Neither fact cancels the other.
14.8%
NeitherNo plug date, and not on the schedule.
2095.2%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 8 of 21 wells. Median 3,175 ft, with the middle half between 3,139 and 3,200 ft; the shallowest is 3,075 ft and the deepest 3,333 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 8 of 21 wells, Oct 1976 – Dec 1981. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Oct 1976 – Dec 1981
8 of 21 wells; 13 filed none
Plug dates filed
Jul 2023
1 of 21 wells; 20 filed none

Last completion to plug: a median of 45.1 years across the 1 well that filed both dates, with the middle half between 45.1 years and 45.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

21 wells

42-065817701
42-065817712
42-065817723
42-065817734
42-065817745
42-065817756
42-065817767
42-0658177712
42-0658177822
42-06581779A 1
42-06581780A 2
42-06581781A 3
42-06581783A 5
42-06531078153,333 ftDec 1981
42-06530692143,125 ftJun 1979
42-06530652133,200 ftOct 1978
42-06530623113,143 ftJun 1978Jul 2023Yes
42-0653037993,200 ftJun 1977
42-06530380103,200 ftMay 1977
42-06502414A 43,075 ftApr 1977
42-0653035883,150 ftOct 1976

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 2018180059.403.07$10,692
Jul 20180065.142.93$0
Jun 201801,57960.183.08$4,858
May 201801,74465.382.90$5,059
Apr 2018081263.842.90$2,355
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20171098757.272.92$6,497
Nov 2017010055.423.12$312
Oct 2017014849.292.98$442
Sep 2017016047.523.09$494
Aug 201709245.373.00$276
Jul 201707343.873.09$225
Jun 2017011542.493.09$355
May 2017014545.373.26$473
Apr 20171269547.933.21$6,344
Mar 201708646.772.98$257
Feb 201702650.452.95$77
Jan 201704849.413.42$164
Dec 2016010248.763.72$380
Nov 2016016242.492.64$428
Oct 2016027646.193.09$853
Sep 2016035041.553.10$1,085
Aug 2016031141.442.92$909
Jul 2016032541.622.92$950
Jun 2016016245.352.69$435
May 2016027242.521.99$542
Apr 201614041436.561.99$5,943
Mar 2016031233.011.79$560
Feb 201611725626.472.06$3,625
Jan 2016029327.352.36$693
Dec 201515327432.362.00$5,499
Nov 2015038838.792.17$841
Oct 201515139343.552.43$7,530
Sep 20159066342.992.76$5,698
Aug 2015066940.162.87$1,922
Jul 201512764648.152.95$8,018
Jun 20158463356.152.88$6,541
May 2015060755.212.96$1,794
Apr 201515055349.822.71$8,970
Mar 201515589742.892.93$9,280
Feb 20158784444.662.98$6,397
Jan 2015072243.433.10$2,239
Dec 201415318254.693.59$9,021
Nov 201415330670.464.25$12,081
Oct 201415430078.303.90$13,228
Sep 201415175286.164.05$16,052
Aug 201412168989.394.04$13,596
Jul 2014075996.564.18$3,172
Jun 201415191798.164.74$19,166
May 201415292894.734.73$18,785
Apr 201414182095.944.81$17,471
Mar 201414893795.895.06$18,930
Feb 201415348897.406.19$17,924
Jan 201432249890.404.86$31,529
Dec 201311220991.824.35$11,194
Nov 2013047788.853.74$1,783
Oct 201316181897.423.78$18,776
Sep 2013157779104.113.72$19,241
Aug 2013131718104.253.52$16,186
Jul 2013160920102.523.72$19,824
Jun 201316478494.403.93$18,565
May 2013068994.834.15$2,859
Apr 201316067993.964.28$17,941
Mar 201318368593.623.91$19,813
Feb 201319757091.233.42$19,922
Jan 2013058991.603.42$2,014
Dec 201219472086.773.42$19,296
Nov 201219379086.953.62$19,645
Oct 201219685189.383.40$20,412
Sep 201219677594.672.92$20,817
Aug 201219695392.662.91$20,933
Jul 201219491985.133.02$19,291
Jun 201219494879.822.52$17,873
May 201219877191.612.49$20,057
Apr 2012194804101.652.00$21,326
Mar 2012195824105.052.22$22,316
Feb 2012193486101.102.57$20,761
Jan 201235655698.092.73$36,440
Dec 201116452896.873.24$17,597
Nov 201115377095.723.31$17,195
Oct 201115192184.983.65$16,192
Sep 201130596383.623.99$29,342
Aug 201115367683.404.15$15,565
Jul 2011061894.144.52$2,792
Jun 201130272492.904.64$31,415
May 20113111,35798.134.40$36,496
Apr 2011160941105.964.33$21,031
Mar 201132065096.364.06$33,472
Feb 201115130585.644.18$14,207
Jan 201114479086.504.59$16,081
Dec 20103101,06485.734.35$31,202
Nov 201030274680.843.80$27,245
Oct 201015376778.103.51$14,641
Sep 20101551,13972.633.98$15,790
Aug 20103011,25173.684.42$27,706
Jul 20104531,19672.554.74$38,530
Jun 201015493670.364.91$15,432
May 201029953371.124.24$23,522
Apr 20103071,00981.694.12$29,239
Mar 201034696278.394.39$31,345
Feb 201030465873.585.44$25,949
Jan 201030168374.365.96$26,456
Dec 200929539571.445.48$23,241
Nov 200915040974.593.75$12,723
Oct 20093171,29972.544.11$28,334
Sep 200929374765.543.06$21,493
Aug 200914719067.423.22$10,522
Jul 200930942761.133.46$20,369
Jun 200930775766.163.90$23,260
May 200930994854.743.93$20,636
Apr 200931074646.773.59$17,175
Mar 200930476142.144.06$15,899
Feb 200945760632.814.63$17,802
Jan 200947420335.865.37$18,088
Dec 200831220237.105.98$12,783
Nov 200829524855.496.86$18,071
Oct 20083061,22875.246.92$31,524
Sep 20082931,342101.767.88$40,387
Aug 20081381,846114.228.48$31,422
Jul 20081591,628131.0811.39$39,384
Jun 200801,758131.3313.03$22,911
May 20083161,783123.1711.57$59,559
Apr 20082991,523110.3110.45$48,905
Mar 20081421,539101.909.66$29,343
Feb 20083351,13992.538.77$40,987
Jan 200801,17790.388.21$9,658
Dec 20071531,13288.337.30$21,780
Nov 20073301,61491.677.29$42,020
Oct 20071652,01982.856.92$27,646
Sep 20071611,21675.846.24$19,803
Aug 20071631,43169.066.39$20,398
Jul 20071481,15170.906.39$17,846
Jun 20071651,17462.007.55$19,092
May 200701,25458.747.85$9,839
Apr 200732992059.617.81$26,792
Mar 20073031,46356.927.30$27,930
Feb 200730889355.108.22$24,308
Jan 200701,20050.306.73$8,072
Dec 20061551,26756.656.92$17,546
Nov 200601,38754.207.62$10,565
Oct 20063221,81354.906.01$28,581
Sep 20061611,86760.085.04$19,077
Aug 20061601,72068.717.34$23,618
Jul 20061711,88169.376.34$23,793
Jun 20063301,20166.286.38$29,539
May 20063201,42666.016.42$30,285
Apr 200631881364.397.36$26,460
Mar 200616370756.707.08$14,250
Feb 200620181457.597.75$17,885
Jan 20064911,24260.598.93$40,845
Dec 200501,13154.9413.42$15,173
Nov 20051641,63854.6910.59$26,313
Oct 20053252,06758.3413.80$47,476
Sep 20051602,65861.4512.08$41,938
Aug 20053512,78261.519.80$48,845
Jul 20053122,61555.697.84$37,886
Jun 20053632,08152.337.38$34,356
May 20051951,14945.226.65$16,460
Apr 20053311,42549.207.36$26,774
Mar 20055951,29550.377.15$39,236
Feb 20052861,06345.226.31$19,642
Jan 20051531,00443.166.32$12,951
Dec 200430382939.866.75$17,674
Nov 20043161,50945.286.33$23,861
Oct 20043101,47049.706.52$24,984
Sep 20043141,59243.245.28$21,989
Aug 20044891,97442.375.55$31,676
Jul 20043421,88038.286.08$24,530
Jun 20046221,96536.106.43$35,095
May 20044641,78537.486.49$28,984
Apr 20046371,84334.475.86$32,755
Mar 20043061,57634.365.53$19,230
Feb 20043251,34532.455.51$17,957
Jan 200401,31332.036.30$8,271
Dec 200330562530.266.30$13,168
Nov 200316180228.804.60$8,322
Oct 20034941,36428.174.76$20,408
Sep 200301,30826.314.75$6,212
Aug 200315697729.765.13$9,654
Jul 20031591,06529.415.17$10,183
Jun 20031571,11828.565.98$11,173
May 20033161,51926.595.97$17,475
Apr 200366279126.675.41$21,933
Mar 20031531,14231.146.10$11,726
Feb 200316887433.487.93$12,552
Jan 200332495730.315.58$15,162
Dec 200201,01526.914.85$4,927
Nov 200216276924.664.14$7,176
Oct 200216060726.464.23$6,801
Sep 2002064627.443.64$2,348
Aug 200216164025.963.16$6,205
Jul 2002058824.583.06$1,800
Jun 200215655323.733.34$5,548
May 200227232824.663.58$7,883
Apr 200210158523.653.51$4,443
Mar 2002038522.003.10$1,195
Feb 200231234018.222.38$6,492
Jan 2002028717.172.38$682
Dec 200133353516.932.36$6,903
Nov 2001046618.072.41$1,121
Oct 200131267919.782.53$7,888
Sep 2001073124.262.25$1,646
Aug 200130560524.873.05$9,433
Jul 2001066823.933.20$2,136
Jun 200116119824.563.82$4,711
May 200116072825.524.31$7,219
Apr 200115983024.685.34$8,352
Mar 200132882224.545.38$12,469
Feb 200132430127.755.77$10,727
Jan 2001023027.478.40$1,932
Dec 2000052626.889.12$4,798
Nov 200031091032.215.66$15,134
Oct 200032185731.235.15$14,435
Sep 20003751,19431.875.19$18,144
Aug 20003381,10029.644.54$15,013
Jul 20003341,20628.534.09$14,461
Jun 2000072529.304.40$3,188
May 20001691,16627.263.68$8,898
Apr 20003771,09424.513.12$12,649
Mar 20005021,17828.422.86$17,636
Feb 200015466127.622.73$6,056
Jan 200017292325.272.48$6,636
Dec 199934062724.282.42$9,775
Nov 199901,02423.192.43$2,492
Oct 199931290420.982.80$9,080
Sep 199917271421.752.62$5,611
Aug 199933784319.262.88$8,915
Jul 199934575917.892.37$7,973
Jun 1999089315.942.36$2,109
May 19993111,01415.792.32$7,264
Apr 199931678315.102.21$6,501
Mar 19995161,02912.471.84$8,326
Feb 19991599439.981.82$3,301
Jan 199948993110.381.90$6,845
Dec 19981597819.201.77$2,848
Nov 199816282610.892.19$3,570
Oct 19985011,85212.421.97$9,869
Sep 19981681,96212.592.08$6,201
Aug 1998068511.301.91$1,307
Jul 19983381,55011.742.24$7,436
Jun 199802,04611.242.24$4,577
May 19981692,65912.622.21$7,999
Apr 19983453,76113.042.51$13,921
Mar 1998070312.802.31$1,624
Feb 19982861,27213.952.30$6,914
Jan 19981341,76214.702.15$5,767
Dec 19971661,35416.322.41$5,974
Nov 1997082818.193.09$2,557
Oct 19971661,39319.253.15$7,583
Sep 19971612,24217.742.95$9,481
Aug 19971702,05617.862.55$8,289
Jul 19973331,82117.582.25$9,946
Jun 199701,68717.242.26$3,808
May 19973322,09618.972.31$11,137
Apr 199701,42817.882.08$2,974
Mar 199732113018.951.94$6,335
Feb 199701,16520.492.21$2,570
Jan 19972662,02123.483.54$13,399
Dec 19963232,07223.32$7,532
Nov 199602,20121.97$0
Oct 19961681,74723.31$3,916
Sep 19961602,18222.22$3,555
Aug 19961601,70020.26$3,242
Jul 19961532,80019.55$2,991
Jun 19962841,41418.73$5,319
May 19961731,44119.43$3,361
Apr 19961531,71321.51$3,291
Mar 19966181,26619.38$11,977
Feb 199601,28816.98$0
Jan 19963271,35017.07$5,582
Dec 19951641,98817.19$2,819
Nov 19953132,38916.00$5,008
Oct 19953063,11315.43$4,722
Sep 19951583,09216.18$2,556
Aug 19954673,44015.92$7,435
Jul 19953082,97115.24$4,694
Jun 19953293,13116.41$5,399
May 19955833,01117.56$10,237
Apr 19951482,47917.73$2,624
Mar 19953232,62916.44$5,310
Feb 19953112,64116.58$5,156
Jan 19953052,74815.92$4,856
Dec 19943122,70815.03$4,689
Nov 19944543,01315.90$7,219
Oct 19943173,85815.58$4,939
Sep 19943313,52115.29$5,061
Aug 19946322,78716.13$10,194
Jul 19943201,72017.56$5,619
Jun 19944821,20117.09$8,237
May 199433197615.88$5,256
Apr 199432372514.14$4,567
Mar 199448463012.46$6,031
Feb 199431582012.50$3,938
Jan 199432182612.66$4,064
Dec 19934731,09712.33$5,832
Nov 19934831,19814.49$6,999
Oct 19933231,56515.85$5,120
Sep 19934931,49115.03$7,410
Aug 19933211,76715.66$5,027
Jul 19934831,97715.46$7,467
Jun 19934861,71416.79$8,160
May 199349398517.68$8,716
Apr 19934861,13718.05$8,772
Mar 199348483618.14$8,780
Feb 19936421,01517.90$11,492
Jan 199347355616.93$8,008

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2018 — as filed, then multipliedworked
Oil                  180 bbl  × $ 59.40 =    $10,692
Casinghead gas         0 Mcf  × $  3.07 =         $0

────────────────────────────────────────────────────
Month total                                  $10,692

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/179 is the state's own key, not one this site invented.