FRYE "C"

Operated by DOMINION OKLAHOMA TEXAS E&P, INC (P-5 222282) in the FRYE RANCH (GRANITE WASH -A-) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6702District 10Field 33151300OilCasinghead gasSaveExport
Value, all time
$617 k
Jan 1993 – Dec 2013
Value, last 12 filed months
$0
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 27 leases and 36 wells, and the rule below applies to all of them.

Discovered
1986-05-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1989-06-01.

The Commission's schedule remark for this field reads: EFF 10-9-2007

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition10,414 bbl$262,826
Casinghead gasProduction130,476 Mcf$354,625
Total$617,452

51,242 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5292, -100.1176. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.52921, -100.11763 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,518 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,518 ft.

Completions filed
Jul 2006
1 of 1 wells

1 well

42-48331412112,518 ftJul 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20068054.207.62$434
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 2006182069.376.34$12,625
Jun 2006082766.286.38$5,279
May 200618392266.016.42$18,004
Apr 2006075664.397.36$5,565
Mar 2006065356.707.08$4,625
Feb 200618462257.597.75$15,418
Jan 2006057260.598.93$5,110
Dec 2005056754.9413.42$7,607
Nov 2005046654.6910.59$4,934
Oct 2005071858.3413.80$9,905
Sep 200518277661.4512.08$20,557
Aug 2005073161.519.80$7,161
Jul 2005059355.697.84$4,651
Jun 200517270652.337.38$14,212
May 2005064245.226.65$4,270
Apr 2005058149.207.36$4,276
Mar 200519066550.377.15$14,328
Feb 2005057845.226.31$3,648
Jan 2005059643.166.32$3,768
Dec 200417754039.866.75$10,701
Nov 2004060645.286.33$3,836
Oct 2004059449.706.52$3,870
Sep 2004057843.245.28$3,054
Aug 200437061342.375.55$19,079
Jul 200401,17438.286.08$7,143
Jun 200412592636.106.43$10,469
May 2004062037.486.49$4,027
Apr 2004079734.475.86$4,669
Mar 2004077134.365.53$4,264
Feb 2004016432.455.51$904
Jan 20041721,06532.036.30$12,218
Dec 2003064230.266.30$4,046
Nov 2003059028.804.60$2,711
Oct 200315861928.174.76$7,397
Sep 2003053126.314.75$2,522
Aug 2003062429.765.13$3,201
Jul 2003070929.415.17$3,666
Jun 200318660628.565.98$8,938
May 2003046526.595.97$2,777
Apr 2003065726.675.41$3,553
Mar 200319263531.146.10$9,850
Feb 2003069033.487.93$5,469
Jan 2003055530.315.58$3,098
Dec 2002062626.914.85$3,038
Nov 200218653924.664.14$6,817
Oct 2002039526.464.23$1,671
Sep 2002050027.443.64$1,818
Aug 2002053425.963.16$1,690
Jul 2002026524.583.06$811
Jun 200214931723.733.34$4,594
May 2002065024.663.58$2,330
Apr 2002061523.653.51$2,160
Mar 200219071622.003.10$6,402
Feb 2002071818.222.38$1,706
Jan 200218579117.172.38$5,056
Dec 2001077316.932.36$1,828
Nov 2001070318.072.41$1,691
Oct 2001082919.782.53$2,096
Sep 200118475824.262.25$6,170
Aug 2001064824.873.05$1,978
Jul 2001053423.933.20$1,707
Jun 2001065024.563.82$2,486
May 200118168025.524.31$7,548
Apr 2001087724.685.34$4,679
Mar 2001077124.545.38$4,145
Feb 200118772227.755.77$9,353
Jan 2001065827.478.40$5,526
Dec 2000090226.889.12$8,229
Nov 2000062432.215.66$3,531
Oct 200016362631.235.15$8,312
Sep 2000072331.875.19$3,750
Aug 200018361229.644.54$8,203
Jul 2000064828.534.09$2,650
Jun 2000079229.304.40$3,483
May 200018675327.263.68$7,841
Apr 2000066624.513.12$2,075
Mar 2000079628.422.86$2,276
Feb 200019083727.622.73$7,530
Jan 2000084225.272.48$2,089
Dec 1999080724.282.42$1,956
Nov 1999051323.192.43$1,249
Oct 1999090020.982.80$2,523
Sep 199919280721.752.62$6,289
Aug 1999076419.262.88$2,197
Jul 199918669617.892.37$4,979
Jun 1999088515.942.36$2,090
May 1999089015.792.32$2,066
Apr 199941270715.102.21$7,782
Mar 1999089612.471.84$1,647
Feb 199907369.981.82$1,338
Jan 199919573110.381.90$3,413
Dec 199807949.201.77$1,408
Nov 1998071410.892.19$1,561
Oct 199819779712.421.97$4,016
Sep 1998066812.592.08$1,391
Aug 1998087511.301.91$1,669
Jul 199801,09511.742.24$2,450
Jun 1998092411.242.24$2,067
May 199801,06912.622.21$2,359
Apr 1998095313.042.51$2,388
Mar 1998098812.802.31$2,282
Feb 1998085313.952.30$1,961
Jan 1998066514.702.15$1,433
Dec 1997042416.322.41$1,022
Nov 199713763718.193.09$4,459
Oct 1997058719.253.15$1,849
Sep 1997075217.742.95$2,222
Aug 1997082617.862.55$2,110
Jul 199714154317.582.25$3,699
Jun 1997044017.242.26$993
May 1997064018.972.31$1,477
Apr 1997058817.882.08$1,225
Mar 1997066318.951.94$1,286
Feb 1997088220.492.21$1,946
Jan 1997069323.483.54$2,453
Dec 1996064623.32$0
Nov 19968258921.97$1,802
Oct 199601,03723.31$0
Sep 19962551,07322.22$5,666
Aug 199601,25020.26$0
Jul 19961981,49019.55$3,871
Jun 199601,46618.73$0
May 199601,31119.43$0
Apr 19961981,42221.51$4,259
Mar 1996062619.38$0
Feb 199601,25016.98$0
Jan 19961941,13117.07$3,312
Dec 199501,37217.19$0
Nov 199501,55816.00$0
Oct 19951881,61315.43$2,901
Sep 199501,51916.18$0
Aug 19954565215.92$716
Jul 1995018815.24$0
Jun 199539356916.41$6,449
May 1995086817.56$0
Apr 1995094117.73$0
Mar 199519480816.44$3,189
Feb 199501,22716.58$0
Jan 1995095615.92$0
Dec 19941961,26315.03$2,946
Nov 199419374115.90$3,069
Oct 199419266915.58$2,991
Sep 1994043715.29$0
Aug 1994047516.13$0
Jul 199419089617.56$3,336
Jun 1994084017.09$0
May 1994086315.88$0
Apr 199439991514.14$5,642
Mar 1994084112.46$0
Feb 1994089412.50$0
Jan 19943811,04612.66$4,823
Dec 199301,07812.33$0
Nov 1993098714.49$0
Oct 1993063815.85$0
Sep 19931951,00615.03$2,931
Aug 19931941,53115.66$3,038
Jul 199303,47315.46$0
Jun 199302,61016.79$0
May 199319985517.68$3,518
Apr 19932031,28818.05$3,664
Mar 199302818.14$0
Feb 19932001,13417.90$3,580
Jan 19932001,17216.93$3,386

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2006 — as filed, then multipliedworked
Oil                    8 bbl  × $ 54.20 =       $434
Casinghead gas         0 Mcf  × $  7.62 =         $0

────────────────────────────────────────────────────
Month total                                     $434

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well