MORRISON

Operated by LINN OPERATING, INC. (P-5 501545) in the FRYE RANCH (GRANITE WASH -A-) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6630District 10Field 33151300OilCasinghead gasSaveExport
Value, all time
$1.4 M
Jan 1993 – Aug 2013
Value, last 12 filed months
$0
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 27 leases and 36 wells, and the rule below applies to all of them.

Discovered
1986-05-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1989-06-01.

The Commission's schedule remark for this field reads: EFF 10-9-2007

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition16,058 bbl$817,268
Casinghead gasProduction120,165 Mcf$600,036
Total$1,417,305

17,847 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5007, -100.1416. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

35.50075, -100.14162 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
12,500 ft
2 wells filed one
Completion to plug
6.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 12,400 and 12,600 ft, median 12,500 ft, over the 2 wells that filed a depth.

Completions filed
May 2006 – Jun 2007
2 of 2 wells
Plug dates filed
Apr 2014
1 of 2 wells; 1 filed none

Last completion to plug: a median of 6.8 years across the 1 well that filed both dates, with the middle half between 6.8 years and 6.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-48331393103312,400 ftJun 2007Apr 2014Yes
42-48332085212,600 ftMay 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20071961,23182.856.92$24,760
Sep 20073851,83675.846.24$40,663
Aug 20073923,34269.066.39$48,420
Jul 20077802,41770.906.39$70,742
Jun 20077802,34262.007.55$66,038
May 20071,6564,33858.747.85$131,311
Apr 200739331659.617.81$25,893
Mar 20071965056.927.30$11,521
Feb 20071573755.108.22$8,955
Jan 20075946,08350.306.73$70,798
Dec 20065986,07856.656.92$75,927
Nov 20067815,79554.207.62$86,474
Oct 20067697,22954.906.01$85,692
Sep 20067569,35560.085.04$92,543
Aug 20061,30410,85968.717.34$169,302
Jul 20061,48013,72369.376.34$189,709
Jun 200602366.286.38$147
May 2006012466.016.42$797
Apr 20061762564.397.36$11,517
Mar 200604756.707.08$333
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 2005180045.226.65$8,140
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 2004186045.286.33$8,422
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 200402142.375.55$117
Jul 200404438.286.08$268
Jun 2004176236.106.43$1,013
May 200407037.486.49$455
Apr 200407434.475.86$434
Mar 2004024534.365.53$1,355
Feb 2004028832.455.51$1,587
Jan 200418620932.036.30$7,274
Dec 2003033030.266.30$2,080
Nov 2003043428.804.60$1,994
Oct 2003067028.174.76$3,189
Sep 200318217026.314.75$5,596
Aug 2003041229.765.13$2,113
Jul 2003032729.415.17$1,691
Jun 2003024628.565.98$1,472
May 2003021726.595.97$1,296
Apr 2003027526.675.41$1,487
Mar 200316637831.146.10$7,474
Feb 2003045933.487.93$3,638
Jan 2003055030.315.58$3,070
Dec 2002044126.914.85$2,141
Nov 2002011524.664.14$476
Oct 200206426.464.23$271
Sep 2002020627.443.64$749
Aug 2002021125.963.16$668
Jul 200218348624.583.06$5,986
Jun 2002026723.733.34$891
May 2002096024.663.58$3,441
Apr 2002014923.653.51$523
Mar 20029219422.003.10$2,626
Feb 2002028618.222.38$679
Jan 2002058817.172.38$1,397
Dec 2001029116.932.36$688
Nov 2001050518.072.41$1,215
Oct 2001081819.782.53$2,069
Sep 200118421024.262.25$4,937
Aug 2001060524.873.05$1,847
Jul 2001043523.933.20$1,391
Jun 2001029424.563.82$1,124
May 2001027725.524.31$1,193
Apr 200116824124.685.34$5,432
Mar 2001014424.545.38$774
Feb 2001072027.755.77$4,152
Jan 200115748427.478.40$8,378
Dec 2000045726.889.12$4,169
Nov 2000044332.215.66$2,506
Oct 2000041131.235.15$2,115
Sep 20000131.875.19$5
Aug 2000063629.644.54$2,888
Jul 20000128.534.09$4
Jun 2000177129.304.40$5,191
May 2000027527.263.68$1,012
Apr 2000047824.513.12$1,489
Mar 2000030928.422.86$884
Feb 2000033827.622.73$922
Jan 20000125.272.48$2
Dec 1999035524.282.42$860
Nov 1999023823.192.43$579
Oct 1999026220.982.80$735
Sep 1999045721.752.62$1,197
Aug 1999022619.262.88$650
Jul 19990117.892.37$2
Jun 1999172115.942.36$2,744
May 1999030515.792.32$708
Apr 199901,94915.102.21$4,303
Mar 199906112.471.84$112
Feb 1999193949.981.82$2,097
Jan 1999023510.381.90$446
Dec 19980499.201.77$87
Nov 199806410.892.19$140
Oct 1998017612.421.97$347
Sep 1998036212.592.08$754
Aug 199807511.301.91$143
Jul 1998013811.742.24$309
Jun 1998010711.242.24$239
May 1998033012.622.21$728
Apr 199807513.042.51$188
Mar 19981489312.802.31$2,109
Feb 1998014813.952.30$340
Jan 1998020214.702.15$435
Dec 19975916916.322.41$1,370
Nov 199717113918.193.09$3,540
Oct 1997017019.253.15$535
Sep 19970117.742.95$3
Aug 19970117.862.55$3
Jul 1997062417.582.25$1,402
Jun 1997048117.242.26$1,086
May 1997012918.972.31$298
Apr 1997051017.882.08$1,062
Mar 199710326918.951.94$2,473
Feb 1997020120.492.21$443
Jan 1997054823.483.54$1,940
Dec 1996018723.32$0
Nov 1996044021.97$0
Oct 199612086323.31$2,797
Sep 199601,06522.22$0
Aug 1996095920.26$0
Jul 1996891,10519.55$1,740
Jun 19969777718.73$1,817
May 1996075419.43$0
Apr 1996062321.51$0
Mar 199616817819.38$3,256
Feb 1996081816.98$0
Jan 19960117.07$0
Dec 1995088317.19$0
Nov 1995020716.00$0
Oct 199515551715.43$2,392
Sep 1995039516.18$0
Aug 1995017815.92$0
Jul 199533427915.24$5,090
Jun 1995021316.41$0
May 1995013817.56$0
Apr 1995013417.73$0
Mar 199509916.44$0
Feb 199519811216.58$3,283
Jan 1995018415.92$0
Dec 199408515.03$0
Nov 199419219215.90$3,053
Oct 1994019215.58$0
Sep 1994016715.29$0
Aug 199403016.13$0
Jul 199401617.56$0
Jun 199401917.09$0
May 19940415.88$0
Apr 19941512114.14$2,135
Mar 199446112.46$573
Feb 1994013212.50$0
Jan 19940312.66$0
Dec 19930112.33$0
Nov 199302614.49$0
Oct 199302815.85$0
Sep 1993014415.03$0
Aug 1993024915.66$0
Jul 1993029115.46$0
Jun 199319913516.79$3,341
May 1993029117.68$0
Apr 1993044218.05$0
Mar 199319251518.14$3,483
Feb 199301,40117.90$0
Jan 199302,35316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2007 — as filed, then multipliedworked
Oil                  196 bbl  × $ 82.85 =    $16,239
Casinghead gas     1,231 Mcf  × $  6.92 =     $8,521

────────────────────────────────────────────────────
Month total                                  $24,760

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/6630 is the state's own key, not one this site invented.