WILBANKS, HIX ESTATE 1-40

Operated by NEW ARCH ENERGY, LLC (P-5 100429) in the HANSFORD (MARMATON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 4253District 10Field 38797310Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$324 k
Jan 1993 – May 2026
Value, last 12 filed months
$25 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 34 leases and 70 wells, and the rule below applies to all of them.

Discovered
1958-12-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: GAS 8 X 6 /B/ ALLOWABLE

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,599 bbl$322,911
Casinghead gasProduction356 Mcf$1,336
Total$324,246

44 Mcf of this lease's gas, across 38 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2298, -101.1310. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.22983, -101.13100 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,300 ft.

Completions filed
Sep 1977
1 of 1 wells

1 well

42-1953058418,300 ftSep 1977

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20261441106.413.05$15,326
Apr 20260198.932.87$3
Mar 20260189.753.15$3
Feb 20260163.503.75$4
Jan 20260159.138.00$8
Dec 20250156.664.41$4
Nov 20250158.593.93$4
Oct 20250159.383.30$3
Sep 20250162.743.08$3
Aug 20250163.933.01$3
Jul 20250166.743.32$3
Jun 2025146166.483.13$9,709
May 20250160.553.23$3
Apr 20250162.363.54$4
Mar 20250167.704.27$4
Feb 20250170.884.34$4
Jan 20250174.324.28$4
Dec 20240168.993.12$3
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240169.612.36$2
Aug 20240175.632.06$2
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 2024143178.812.20$11,272
Apr 20240184.451.66$2
Mar 20240180.301.55$2
Feb 20240176.091.78$2
Jan 20240173.023.30$3
Dec 20230171.262.61$3
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 20230189.042.74$3
Aug 20230180.522.67$3
Jul 20230174.852.64$3
Jun 2023142168.962.26$9,795
May 20230170.622.23$2
Apr 20230178.122.24$2
Mar 20230172.852.39$2
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 20220185.005.65$6
Oct 20220187.185.86$6
Sep 20220184.888.16$8
Aug 20220194.529.13$9
Jul 202201101.587.54$8
Jun 20221511115.097.98$17,387
May 202201109.378.43$8
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 2021148170.783.98$10,479
Jun 20210169.493.38$3
May 20210163.483.02$3
Apr 20210160.362.76$3
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 2020161139.982.39$6,439
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200149.881.98$2
Jan 20200157.252.09$2
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 2019170156.272.46$9,568
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20190162.632.75$3
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 20180159.403.07$3
Jul 2018172165.142.93$11,207
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180162.874.01$4
Dec 20170157.272.92$3
Nov 20170155.423.12$3
Oct 20170149.292.98$3
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 2017172142.493.09$7,311
May 20170145.373.26$3
Apr 20170147.933.21$3
Mar 20170146.772.98$3
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 20160148.763.72$4
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 20160141.553.10$3
Aug 20160141.442.92$3
Jul 2016150141.622.92$6,246
Jun 20160145.352.69$3
May 20160142.521.99$2
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 20160126.472.06$2
Jan 20160127.352.36$2
Dec 20150132.362.00$2
Nov 20150138.792.17$2
Oct 20150143.552.43$2
Sep 2015158142.992.76$6,795
Aug 20150140.162.87$3
Jul 20150148.152.95$3
Jun 20150156.152.88$3
May 20150155.212.96$3
Apr 20150149.822.71$3
Mar 20150142.892.93$3
Feb 20150144.662.98$3
Jan 20150143.433.10$3
Dec 20140154.693.59$4
Nov 20140170.464.25$4
Oct 2014163178.303.90$12,767
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 20140196.564.18$4
Jun 20140198.164.74$5
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 20140195.895.06$5
Feb 20140197.406.19$6
Jan 20140190.404.86$5
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 2013185197.423.78$18,026
Sep 201300104.113.72$0
Aug 201301104.253.52$4
Jul 201301102.523.72$4
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 2012186194.672.92$17,612
Aug 20120192.662.91$3
Jul 20120185.133.02$3
Jun 20120179.822.52$3
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 20120198.092.73$3
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 20110184.983.65$4
Sep 2011179183.623.99$14,972
Aug 20110183.404.15$4
Jul 20110194.144.52$5
Jun 20110192.904.64$5
May 20110198.134.40$4
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 201044178.103.51$3,440
Sep 2010172172.633.98$12,496
Aug 20100173.684.42$4
Jul 20100072.554.74$0
Jun 20100170.364.91$5
May 20100071.124.24$0
Apr 20100181.694.12$4
Mar 20100178.394.39$4
Feb 20100173.585.44$5
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 20090174.593.75$4
Oct 20090172.544.11$4
Sep 2009134165.543.06$8,785
Aug 20090167.423.22$3
Jul 20090161.133.46$3
Jun 20090166.163.90$4
May 20090154.743.93$4
Apr 20090146.773.59$4
Mar 20090142.144.06$4
Feb 20090132.814.63$5
Jan 20090135.865.37$5
Dec 2008178137.105.98$6,610
Nov 20080155.496.86$7
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 200801114.228.48$8
Jul 200801131.0811.39$11
Jun 200801131.3313.03$13
May 200801123.1711.57$12
Apr 200801110.3110.45$10
Mar 200801101.909.66$10
Feb 2008129192.538.77$11,945
Jan 20080190.388.21$8
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 20070169.066.39$6
Jul 2007179170.906.39$12,697
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 2006153160.085.04$9,197
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 2006185160.598.93$11,218
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050149.207.36$7
Mar 2005167150.377.15$8,419
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 20040045.286.33$0
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 2004110136.106.43$3,977
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 20030130.266.30$6
Nov 2003129128.804.60$3,720
Oct 20030028.174.76$0
Sep 20030126.314.75$5
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 2003101126.595.97$2,692
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 2003109130.315.58$3,309
Dec 20020126.914.85$5
Nov 20020124.664.14$4
Oct 20020126.464.23$4
Sep 200280127.443.64$2,199
Aug 20020125.963.16$3
Jul 20020124.583.06$3
Jun 2002243123.733.34$5,770
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990121.752.62$3
Aug 19990119.262.88$3
Jul 1999167017.892.37$2,988
Jun 19990115.942.36$2
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 1999019.981.82$2
Jan 19990110.381.90$2
Dec 199813919.201.77$1,281
Nov 199814010.892.19$152
Oct 19980112.421.97$2
Sep 19980112.592.08$2
Aug 19980111.301.91$2
Jul 19980111.742.24$2
Jun 19980111.242.24$2
May 1998110112.622.21$1,390
Apr 19980113.042.51$3
Mar 19980112.802.31$2
Feb 19980113.952.30$2
Jan 19980114.702.15$2
Dec 1997136116.322.41$2,222
Nov 19970118.193.09$3
Oct 19970119.253.15$3
Sep 19970117.742.95$3
Aug 19970117.862.55$3
Jul 19970117.582.25$2
Jun 19970117.242.26$2
May 1997174018.972.31$3,301
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960223.32$0
Nov 19960121.97$0
Oct 1996241123.31$5,618
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960121.51$0
Mar 19960119.38$0
Feb 19960116.98$0
Jan 19960117.07$0
Dec 19950117.19$0
Nov 1995174116.00$2,784
Oct 19950115.43$0
Sep 19950016.18$0
Aug 19950115.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950217.56$0
Apr 19950117.73$0
Mar 1995172116.44$2,828
Feb 19950116.58$0
Jan 19950115.92$0
Dec 19940115.03$0
Nov 19940115.90$0
Oct 19940215.58$0
Sep 1994182115.29$2,783
Aug 19940116.13$0
Jul 19940117.56$0
Jun 19940117.09$0
May 19940115.88$0
Apr 19940114.14$0
Mar 19940112.46$0
Feb 1994182312.50$2,275
Jan 19940112.66$0
Dec 19930112.33$0
Nov 19930214.49$0
Oct 19930115.85$0
Sep 19930115.03$0
Aug 19930115.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 199343117.68$760
Apr 1993182118.05$3,285
Mar 19930118.14$0
Feb 19930117.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  144 bbl  × $106.41 =    $15,323
Casinghead gas         1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                  $15,326

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/4253 is the state's own key, not one this site invented.