Operated by EOG RESOURCES, INC. (P-5 253162) in the LIPSCOMB (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 4149District 10Field 53869270OilCasinghead gasSaveExport
Value, all time
$969 k
Jan 1993 – Oct 2014
Value, last 12 filed months
$0
at the published price for each month
Months reported
262
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,389 leases and 1,486 wells, and the rule below applies to all of them.

Discovered
1958-05-24
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-08-06.

The Commission's schedule remark for this field reads: FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition11,134 bbl$362,311
Casinghead gasProduction109,291 Mcf$606,296
Total$968,607

48 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2562, -100.1894. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.25621, -100.18941 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,838 ft
1 wells filed one
Completion to plug
36.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,838 ft.

Completions filed
Sep 1976
1 of 1 wells
Plug dates filed
Mar 2013
1 of 1 wells

Last completion to plug: a median of 36.5 years across the 1 well that filed both dates, with the middle half between 36.5 years and 36.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2953007419,838 ftSep 1976Mar 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (262)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

262 months

Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 201236079.822.52$2,874
May 20120091.612.49$0
Apr 20120281101.652.00$561
Mar 2012126697105.052.22$14,785
Feb 201219664101.102.57$3,628
Jan 2012073198.092.73$1,999
Dec 2011075596.873.24$2,446
Nov 2011071095.723.31$2,351
Oct 2011073384.983.65$2,674
Sep 2011066383.623.99$2,643
Aug 201119370583.404.15$19,021
Jul 2011079194.144.52$3,573
Jun 2011089992.904.64$4,171
May 2011095898.134.40$4,220
Apr 20110862105.964.33$3,735
Mar 2011050296.364.06$2,037
Feb 2011074285.644.18$3,102
Jan 2011033486.504.59$1,533
Dec 2010072285.734.35$3,139
Nov 2010067280.843.80$2,550
Oct 201018466978.103.51$16,718
Sep 2010066672.633.98$2,650
Aug 2010069673.684.42$3,076
Jul 2010068572.554.74$3,245
Jun 2010072870.364.91$3,575
May 2010074871.124.24$3,168
Apr 201018682081.694.12$18,575
Mar 2010083278.394.39$3,651
Feb 2010067973.585.44$3,695
Jan 2010080374.365.96$4,789
Dec 2009080671.445.48$4,420
Nov 2009080174.593.75$3,005
Oct 2009080972.544.11$3,325
Sep 2009074565.543.06$2,283
Aug 200919379467.423.22$15,568
Jul 2009082861.133.46$2,869
Jun 2009073666.163.90$2,867
May 2009078154.743.93$3,066
Apr 2009071646.773.59$2,569
Mar 2009081342.144.06$3,300
Feb 2009075532.814.63$3,498
Jan 200919084635.865.37$11,357
Dec 2008073337.105.98$4,381
Nov 2008079155.496.86$5,427
Oct 2008083575.246.92$5,780
Sep 20080872101.767.88$6,869
Aug 2008190699114.228.48$27,631
Jul 20080837131.0811.39$9,533
Jun 20080824131.3313.03$10,739
May 20080889123.1711.57$10,290
Apr 20080852110.3110.45$8,908
Mar 20080895101.909.66$8,649
Feb 200819278192.538.77$24,616
Jan 2008089990.388.21$7,377
Dec 2007089788.337.30$6,550
Nov 2007091991.677.29$6,701
Oct 200701,02682.856.92$7,102
Sep 2007078275.846.24$4,883
Aug 2007192069.066.39$13,260
Jul 2007076970.906.39$4,912
Jun 2007083362.007.55$6,288
May 2007081458.747.85$6,387
Apr 2007084659.617.81$6,603
Mar 2007096856.927.30$7,068
Feb 200719585655.108.22$17,777
Jan 2007071250.306.73$4,790
Dec 2006091856.656.92$6,351
Nov 2006082854.207.62$6,307
Oct 2006085854.906.01$5,160
Sep 200611781860.085.04$11,150
Aug 2006078868.717.34$5,784
Jul 2006075969.376.34$4,814
Jun 200618958166.286.38$16,236
May 2006055266.016.42$3,547
Apr 2006063864.397.36$4,696
Mar 2006026956.707.08$1,905
Feb 2006056557.597.75$4,379
Jan 2006081060.598.93$7,236
Dec 200519975654.9413.42$21,075
Nov 200501,03254.6910.59$10,927
Oct 200501,23158.3413.80$16,983
Sep 200519688161.4512.08$22,686
Aug 200501761.519.80$167
Jul 20050455.697.84$31
Jun 2005012352.337.38$908
May 20050045.226.65$0
Apr 20050649.207.36$44
Mar 20050050.377.15$0
Feb 20050645.226.31$38
Jan 2005035943.166.32$2,270
Dec 2004040439.866.75$2,727
Nov 2004048045.286.33$3,039
Oct 2004099749.706.52$6,496
Sep 2004059243.245.28$3,128
Aug 2004068442.375.55$3,797
Jul 20041861,05238.286.08$13,521
Jun 20041758936.106.43$4,403
May 200418899637.486.49$13,515
Apr 200401,04434.475.86$6,116
Mar 200401,17634.365.53$6,503
Feb 200401,24232.455.51$6,843
Jan 200401,32232.036.30$8,328
Dec 20031901,24630.266.30$13,601
Nov 2003093228.804.60$4,283
Oct 200301,11428.174.76$5,302
Sep 2003087326.314.75$4,146
Aug 20031831,26629.765.13$11,940
Jul 200301,38429.415.17$7,156
Jun 200301,21328.565.98$7,257
May 200301,24226.595.97$7,418
Apr 200319472226.675.41$9,078
Mar 200301,39831.146.10$8,522
Feb 200301,26633.487.93$10,034
Jan 20031871,18630.315.58$12,288
Dec 2002098026.914.85$4,757
Nov 200201,55624.664.14$6,437
Oct 200201,46026.464.23$6,175
Sep 20021891,47827.443.64$10,559
Aug 200201,46925.963.16$4,648
Jul 200201,16424.583.06$3,564
Jun 200201,37423.733.34$4,587
May 20021941,65724.663.58$10,723
Apr 200201,56523.653.51$5,497
Mar 200201,37022.003.10$4,251
Feb 200201,95018.222.38$4,633
Jan 20021981,68917.172.38$7,412
Dec 2001091716.932.36$2,168
Nov 2001090918.072.41$2,187
Oct 200119083219.782.53$5,862
Sep 2001090524.262.25$2,037
Aug 2001085024.873.05$2,595
Jul 2001093023.933.20$2,973
Jun 2001041024.563.82$1,568
May 2001191125.524.31$4,879
Apr 20010124.685.34$5
Mar 2001187124.545.38$4,594
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 2000195132.215.66$6,287
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 2000177128.534.09$5,054
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 2000178124.513.12$4,366
Mar 20000128.422.86$3
Feb 20000127.622.73$3
Jan 2000187125.272.48$4,728
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 19990120.982.80$3
Sep 19990121.752.62$3
Aug 1999173119.262.88$3,335
Jul 19990117.892.37$2
Jun 1999186115.942.36$2,967
May 199920115.792.32$318
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 199918619.981.82$1,858
Jan 19990110.381.90$2
Dec 19986119.201.77$563
Nov 1998189110.892.19$2,060
Oct 19980112.421.97$2
Sep 19980112.592.08$2
Aug 1998186111.301.91$2,104
Jul 19980111.742.24$2
Jun 19980111.242.24$2
May 1998180112.622.21$2,274
Apr 19980113.042.51$3
Mar 19980112.802.31$2
Feb 1998190113.952.30$2,653
Jan 1998202114.702.15$2,972
Dec 19970116.322.41$2
Nov 19970118.193.09$3
Oct 19970119.253.15$3
Sep 19970117.742.95$3
Aug 1997177117.862.55$3,164
Jul 19970117.582.25$2
Jun 19970117.242.26$2
May 19970118.972.31$2
Apr 1997187117.882.08$3,346
Mar 19970118.951.94$2
Feb 19970120.492.21$2
Jan 19970123.483.54$4
Dec 1996190123.32$4,431
Nov 19960121.97$0
Oct 1996183123.31$4,266
Sep 19960122.22$0
Aug 19960120.26$0
Jul 1996177119.55$3,460
Jun 19960118.73$0
May 19960119.43$0
Apr 1996187121.51$4,022
Mar 19960119.38$0
Feb 1996187116.98$3,175
Jan 19960117.07$0
Dec 19950117.19$0
Nov 1995185116.00$2,960
Oct 1995186115.43$2,870
Sep 19950116.18$0
Aug 19950115.92$0
Jul 19950115.24$0
Jun 1995182116.41$2,987
May 19950117.56$0
Apr 19950117.73$0
Mar 1995357116.44$5,869
Feb 19950116.58$0
Jan 19950115.92$0
Dec 19940115.03$0
Nov 19940115.90$0
Oct 19940115.58$0
Sep 1994354115.29$5,413
Aug 19940116.13$0
Jul 19940117.56$0
Jun 19940117.09$0
May 19940115.88$0
Apr 1994361114.14$5,105
Mar 19940112.46$0
Feb 19940112.50$0
Jan 19940112.66$0
Dec 19930112.33$0
Nov 19930114.49$0
Oct 1993179115.85$2,837
Sep 19930115.03$0
Aug 19930115.66$0
Jul 1993476115.46$7,359
Jun 19930116.79$0
May 19930117.68$0
Apr 19930118.05$0
Mar 1993365118.14$6,621
Feb 19930117.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2012 — as filed, then multipliedworked
Oil                   36 bbl  × $ 79.82 =     $2,874
Casinghead gas         0 Mcf  × $  2.52 =         $0

────────────────────────────────────────────────────
Month total                                   $2,874

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well