PAULA

Operated by PONY OIL COMPANY (P-5 670465) in the CANYON (BASAL MORROW) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6760District 10Field 15455025OilCasinghead gasSaveExport
Value, all time
$251 k
Jan 1993 – Apr 2001
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
100
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1990-12-04
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,625 bbl$250,323
Casinghead gasProduction1,156 Mcf$1,167
Total$251,490

662 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3880, -102.0688. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.38804, -102.06880 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,600 ft
1 wells filed one
Completion to plug
10.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,600 ft.

Completions filed
Dec 1990
1 of 1 wells
Plug dates filed
Feb 2001
1 of 1 wells

Last completion to plug: a median of 10.2 years across the 1 well that filed both dates, with the middle half between 10.2 years and 10.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4213049615,600 ftDec 1990Feb 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (100)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

100 months

Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 2001120027.755.77$3,330
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20001921327.622.73$5,338
Jan 20001961325.272.48$4,985
Dec 19991661324.282.42$4,062
Nov 199901323.192.43$32
Oct 19993811320.982.80$8,030
Sep 199901321.752.62$34
Aug 19991901319.262.88$3,697
Jul 199901317.892.37$31
Jun 199901315.942.36$31
May 199901315.792.32$30
Apr 199901315.102.21$29
Mar 19993701312.471.84$4,638
Feb 19990139.981.82$24
Jan 199901310.381.90$25
Dec 19980139.201.77$23
Nov 199801310.892.19$28
Oct 199801312.421.97$26
Sep 199801312.592.08$27
Aug 199801311.301.91$25
Jul 199801311.742.24$29
Jun 199801311.242.24$29
May 199801312.622.21$29
Apr 199801313.042.51$33
Mar 199801312.802.31$30
Feb 19981881313.952.30$2,652
Jan 199801314.702.15$28
Dec 199701316.322.41$31
Nov 19971861318.193.09$3,423
Oct 199701319.253.15$41
Sep 19971821317.742.95$3,267
Aug 19973411317.862.55$6,123
Jul 19971851317.582.25$3,282
Jun 199701317.242.26$29
May 199701318.972.31$30
Apr 199701317.882.08$27
Mar 19971901318.951.94$3,626
Feb 199701320.492.21$29
Jan 19971891323.483.54$4,484
Dec 199601323.32$0
Nov 199601321.97$0
Oct 19961781323.31$4,149
Sep 199601322.22$0
Aug 19963271320.26$6,625
Jul 199601319.55$0
Jun 199601318.73$0
May 199601319.43$0
Apr 19961901321.51$4,087
Mar 199601319.38$0
Feb 19961941316.98$3,294
Jan 199601317.07$0
Dec 199501317.19$0
Nov 199501316.00$0
Oct 199501315.43$0
Sep 19953461316.18$5,598
Aug 19953581315.92$5,699
Jul 199501315.24$0
Jun 19953141316.41$5,153
May 19951641317.56$2,880
Apr 19951911317.73$3,386
Mar 19953651316.44$6,001
Feb 199501316.58$0
Jan 19951751315.92$2,786
Dec 19943591315.03$5,396
Nov 19943461315.90$5,501
Oct 199401315.58$0
Sep 19941871315.29$2,859
Aug 19943451316.13$5,565
Jul 19941741517.56$3,055
Jun 19948871517.09$15,159
May 199401515.88$0
Apr 199401514.14$0
Mar 19945271512.46$6,566
Feb 199401512.50$0
Jan 19944941512.66$6,254
Dec 19933631512.33$4,476
Nov 199301514.49$0
Oct 19937481515.85$11,856
Sep 19933821515.03$5,741
Aug 199301515.66$0
Jul 19935771515.46$8,920
Jun 19937561516.79$12,693
May 19931791517.68$3,165
Apr 19933801518.05$6,859
Mar 19933701518.14$6,712
Feb 19931,0971517.90$19,636
Jan 19935761516.93$9,752

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2001 — as filed, then multipliedworked
Oil                  120 bbl  × $ 27.75 =     $3,330
Casinghead gas         0 Mcf  × $  5.77 =         $0

────────────────────────────────────────────────────
Month total                                   $3,330

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/6760 is the state's own key, not one this site invented.