FRYE "D"

Operated by DOMINION OKLAHOMA TEXAS E&P, INC (P-5 222282) in the FRYE RANCH (GRANITE WASH -A-) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6713District 10Field 33151300OilCasinghead gasSaveExport
Value, all time
$723 k
Jan 1993 – Dec 2013
Value, last 12 filed months
$0
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 27 leases and 36 wells, and the rule below applies to all of them.

Discovered
1986-05-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1989-06-01.

The Commission's schedule remark for this field reads: EFF 10-9-2007

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition18,131 bbl$408,650
Casinghead gasProduction127,138 Mcf$314,263
Total$722,913

48,860 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5212, -100.1266. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.52124, -100.12657 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
12,500 ft
1 wells filed one
Completion to plug
9.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,500 ft.

Completions filed
Jul 2006
1 of 1 wells
Plug dates filed
Aug 2015
1 of 1 wells

Last completion to plug: a median of 9.1 years across the 1 well that filed both dates, with the middle half between 9.1 years and 9.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-48331415112,500 ftJul 2006Aug 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 2006146054.906.01$8,015
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 2006027066.286.38$1,724
May 200617632066.016.42$13,674
Apr 2006033764.397.36$2,480
Mar 2006038256.707.08$2,706
Feb 2006032257.597.75$2,496
Jan 200618832560.598.93$14,294
Dec 2005036454.9413.42$4,883
Nov 200518232754.6910.59$13,416
Oct 2005040858.3413.80$5,629
Sep 2005054961.4512.08$6,631
Aug 200518254561.519.80$16,534
Jul 2005050255.697.84$3,938
Jun 200519251052.337.38$13,812
May 2005047245.226.65$3,139
Apr 2005045649.207.36$3,356
Mar 200518851350.377.15$13,140
Feb 2005042045.226.31$2,651
Jan 200518744643.166.32$10,891
Dec 2004038839.866.75$2,619
Nov 200419444445.286.33$11,595
Oct 200418549549.706.52$12,419
Sep 2004028043.245.28$1,479
Aug 2004011242.375.55$622
Jul 2004041038.286.08$2,495
Jun 20042564936.106.43$5,078
May 2004026337.486.49$1,708
Apr 200415824834.475.86$6,899
Mar 2004023934.365.53$1,322
Feb 2004027032.455.51$1,488
Jan 200418048232.036.30$8,802
Dec 2003020630.266.30$1,298
Nov 2003027528.804.60$1,264
Oct 2003017628.174.76$838
Sep 200318254226.314.75$7,363
Aug 2003046329.765.13$2,375
Jul 2003039029.415.17$2,017
Jun 200318484728.565.98$10,323
May 200318428826.595.97$6,613
Apr 2003058926.675.41$3,185
Mar 2003087531.146.10$5,334
Feb 2003029933.487.93$2,370
Jan 200318465530.315.58$9,233
Dec 200201,01226.914.85$4,912
Nov 2002041924.664.14$1,733
Oct 200219264026.464.23$7,787
Sep 2002072227.443.64$2,625
Aug 2002075325.963.16$2,383
Jul 200219467224.583.06$6,826
Jun 2002086323.733.34$2,881
May 2002069424.663.58$2,487
Apr 200218746223.653.51$6,045
Mar 2002086522.003.10$2,684
Feb 200218476718.222.38$5,175
Jan 2002089117.172.38$2,117
Dec 2001067816.932.36$1,603
Nov 2001058918.072.41$1,417
Oct 200119195319.782.53$6,188
Sep 200101,02124.262.25$2,299
Aug 2001076524.873.05$2,336
Jul 20011771,02523.933.20$7,513
Jun 2001087824.563.82$3,358
May 200118472425.524.31$7,814
Apr 2001072124.685.34$3,847
Mar 20011861,07524.545.38$10,344
Feb 200101,09627.755.77$6,321
Jan 200118883027.478.40$12,135
Dec 200001,01826.889.12$9,287
Nov 20001891,21232.215.66$12,945
Oct 2000071331.235.15$3,669
Sep 2000049031.875.19$2,541
Aug 200018550529.644.54$7,776
Jul 200001,03428.534.09$4,229
Jun 20001771,08929.304.40$9,975
May 200001,15827.263.68$4,261
Apr 200018497224.513.12$7,539
Mar 2000095928.422.86$2,743
Feb 2000092327.622.73$2,517
Jan 200018293525.272.48$6,918
Dec 199918793724.282.42$6,811
Nov 1999097823.192.43$2,380
Oct 199915366320.982.80$5,069
Sep 199919460121.752.62$5,793
Aug 199919173019.262.88$5,778
Jul 1999047317.892.37$1,122
Jun 199923366315.942.36$5,280
May 1999048615.792.32$1,128
Apr 199919366315.102.21$4,378
Mar 199916776812.471.84$3,494
Feb 199907849.981.82$1,425
Jan 1999082610.381.90$1,569
Dec 199809939.201.77$1,761
Nov 199819897510.892.19$4,287
Oct 19981911,05112.421.97$4,442
Sep 19981961,08212.592.08$4,721
Aug 199801,85411.301.91$3,536
Jul 19981901,14311.742.24$4,788
Jun 199801,53911.242.24$3,443
May 19981971,10712.622.21$4,929
Apr 19981841,62513.042.51$6,471
Mar 1998064912.802.31$1,499
Feb 199819882013.952.30$4,647
Jan 1998046414.702.15$1,000
Dec 1997054016.322.41$1,302
Nov 199712161018.193.09$4,085
Oct 199712567219.253.15$4,523
Sep 199716986117.742.95$5,542
Aug 1997092417.862.55$2,361
Jul 199720064917.582.25$4,974
Jun 1997072717.242.26$1,641
May 199719971518.972.31$5,426
Apr 1997079817.882.08$1,662
Mar 199716989418.951.94$4,936
Feb 199720784820.492.21$6,112
Jan 1997069023.483.54$2,442
Dec 199619399123.32$4,501
Nov 199615381621.97$3,361
Oct 199616192223.31$3,753
Sep 199618799122.22$4,155
Aug 19961951,02320.26$3,951
Jul 19961931,22619.55$3,773
Jun 19961401,24018.73$2,622
May 1996094119.43$0
Apr 199619793121.51$4,237
Mar 19961951,00019.38$3,779
Feb 1996086616.98$0
Jan 199640397617.07$6,879
Dec 199519093617.19$3,266
Nov 1995098816.00$0
Oct 199518392215.43$2,824
Sep 1995060816.18$0
Aug 199538490415.92$6,113
Jul 199510971615.24$1,661
Jun 1995094316.41$0
May 19953741,01817.56$6,567
Apr 199519983817.73$3,528
Mar 1995076716.44$0
Feb 199519790816.58$3,266
Jan 1995099415.92$0
Dec 199419693815.03$2,946
Nov 19943851,06615.90$6,122
Oct 199419386215.58$3,007
Sep 1994066515.29$0
Aug 19941941,00416.13$3,129
Jul 19941951,00517.56$3,424
Jun 1994081517.09$0
May 199439593015.88$6,273
Apr 1994095714.14$0
Mar 19943981,02712.46$4,959
Feb 1994065012.50$0
Jan 199440392112.66$5,102
Dec 1993096412.33$0
Nov 19933951,07514.49$5,724
Oct 19931971,44315.85$3,122
Sep 199301,51815.03$0
Aug 19933851,47815.66$6,029
Jul 19931941,55315.46$2,999
Jun 19931881,46016.79$3,157
May 19933911,26217.68$6,913
Apr 19934011,22418.05$7,238
Mar 19931961,20418.14$3,555
Feb 199319799517.90$3,526
Jan 19931961,37916.93$3,318

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2006 — as filed, then multipliedworked
Oil                  146 bbl  × $ 54.90 =     $8,015
Casinghead gas         0 Mcf  × $  6.01 =         $0

────────────────────────────────────────────────────
Month total                                   $8,015

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/6713 is the state's own key, not one this site invented.