BART

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the PANHANDLE CARSON COUNTY FIELD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 5708District 10Field 68845001NGPA filingOilCasinghead gasSaveExport
Value, all time
$246 k
Jan 1993 – Sep 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
309
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 580 leases and 3,796 wells, and the rule below applies to all of them.

Discovered
1921-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1989-05-01.

The Commission's schedule remark for this field reads: SPECIAL TESTING REQUIREMENTS FOR WELLS WITH GOR GREATER THAN 5000.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,015 bbl$25,323
Casinghead gasProduction88,838 Mcf$221,168
Total$246,491

38,757 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.3534, -101.1297. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

35.35339, -101.12977 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
75.0%
3 of 4 wells
With a plug date
75.0%
3 of 4 wells
Median depth
3,392 ft
4 wells filed one
Completion to plug
12.8 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
375.0%
A plug date is filed
375.0%
BothOn the schedule and plugged. Neither fact cancels the other.
375.0%
NeitherNo plug date, and not on the schedule.
125.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 3,105 and 3,405 ft, median 3,392 ft, over the 4 wells that filed a depth.

Completions filed
Apr 1984 – Oct 2014
4 of 4 wells
Plug dates filed
Nov 1989 – Aug 2015
3 of 4 wells; 1 filed none

Last completion to plug: a median of 12.8 years across the 3 wells that filed both dates, with the middle half between 9.3 years and 22.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

4 wells

42-0653163843,405 ftOct 2014
42-0653163733,105 ftMay 1984Aug 2015Yes
42-0653164113,397 ftApr 1984Feb 1997Yes
42-0653164223,386 ftApr 1984Nov 1989Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (309)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

309 months

Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 201565042.992.76$2,794
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 201305991.233.42$202
Jan 2013013091.603.42$445
Dec 2012014486.773.42$493
Nov 2012011686.953.62$421
Oct 2012012389.383.40$418
Sep 2012013094.672.92$379
Aug 2012011792.662.91$340
Jul 2012010185.133.02$305
Jun 2012011679.822.52$292
May 2012010091.612.49$249
Apr 20120114101.652.00$228
Mar 20120131105.052.22$291
Feb 20120123101.102.57$316
Jan 2012014098.092.73$383
Dec 2011016396.873.24$528
Nov 2011013295.723.31$437
Oct 201108384.983.65$303
Sep 2011011383.623.99$450
Aug 2011010183.404.15$419
Jul 201109994.144.52$447
Jun 201109092.904.64$418
May 2011011498.134.40$502
Apr 2011063105.964.33$273
Mar 2011011596.364.06$467
Feb 2011031685.644.18$1,321
Jan 2011014886.504.59$679
Dec 2010015785.734.35$683
Nov 2010016780.843.80$634
Oct 2010012678.103.51$442
Sep 201009072.633.98$358
Aug 2010010873.684.42$477
Jul 201009872.554.74$464
Jun 2010012770.364.91$624
May 2010012771.124.24$538
Apr 2010011781.694.12$482
Mar 2010014778.394.39$645
Feb 2010013173.585.44$713
Jan 2010015474.365.96$918
Dec 2009011771.445.48$642
Nov 2009013974.593.75$521
Oct 2009016372.544.11$670
Sep 2009019365.543.06$592
Aug 2009018267.423.22$586
Jul 2009018161.133.46$627
Jun 2009012366.163.90$479
May 2009013254.743.93$518
Apr 2009011346.773.59$405
Mar 2009012542.144.06$507
Feb 2009011232.814.63$519
Jan 2009012935.865.37$693
Dec 2008017337.105.98$1,034
Nov 2008014655.496.86$1,002
Oct 2008013275.246.92$914
Sep 20080113101.767.88$890
Aug 20080152114.228.48$1,289
Jul 20080178131.0811.39$2,027
Jun 20080177131.3313.03$2,307
May 20080206123.1711.57$2,384
Apr 20080186110.3110.45$1,945
Mar 20080217101.909.66$2,097
Feb 2008020792.538.77$1,816
Jan 2008023790.388.21$1,945
Dec 2007024188.337.30$1,760
Nov 2007021291.677.29$1,546
Oct 2007018482.856.92$1,274
Sep 2007016675.846.24$1,037
Aug 2007015769.066.39$1,003
Jul 2007016070.906.39$1,022
Jun 2007016162.007.55$1,215
May 2007015058.747.85$1,177
Apr 2007018559.617.81$1,444
Mar 2007018656.927.30$1,358
Feb 2007016555.108.22$1,356
Jan 2007021250.306.73$1,426
Dec 2006023556.656.92$1,626
Nov 2006021454.207.62$1,630
Oct 2006019554.906.01$1,173
Sep 2006019560.085.04$982
Aug 2006021668.717.34$1,585
Jul 2006021569.376.34$1,364
Jun 2006022266.286.38$1,417
May 2006024966.016.42$1,600
Apr 2006022564.397.36$1,656
Mar 2006028756.707.08$2,033
Feb 2006026157.597.75$2,023
Jan 2006028360.598.93$2,528
Dec 2005027054.9413.42$3,622
Nov 2005020854.6910.59$2,202
Oct 2005026558.3413.80$3,656
Sep 2005024161.4512.08$2,911
Aug 2005024361.519.80$2,381
Jul 2005027055.697.84$2,118
Jun 2005026352.337.38$1,941
May 2005029745.226.65$1,975
Apr 2005026449.207.36$1,943
Mar 2005028850.377.15$2,061
Feb 2005022845.226.31$1,439
Jan 2005028143.166.32$1,777
Dec 2004027339.866.75$1,843
Nov 2004026445.286.33$1,671
Oct 2004028549.706.52$1,857
Sep 2004026543.245.28$1,400
Aug 200416127742.375.55$8,359
Jul 2004029138.286.08$1,771
Jun 2004028536.106.43$1,833
May 2004031237.486.49$2,026
Apr 2004026734.475.86$1,564
Mar 2004029434.365.53$1,626
Feb 2004026232.455.51$1,444
Jan 2004027832.036.30$1,751
Dec 2003030230.266.30$1,903
Nov 2003029728.804.60$1,365
Oct 2003031128.174.76$1,480
Sep 2003029526.314.75$1,401
Aug 2003029929.765.13$1,534
Jul 2003030329.415.17$1,567
Jun 2003029028.565.98$1,735
May 2003030326.595.97$1,810
Apr 2003027826.675.41$1,503
Mar 2003027831.146.10$1,695
Feb 2003025333.487.93$2,005
Jan 2003026730.315.58$1,490
Dec 2002028526.914.85$1,383
Nov 2002029024.664.14$1,200
Oct 2002028726.464.23$1,214
Sep 2002028427.443.64$1,032
Aug 2002031925.963.16$1,009
Jul 2002033224.583.06$1,017
Jun 2002028923.733.34$965
May 2002029724.663.58$1,064
Apr 2002029423.653.51$1,033
Mar 2002029022.003.10$900
Feb 2002027718.222.38$658
Jan 2002029117.172.38$691
Dec 2001029016.932.36$686
Nov 2001029518.072.41$710
Oct 2001033819.782.53$855
Sep 2001035724.262.25$804
Aug 2001036024.873.05$1,099
Jul 2001034623.933.20$1,106
Jun 200108124.563.82$310
May 20010025.524.31$0
Apr 200106124.685.34$325
Mar 2001016324.545.38$876
Feb 2001011327.755.77$652
Jan 2001015127.478.40$1,268
Dec 2000013926.889.12$1,268
Nov 2000017232.215.66$973
Oct 2000020131.235.15$1,034
Sep 200015519431.875.19$5,946
Aug 2000018229.644.54$826
Jul 2000021028.534.09$859
Jun 2000014229.304.40$624
May 2000022027.263.68$810
Apr 2000021424.513.12$667
Mar 2000024228.422.86$692
Feb 2000023227.622.73$633
Jan 2000023925.272.48$593
Dec 1999024924.282.42$604
Nov 1999015123.192.43$368
Oct 1999028320.982.80$793
Sep 1999026721.752.62$699
Aug 1999026119.262.88$751
Jul 1999028217.892.37$669
Jun 1999038315.942.36$905
May 1999043715.792.32$1,014
Apr 1999045115.102.21$996
Mar 1999027712.471.84$509
Feb 199903159.981.82$573
Jan 1999048510.381.90$921
Dec 19980479.201.77$83
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 1998029712.592.08$619
Aug 1998085211.301.91$1,625
Jul 1998084411.742.24$1,888
Jun 1998081511.242.24$1,823
May 1998087012.622.21$1,920
Apr 1998077513.042.51$1,942
Mar 1998088612.802.31$2,046
Feb 1998080013.952.30$1,839
Jan 1998056414.702.15$1,215
Dec 1997065916.322.41$1,589
Nov 1997073618.193.09$2,273
Oct 1997086919.253.15$2,737
Sep 199716483717.742.95$5,383
Aug 1997089017.862.55$2,274
Jul 1997088117.582.25$1,980
Jun 1997079317.242.26$1,790
May 1997062718.972.31$1,447
Apr 1997069017.882.08$1,437
Mar 1997053818.951.94$1,043
Feb 19970620.492.21$13
Jan 19970123.483.54$4
Dec 19960123.32$0
Nov 19960121.97$0
Oct 19960123.31$0
Sep 19960122.22$0
Aug 19960120.26$0
Jul 1996062619.55$0
Jun 1996089318.73$0
May 1996080819.43$0
Apr 1996076621.51$0
Mar 1996078119.38$0
Feb 1996076716.98$0
Jan 1996090317.07$0
Dec 1995097517.19$0
Nov 1995092516.00$0
Oct 1995095215.43$0
Sep 199515494016.18$2,492
Aug 1995090915.92$0
Jul 1995087815.24$0
Jun 1995090416.41$0
May 1995098217.56$0
Apr 1995098817.73$0
Mar 199501,08316.44$0
Feb 1995094616.58$0
Jan 199501,08815.92$0
Dec 199401,12215.03$0
Nov 199401,10315.90$0
Oct 1994089215.58$0
Sep 199401,06015.29$0
Aug 199401,11516.13$0
Jul 199409117.56$0
Jun 199401,01117.09$0
May 199416294215.88$2,573
Apr 199401,00214.14$0
Mar 1994079312.46$0
Feb 1994089112.50$0
Jan 1994080612.66$0
Dec 199301,09712.33$0
Nov 199301,14214.49$0
Oct 199301,13915.85$0
Sep 199301,07315.03$0
Aug 199301,05715.66$0
Jul 1993075115.46$0
Jun 1993018616.79$0
May 1993034417.68$0
Apr 1993097118.05$0
Mar 19931541,03818.14$2,794
Feb 1993094717.90$0
Jan 199301,06516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2015 — as filed, then multipliedworked
Oil                   65 bbl  × $ 42.99 =     $2,794
Casinghead gas         0 Mcf  × $  2.76 =         $0

────────────────────────────────────────────────────
Month total                                   $2,794

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/5708 is the state's own key, not one this site invented.