JOHNSON

Operated by NATURAL GAS ANADARKO COMPANY (P-5 600750) in the PAN PETRO (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 5132District 10Field 68735120OilCasinghead gasSaveExport
Value, all time
$438 k
Jan 1993 – Jan 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
265
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 965 leases and 1,339 wells, and the rule below applies to all of them.

Discovered
1974-03-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-04-18.

The Commission's schedule remark for this field reads: PRORATION ACRES PLATS ARE REQUIRED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition9,833 bbl$421,674
Casinghead gasProduction6,074 Mcf$16,418
Total$438,093

2,270 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.1045, -100.8001. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.10450, -100.80008 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,200 ft
1 wells filed one
Completion to plug
32.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,200 ft.

Completions filed
Jul 1982
1 of 1 wells
Plug dates filed
Jul 2014
1 of 1 wells

Last completion to plug: a median of 32.0 years across the 1 well that filed both dates, with the middle half between 32.0 years and 32.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-35731250122010,200 ftJul 1982Jul 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (265)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

265 months

Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 20131510104.253.52$15,742
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 201301491.233.42$48
Jan 20131831691.603.42$16,818
Dec 20121851886.773.42$16,114
Nov 201201686.953.62$58
Oct 201201889.383.40$61
Sep 20121791694.672.92$16,993
Aug 201201692.662.91$47
Jul 20121791885.133.02$15,293
Jun 201201879.822.52$45
May 20121802291.612.49$16,545
Apr 2012018101.652.00$36
Mar 2012028105.052.22$62
Feb 201206101.102.57$15
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 2011181495.723.31$17,339
Oct 201101084.983.65$36
Sep 20111781283.623.99$14,932
Aug 20110683.404.15$25
Jul 20110894.144.52$36
Jun 201101092.904.64$46
May 201101698.134.40$70
Apr 2011014105.964.33$61
Mar 201101096.364.06$41
Feb 2011140485.644.18$12,006
Jan 20110286.504.59$9
Dec 20100885.734.35$35
Nov 201001080.843.80$38
Oct 20100278.103.51$7
Sep 20100272.633.98$8
Aug 20100273.684.42$9
Jul 20100272.554.74$9
Jun 20100670.364.91$29
May 201003071.124.24$127
Apr 2010180681.694.12$14,729
Mar 20100478.394.39$18
Feb 20100073.585.44$0
Jan 20100274.365.96$12
Dec 20090071.445.48$0
Nov 20090674.593.75$23
Oct 20090272.544.11$8
Sep 20090865.543.06$25
Aug 20090667.423.22$19
Jul 2009180061.133.46$11,003
Jun 20090866.163.90$31
May 20090654.743.93$24
Apr 20090646.773.59$22
Mar 20090642.144.06$24
Feb 20090632.814.63$28
Jan 2009175635.865.37$6,308
Dec 20080837.105.98$48
Nov 200801055.496.86$69
Oct 20080675.246.92$42
Sep 200818812101.767.88$19,225
Aug 200806114.228.48$51
Jul 2008010131.0811.39$114
Jun 2008014131.3313.03$182
May 2008012123.1711.57$139
Apr 200817816110.3110.45$19,802
Mar 2008010101.909.66$97
Feb 200801492.538.77$123
Jan 200801890.388.21$148
Dec 20070288.337.30$15
Nov 2007181891.677.29$16,651
Oct 200701682.856.92$111
Sep 200701475.846.24$87
Aug 200701869.066.39$115
Jul 200701670.906.39$102
Jun 20071836062.007.55$11,799
May 200701658.747.85$126
Apr 200701859.617.81$140
Mar 200701656.927.30$117
Feb 200701655.108.22$131
Jan 20071622850.306.73$8,337
Dec 20060656.656.92$42
Nov 20060454.207.62$30
Oct 200602054.906.01$120
Sep 200601260.085.04$60
Aug 200601468.717.34$103
Jul 20061791669.376.34$12,519
Jun 200602066.286.38$128
May 200602066.016.42$129
Apr 200602064.397.36$147
Mar 200601456.707.08$99
Feb 20061821257.597.75$10,574
Jan 200602060.598.93$179
Dec 200502054.9413.42$268
Nov 200501454.6910.59$148
Oct 200502258.3413.80$304
Sep 200501661.4512.08$193
Aug 20051752061.519.80$10,960
Jul 200501855.697.84$141
Jun 200501452.337.38$103
May 200501845.226.65$120
Apr 200502249.207.36$162
Mar 20051742450.377.15$8,936
Feb 200501645.226.31$101
Jan 200502043.166.32$126
Dec 200402639.866.75$176
Nov 20040445.286.33$25
Oct 20041781649.706.52$8,951
Sep 200401843.245.28$95
Aug 200402242.375.55$122
Jul 200402438.286.08$146
Jun 200402236.106.43$142
May 20041802037.486.49$6,876
Apr 200401634.475.86$94
Mar 200402234.365.53$122
Feb 200401432.455.51$77
Jan 200401832.036.30$113
Dec 20031862030.266.30$5,754
Nov 200301428.804.60$64
Oct 200301428.174.76$67
Sep 200301426.314.75$66
Aug 200301629.765.13$82
Jul 20031782229.415.17$5,349
Jun 200302428.565.98$144
May 200301626.595.97$96
Apr 200302026.675.41$108
Mar 200302231.146.10$134
Feb 20031832033.487.93$6,285
Jan 200302030.315.58$112
Dec 200201826.914.85$87
Nov 200201824.664.14$74
Oct 20021802026.464.23$4,847
Sep 200201427.443.64$51
Aug 200201625.963.16$51
Jul 200201624.583.06$49
Jun 200201623.733.34$53
May 20021811824.663.58$4,528
Apr 200202223.653.51$77
Mar 200202622.003.10$81
Feb 200202018.222.38$48
Jan 200201617.172.38$38
Dec 20011812216.932.36$3,116
Nov 200102018.072.41$48
Oct 200102419.782.53$61
Sep 200101624.262.25$36
Aug 200102424.873.05$73
Jul 20011741623.933.20$4,215
Jun 200102024.563.82$76
May 200101825.524.31$78
Apr 200102024.685.34$107
Mar 20011773024.545.38$4,505
Feb 200101827.755.77$104
Jan 200101827.478.40$151
Dec 20000626.889.12$55
Nov 200001432.215.66$79
Oct 20001782431.235.15$5,682
Sep 200002031.875.19$104
Aug 200001629.644.54$73
Jul 200002028.534.09$82
Jun 20001781629.304.40$5,286
May 200002427.263.68$88
Apr 200002824.513.12$87
Mar 200003028.422.86$86
Feb 200004427.622.73$120
Jan 20001814625.272.48$4,688
Dec 199904024.282.42$97
Nov 199901823.192.43$44
Oct 19990620.982.80$17
Sep 19991782821.752.62$3,945
Aug 199904819.262.88$138
Jul 199903017.892.37$71
Jun 199905015.942.36$118
May 199903015.792.32$70
Apr 19991803815.102.21$2,802
Mar 199905012.471.84$92
Feb 19990309.981.82$55
Jan 19991804210.381.90$1,948
Dec 19980269.201.77$46
Nov 199803410.892.19$74
Oct 199804012.421.97$79
Sep 199805012.592.08$104
Aug 19981754211.301.91$2,058
Jul 199805011.742.24$112
Jun 199803411.242.24$76
May 199805212.622.21$115
Apr 199804813.042.51$120
Mar 19981794212.802.31$2,388
Feb 199804013.952.30$92
Jan 199805414.702.15$116
Dec 19971793416.322.41$3,003
Nov 199705218.193.09$161
Oct 19970419.253.15$13
Sep 19970017.742.95$0
Aug 199704617.862.55$118
Jul 19971774817.582.25$3,220
Jun 199704617.242.26$104
May 199704618.972.31$106
Apr 199705817.882.08$121
Mar 19971865218.951.94$3,626
Feb 199704220.492.21$93
Jan 199703623.483.54$127
Dec 199604223.32$0
Nov 19961803821.97$3,955
Oct 199604623.31$0
Sep 199603822.22$0
Aug 199603420.26$0
Jul 19961744419.55$3,402
Jun 199604618.73$0
May 199605419.43$0
Apr 199603221.51$0
Mar 19961734619.38$3,353
Feb 199602816.98$0
Jan 199604217.07$0
Dec 199503017.19$0
Nov 19951803616.00$2,880
Oct 199504415.43$0
Sep 199504216.18$0
Aug 199504415.92$0
Jul 19951785015.24$2,713
Jun 199503216.41$0
May 199505417.56$0
Apr 199505017.73$0
Mar 19951784216.44$2,926
Feb 199504816.58$0
Jan 199505015.92$0
Dec 199405415.03$0
Nov 19941765615.90$2,798
Oct 199405215.58$0
Sep 199405015.29$0
Aug 199405616.13$0
Jul 19941735217.56$3,038
Jun 199405617.09$0
May 199405815.88$0
Apr 199405014.14$0
Mar 19941915212.46$2,380
Feb 199404812.50$0
Jan 199405612.66$0
Dec 199305612.33$0
Nov 19931884814.49$2,724
Oct 199304815.85$0
Sep 199305415.03$0
Aug 19931894815.66$2,960
Jul 199304215.46$0
Jun 199305616.79$0
May 199304217.68$0
Apr 19931965418.05$3,538
Mar 199305818.14$0
Feb 199305617.90$0
Jan 19931955616.93$3,301

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2013 — as filed, then multipliedworked
Oil                  151 bbl  × $104.25 =    $15,742
Casinghead gas         0 Mcf  × $  3.52 =         $0

────────────────────────────────────────────────────
Month total                                  $15,742

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/5132 is the state's own key, not one this site invented.