Operated by SANCHEZ PRODUCTION, LLC (P-5 747019) in the PANHANDLE CARSON COUNTY FIELD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7118District 10Field 68845001OilCasinghead gasSaveExport
Value, all time
$3.7 M
Jul 1996 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
359
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 580 leases and 3,796 wells, and the rule below applies to all of them.

Discovered
1921-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1989-05-01.

The Commission's schedule remark for this field reads: SPECIAL TESTING REQUIREMENTS FOR WELLS WITH GOR GREATER THAN 5000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition94,903 bbl$3,390,153
Casinghead gasProduction65,118 Mcf$320,666
Total$3,710,819

377 Mcf of this lease's gas, across 6 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (5)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5858, -101.1914. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

35.58631, -101.19158 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
40.0%
2 of 5 wells
With a plug date
20.0%
1 of 5 wells
Median depth
3,141 ft
4 wells filed one
Completion to plug
22.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
240.0%
A plug date is filed
120.0%
BothOn the schedule and plugged. Neither fact cancels the other.
120.0%
NeitherNo plug date, and not on the schedule.
360.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 3,091 and 3,188 ft, median 3,141 ft, over the 4 wells that filed a depth.

Completions filed
Sep 1989 – Sep 1998
4 of 5 wells; 1 filed none
Plug dates filed
Jun 2012
1 of 5 wells; 4 filed none

Last completion to plug: a median of 22.8 years across the 1 well that filed both dates, with the middle half between 22.8 years and 22.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

5 wells

42-065812493
42-0653199943,188 ftSep 1998Yes
42-0653199013,091 ftJul 1996
42-0653193183,116 ftAug 1990
42-0658048223,165 ftSep 1989Jun 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (359)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

359 months

May 202600106.413.05$0
Apr 202604698.932.87$132
Mar 202601589.753.15$47
Feb 20260363.503.75$11
Jan 202603059.138.00$240
Dec 20250256.664.41$9
Nov 20250158.593.93$4
Oct 202502159.383.30$69
Sep 202501062.743.08$31
Aug 202508363.933.01$250
Jul 202505166.743.32$169
Jun 202506066.483.13$188
May 20250360.553.23$10
Apr 202502062.363.54$71
Mar 20251541367.704.27$10,481
Feb 202502170.884.34$91
Jan 202501374.324.28$56
Dec 202405068.993.12$156
Nov 202407669.052.20$167
Oct 2024037371.372.28$851
Sep 202406369.612.36$149
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 202401176.091.78$20
Jan 20240173.023.30$3
Dec 202306571.262.61$170
Nov 202304477.892.81$124
Oct 202301185.443.09$34
Sep 202301689.042.74$44
Aug 202305980.522.67$158
Jul 20231767074.852.64$13,359
Jun 202302068.962.26$45
May 20230470.622.23$9
Apr 20230278.122.24$4
Mar 20230272.852.39$5
Feb 20230275.112.47$5
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 202204785.005.65$265
Oct 20220187.185.86$6
Sep 20220184.888.16$8
Aug 202207794.529.13$703
Jul 2022070101.587.54$528
Jun 20220126115.097.98$1,005
May 2022030109.378.43$253
Apr 202202104.226.84$14
Mar 2022010108.885.08$51
Feb 20220191.054.86$5
Jan 20220181.844.54$5
Dec 202105071.323.90$195
Nov 202107577.435.24$393
Oct 2021010079.795.71$571
Sep 202115610369.865.35$11,449
Aug 2021012066.024.22$506
Jul 20211704770.783.98$12,220
Jun 202106369.493.38$213
May 202106763.483.02$202
Apr 202103760.362.76$102
Mar 202101761.302.72$46
Feb 2021010557.805.55$583
Jan 202102650.412.81$73
Dec 202007644.642.68$203
Nov 202007638.772.71$206
Oct 20201706736.972.48$6,451
Sep 2020011837.091.99$235
Aug 2020011039.982.39$262
Jul 202017312038.371.83$6,857
Jun 2020012134.901.69$205
May 2020011716.921.81$212
Apr 202006414.751.80$115
Mar 20200130.341.86$2
Feb 202002249.881.98$44
Jan 20200257.252.09$4
Dec 201904759.012.30$108
Nov 201902255.302.75$61
Oct 201904453.472.42$106
Sep 2019013455.052.66$356
Aug 2019012953.112.30$297
Jul 20195517556.272.46$3,525
Jun 2019014352.782.49$356
May 2019013258.482.74$362
Apr 2019010862.632.75$297
Mar 201901556.803.06$46
Feb 2019543450.852.79$2,841
Jan 201905246.033.23$168
Dec 201803646.594.19$151
Nov 20180452.934.24$17
Oct 201809361.443.40$316
Sep 2018012559.543.11$389
Aug 2018011859.403.07$362
Jul 2018013265.142.93$387
Jun 2018012660.183.08$388
May 20181686265.382.90$11,164
Apr 201804763.842.90$136
Mar 201801361.222.79$36
Feb 201801161.782.77$30
Jan 201805862.874.01$233
Dec 20170457.272.92$12
Nov 2017905455.423.12$5,156
Oct 201701749.292.98$51
Sep 201705047.523.09$154
Aug 201704345.373.00$129
Jul 2017896243.873.09$4,096
Jun 201705442.493.09$167
May 201702245.373.26$72
Apr 201702347.933.21$74
Mar 20170946.772.98$27
Feb 20170350.452.95$9
Jan 2017801249.413.42$3,994
Dec 201602448.763.72$89
Nov 20160942.492.64$24
Oct 2016012146.193.09$374
Sep 2016012541.553.10$388
Aug 201610710241.442.92$4,732
Jul 201609541.622.92$278
Jun 201608345.352.69$223
May 20161414042.521.99$6,075
Apr 2016010536.561.99$209
Mar 2016012733.011.79$228
Feb 201606326.472.06$130
Jan 20161137427.352.36$3,266
Dec 201505632.362.00$112
Nov 201505338.792.17$115
Oct 2015014843.552.43$359
Sep 201510715042.992.76$5,014
Aug 2015010440.162.87$299
Jul 2015010348.152.95$303
Jun 2015011056.152.88$317
May 201515711455.212.96$9,005
Apr 201509849.822.71$265
Mar 201507842.892.93$229
Feb 201508144.662.98$241
Jan 20151214243.433.10$5,385
Dec 201407254.693.59$259
Nov 201416012170.464.25$11,788
Oct 2014047678.303.90$1,857
Sep 2014051486.164.05$2,079
Aug 201410113089.394.04$9,553
Jul 2014011996.564.18$497
Jun 201408598.164.74$403
May 20149112994.734.73$9,230
Apr 2014013995.944.81$668
Mar 201413412295.895.06$13,466
Feb 2014011697.406.19$718
Jan 201412311490.404.86$11,673
Dec 201309991.824.35$431
Nov 201310810988.853.74$10,003
Oct 2013012397.423.78$465
Sep 2013104170104.113.72$11,459
Aug 20130145104.253.52$511
Jul 2013177162102.523.72$18,748
Jun 201308294.403.93$323
May 20131044394.834.15$10,041
Apr 201302293.964.28$94
Mar 20131092193.623.91$10,287
Feb 201302291.233.42$75
Jan 20131802991.603.42$16,587
Dec 20121447286.773.42$12,741
Nov 2012010386.953.62$373
Oct 2012668089.383.40$6,171
Sep 20121805994.672.92$17,213
Aug 201204692.662.91$134
Jul 201217711385.133.02$15,409
Jun 201213112679.822.52$10,774
May 2012013091.612.49$323
Apr 201210280101.652.00$10,528
Mar 2012179130105.052.22$19,093
Feb 2012090101.102.57$231
Jan 201218011898.092.73$17,979
Dec 201103396.873.24$107
Nov 20111486495.723.31$14,378
Oct 2011019684.983.65$715
Sep 20119818183.623.99$8,916
Aug 201117917283.404.15$15,642
Jul 201117923994.144.52$17,931
Jun 2011549292.904.64$5,443
May 201112513498.134.40$12,857
Apr 2011179109105.964.33$19,439
Mar 201118210096.364.06$17,943
Feb 2011013285.644.18$552
Jan 20118820486.504.59$8,548
Dec 201017219785.734.35$15,602
Nov 2010020980.843.80$793
Oct 20109027378.103.51$7,987
Sep 201017831972.633.98$14,198
Aug 2010031673.684.42$1,397
Jul 201035240772.554.74$27,465
Jun 201017738570.364.91$14,344
May 201036032771.124.24$26,988
Apr 201026822481.694.12$22,816
Mar 201035725378.394.39$29,096
Feb 201017429573.585.44$14,408
Jan 201032810274.365.96$24,998
Dec 20091668771.445.48$12,336
Nov 200916429274.593.75$13,328
Oct 200935132772.544.11$26,806
Sep 200935035865.543.06$24,036
Aug 200917717167.423.22$12,484
Jul 200934227661.133.46$21,863
Jun 200917720866.163.90$12,520
May 200918137454.743.93$11,376
Apr 200917829246.773.59$9,373
Mar 200934626542.144.06$15,656
Feb 200916922532.814.63$6,587
Jan 200916823635.865.37$7,292
Dec 200851721537.105.98$20,466
Nov 200817319355.496.86$10,924
Oct 200833720075.246.92$26,740
Sep 2008353251101.767.88$37,898
Aug 2008177231114.228.48$22,177
Jul 2008274264131.0811.39$38,923
Jun 2008356298131.3313.03$50,637
May 2008346316123.1711.57$46,274
Apr 2008355276110.3110.45$42,046
Mar 2008351194101.909.66$37,642
Feb 200834216192.538.77$33,057
Jan 200827320890.388.21$26,381
Dec 200716721288.337.30$16,299
Nov 200745124991.677.29$43,159
Oct 2007028282.856.92$1,952
Sep 200717933775.846.24$15,680
Aug 200734237369.066.39$26,001
Jul 20078230770.906.39$7,775
Jun 200735929862.007.55$24,507
May 200734938158.747.85$23,490
Apr 200735031859.617.81$23,346
Mar 200753434456.927.30$32,907
Feb 200716734055.108.22$11,995
Jan 200753733150.306.73$29,238
Dec 200618322856.656.92$11,944
Nov 200610841254.207.62$8,992
Oct 200635647054.906.01$22,371
Sep 200635049260.085.04$23,506
Aug 200644560068.717.34$34,980
Jul 200635865669.376.34$28,995
Jun 200635145266.286.38$26,150
May 200634946566.016.42$26,025
Apr 200640936264.397.36$29,000
Mar 200636224856.707.08$22,282
Feb 200636628257.597.75$23,264
Jan 200634750460.598.93$25,527
Dec 200536740754.9413.42$25,623
Nov 200529637354.6910.59$20,138
Oct 200534640358.3413.80$25,745
Sep 200534835261.4512.08$25,636
Aug 200535744561.519.80$26,319
Jul 200519645355.697.84$14,468
Jun 200536033452.337.38$21,304
May 200553737545.226.65$26,777
Apr 200535945449.207.36$21,004
Mar 200554446150.377.15$30,700
Feb 200536743345.226.31$19,329
Jan 200554444743.166.32$26,305
Dec 200436634039.866.75$16,884
Nov 200436734945.286.33$18,827
Oct 200427235649.706.52$15,838
Sep 200426435643.245.28$13,296
Aug 200435941242.375.55$17,498
Jul 200436143638.286.08$16,472
Jun 200436144636.106.43$15,901
May 200436143337.486.49$16,342
Apr 200436141634.475.86$14,881
Mar 200443550634.365.53$17,745
Feb 200436236232.455.51$13,741
Jan 200436448232.036.30$14,695
Dec 200354624030.266.30$18,034
Nov 200335840628.804.60$12,176
Oct 200336242428.174.76$12,216
Sep 200335755226.314.75$12,014
Aug 200335947429.765.13$13,115
Jul 200335757929.415.17$13,493
Jun 200317850228.565.98$8,087
May 200335962126.595.97$13,255
Apr 200353938926.675.41$16,479
Mar 200372244031.146.10$25,165
Feb 200335826033.487.93$14,047
Jan 200372646930.315.58$24,623
Dec 200272724926.914.85$20,772
Nov 200236319524.664.14$9,758
Oct 200254720826.464.23$15,353
Sep 200253518027.443.64$15,335
Aug 200253615025.963.16$14,389
Jul 200271742024.583.06$18,910
Jun 200253626123.733.34$13,591
May 200271917324.663.58$18,351
Apr 200289715123.653.51$21,744
Mar 20025451122.003.10$12,024
Feb 200254913218.222.38$10,316
Jan 200254618117.172.38$9,805
Dec 200154121616.932.36$9,670
Nov 200168319918.072.41$12,821
Oct 200172523419.782.53$14,932
Sep 200135719924.262.25$9,109
Aug 200170220724.873.05$18,091
Jul 200153125823.933.20$13,532
Jun 200153422124.563.82$13,960
May 200172215525.524.31$19,093
Apr 200171922524.685.34$18,945
Mar 200172231424.545.38$19,406
Feb 200169623327.755.77$20,658
Jan 20011,01526027.478.40$30,066
Dec 2000546426.889.12$14,713
Nov 20008663032.215.66$28,064
Oct 200071143831.235.15$24,458
Sep 200053643631.875.19$19,344
Aug 200088550829.644.54$28,538
Jul 200089543228.534.09$27,301
Jun 200089820229.304.40$27,200
May 200067831327.263.68$19,634
Apr 200072215824.513.12$18,189
Mar 200089920228.422.86$26,127
Feb 200090917927.622.73$25,595
Jan 200063314825.272.48$16,363
Dec 199973311524.282.42$18,076
Nov 199968825423.192.43$16,573
Oct 199972628920.982.80$16,042
Sep 199985228121.752.62$19,267
Aug 199988433919.262.88$18,001
Jul 19991,05629417.892.37$19,589
Jun 199971018315.942.36$11,750
May 199983221915.792.32$13,646
Apr 199971130515.102.21$11,410
Mar 199988724012.471.84$11,502
Feb 19997212629.981.82$7,672
Jan 199990123410.381.90$9,797
Dec 19988912959.201.77$8,720
Nov 19981,07039510.892.19$12,516
Oct 199887740912.421.97$11,698
Sep 199888991012.592.08$13,088
Aug 199889245311.301.91$10,944
Jul 19981,07235811.742.24$13,386
Jun 19981,06649511.242.24$13,089
May 199889853412.622.21$12,511
Apr 19981,07554413.042.51$15,381
Mar 19981,05355512.802.31$14,760
Feb 19981,24763013.952.30$18,844
Jan 199889953714.702.15$14,372
Dec 19971,455616.322.41$23,760
Nov 19977162618.193.09$13,104
Oct 19973573819.253.15$6,992
Sep 19977054717.742.95$12,646
Aug 19977207217.862.55$13,043
Jul 19977207817.582.25$12,833
Jun 19978877217.242.26$15,454
May 19978837618.972.31$16,926
Apr 19973547017.882.08$6,475
Mar 19976214318.951.94$11,851
Feb 19978951620.492.21$18,374
Jan 19977091223.483.54$16,690
Dec 19965341623.32$12,453
Nov 19965379321.97$11,798
Oct 19965404823.31$12,587
Sep 19965357522.22$11,888
Aug 19967098120.26$14,364
Jul 19963366419.55$6,569

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $ 98.93 =         $0
Casinghead gas        46 Mcf  × $  2.87 =       $132

────────────────────────────────────────────────────
Month total                                     $132

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/7118 is the state's own key, not one this site invented.