COURSON RANCH 3

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the LIPS (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7368District 10Field 53847332OilCasinghead gasSaveExport
Value, all time
$3.1 M
Aug 2000 – May 2026
Value, last 12 filed months
$24 k
at the published price for each month
Months reported
310
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 37 leases and 40 wells, and the rule below applies to all of them.

Discovered
1958-02-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-05-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/2000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition5,337 bbl$256,777
Casinghead gasProduction573,119 Mcf$2,881,873
Total$3,138,649

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.0214, -100.8011. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.02143, -100.80107 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,200 ft.

Completions filed
Aug 2000
1 of 1 wells

1 well

42-3933146817,200 ftAug 2000

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (310)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

310 months

May 2026019106.413.05$58
Apr 202608798.932.87$250
Mar 2026024189.753.15$759
Feb 2026031263.503.75$1,170
Jan 2026058059.138.00$4,639
Dec 2025064956.664.41$2,864
Nov 2025065558.593.93$2,572
Oct 2025065559.383.30$2,165
Sep 2025073362.743.08$2,255
Aug 2025075463.933.01$2,273
Jul 2025070366.743.32$2,331
Jun 2025073466.483.13$2,296
May 2025074660.553.23$2,411
Apr 2025082462.363.54$2,920
Mar 2025097567.704.27$4,162
Feb 2025095770.884.34$4,154
Jan 20251701,20474.324.28$17,786
Dec 202401,34968.993.12$4,211
Nov 202401,39469.052.20$3,065
Oct 202401,35671.372.28$3,094
Sep 20240869.612.36$19
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240578.082.63$13
May 2024055678.812.20$1,222
Apr 202401,28584.451.66$2,132
Mar 2024026480.301.55$408
Feb 202404276.091.78$75
Jan 2024013373.023.30$439
Dec 2023012971.262.61$337
Nov 2023012177.892.81$340
Oct 2023013385.443.09$411
Sep 2023012489.042.74$339
Aug 202307880.522.67$208
Jul 2023060474.852.64$1,596
Jun 2023060468.962.26$1,364
May 2023048970.622.23$1,089
Apr 2023056078.122.24$1,253
Mar 2023058772.852.39$1,405
Feb 2023052575.112.47$1,294
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 2022058085.005.65$3,275
Oct 2022058287.185.86$3,413
Sep 2022065284.888.16$5,323
Aug 2022061994.529.13$5,650
Jul 20220693101.587.54$5,227
Jun 20220675115.097.98$5,385
May 20220710109.378.43$5,987
Apr 20220639104.226.84$4,369
Mar 20220692108.885.08$3,513
Feb 2022069091.054.86$3,353
Jan 20220081.844.54$0
Dec 2021076271.323.90$2,971
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 2021077669.493.38$2,623
May 2021085863.483.02$2,589
Apr 2021083660.362.76$2,306
Mar 20210061.302.72$0
Feb 2021080757.805.55$4,477
Jan 2021082350.412.81$2,313
Dec 2020080744.642.68$2,159
Nov 20201561,01938.772.71$8,806
Oct 2020083636.972.48$2,072
Sep 2020083237.091.99$1,657
Aug 2020088439.982.39$2,108
Jul 2020087038.371.83$1,588
Jun 2020090734.901.69$1,533
May 2020097216.921.81$1,764
Apr 2020091614.751.80$1,653
Mar 2020099230.341.86$1,841
Feb 2020092149.881.98$1,824
Jan 202001,00557.252.09$2,105
Dec 201901,02459.012.30$2,360
Nov 201901,03455.302.75$2,844
Oct 201901,13453.472.42$2,743
Sep 2019091155.052.66$2,421
Aug 201901,04253.112.30$2,401
Jul 201901,10356.272.46$2,713
Jun 201901,22452.782.49$3,049
May 201901,16858.482.74$3,201
Apr 201901,23262.632.75$3,389
Mar 201901,30756.803.06$4,002
Feb 201901,09350.852.79$3,052
Jan 20192811,29446.033.23$17,112
Dec 201801,34246.594.19$5,617
Nov 201801,26252.934.24$5,347
Oct 201801,38761.443.40$4,713
Sep 201801,43959.543.11$4,472
Aug 201801,25759.403.07$3,855
Jul 201801,42665.142.93$4,181
Jun 201801,44460.183.08$4,443
May 201801,30365.382.90$3,780
Apr 201801,44363.842.90$4,186
Mar 201801,39161.222.79$3,876
Feb 201801,33261.782.77$3,684
Jan 201811,56462.874.01$6,333
Dec 201701,37457.272.92$4,014
Nov 201701,45455.423.12$4,534
Oct 201711,53049.292.98$4,614
Sep 201701,50147.523.09$4,634
Aug 201701,47045.373.00$4,416
Jul 201701,44943.873.09$4,473
Jun 201701,56542.493.09$4,832
May 201701,60845.373.26$5,248
Apr 201701,64147.933.21$5,270
Mar 2017081646.772.98$2,435
Feb 201701,52850.452.95$4,512
Jan 201701,60849.413.42$5,497
Dec 201621,60248.763.72$6,061
Nov 201601,76742.492.64$4,673
Oct 201601,59046.193.09$4,914
Sep 201601,80741.553.10$5,603
Aug 20160041.442.92$0
Jul 201601,61641.622.92$4,726
Jun 201641,76545.352.69$4,922
May 201601,45742.521.99$2,901
Apr 201602,01436.561.99$4,010
Mar 201601,62433.011.79$2,913
Feb 201601,42426.472.06$2,939
Jan 201601,23927.352.36$2,929
Dec 201501,44632.362.00$2,894
Nov 201501,68238.792.17$3,645
Oct 201501,63943.552.43$3,977
Sep 201502,03942.992.76$5,624
Aug 201501,13040.162.87$3,246
Jul 2015015348.152.95$451
Jun 201501056.152.88$29
May 201502155.212.96$62
Apr 201508349.822.71$225
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 201505343.433.10$164
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201401,39178.303.90$5,426
Sep 201401,88586.164.05$7,626
Aug 201401,60089.394.04$6,456
Jul 201401,56596.564.18$6,541
Jun 201401,50798.164.74$7,138
May 201401,66094.734.73$7,846
Apr 201401,88295.944.81$9,051
Mar 201401,44095.895.06$7,282
Feb 20141801,86697.406.19$29,086
Jan 201401,42090.404.86$6,902
Dec 201301,72591.824.35$7,511
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201301,810104.253.52$6,376
Jul 201301,845102.523.72$6,859
Jun 201301,37994.403.93$5,424
May 201301,61094.834.15$6,680
Apr 201301,46293.964.28$6,261
Mar 201301,75893.623.91$6,879
Feb 201301,69491.233.42$5,793
Jan 201301,89691.603.42$6,484
Dec 201201,92686.773.42$6,587
Nov 201201,63586.953.62$5,927
Oct 201201,66589.383.40$5,660
Sep 201201,94294.672.92$5,668
Aug 201201,59792.662.91$4,644
Jul 201201,28185.133.02$3,870
Jun 201201,89979.822.52$4,784
May 201202,02991.612.49$5,049
Apr 201201,978101.652.00$3,950
Mar 20121762,273105.052.22$23,540
Feb 201201,553101.102.57$3,992
Jan 201202,15898.092.73$5,900
Dec 201102,20496.873.24$7,140
Nov 201102,12595.723.31$7,036
Oct 201102,28684.983.65$8,341
Sep 201102,27083.623.99$9,048
Aug 201102,34383.404.15$9,722
Jul 201102,36694.144.52$10,688
Jun 201101,97392.904.64$9,154
May 20111882,39598.134.40$28,998
Apr 201102,462105.964.33$10,669
Mar 201102,52796.364.06$10,253
Feb 201102,29585.644.18$9,593
Jan 201102,52986.504.59$11,605
Dec 201002,62385.734.35$11,404
Nov 2010022380.843.80$846
Oct 2010021178.103.51$740
Sep 2010090772.633.98$3,609
Aug 201001,13673.684.42$5,020
Jul 201001,59872.554.74$7,569
Jun 201001,89370.364.91$9,295
May 201002,54571.124.24$10,779
Apr 201002,48081.694.12$10,224
Mar 201002,55778.394.39$11,222
Feb 201002,31873.585.44$12,615
Jan 201002,54674.365.96$15,185
Dec 200902,58471.445.48$14,170
Nov 200902,48374.593.75$9,315
Oct 200902,57172.544.11$10,567
Sep 200902,41565.543.06$7,401
Aug 200902,65167.423.22$8,532
Jul 200902,70461.133.46$9,368
Jun 20091872,56066.163.90$22,343
May 200902,65454.743.93$10,419
Apr 200902,50046.773.59$8,969
Mar 200902,62742.144.06$10,663
Feb 200902,33832.814.63$10,832
Jan 200902,52035.865.37$13,535
Dec 200802,60537.105.98$15,570
Nov 200802,48655.496.86$17,055
Oct 200802,66175.246.92$18,419
Sep 20081892,677101.767.88$40,320
Aug 200802,770114.228.48$23,498
Jul 200802,744131.0811.39$31,253
Jun 200802,669131.3313.03$34,784
May 200802,750123.1711.57$31,829
Apr 200802,645110.3110.45$27,653
Mar 200802,668101.909.66$25,784
Feb 200802,53092.538.77$22,190
Jan 200802,65190.388.21$21,753
Dec 200702,67188.337.30$19,504
Nov 20071872,66191.677.29$36,546
Oct 200702,68982.856.92$18,613
Sep 200702,74075.846.24$17,109
Aug 200702,75369.066.39$17,586
Jul 200702,80870.906.39$17,937
Jun 200702,46462.007.55$18,599
May 200702,34258.747.85$18,376
Apr 200702,33359.617.81$18,210
Mar 200702,42256.927.30$17,685
Feb 200702,48655.108.22$20,425
Jan 20071932,25050.306.73$24,843
Dec 200602,69656.656.92$18,652
Nov 200601,79354.207.62$13,658
Oct 200602,57554.906.01$15,486
Sep 200602,74560.085.04$13,827
Aug 200602,57568.717.34$18,900
Jul 200602,18269.376.34$13,840
Jun 200602,81366.286.38$17,958
May 200602,86666.016.42$18,414
Apr 20061892,96264.397.36$33,971
Mar 200603,08656.707.08$21,858
Feb 200602,48657.597.75$19,269
Jan 200603,07560.598.93$27,470
Dec 200503,07854.9413.42$41,293
Nov 200503,02054.6910.59$31,977
Oct 200503,12258.3413.80$43,070
Sep 200503,06661.4512.08$37,034
Aug 20051952,94661.519.80$40,856
Jul 200503,15955.697.84$24,778
Jun 200502,95952.337.38$21,841
May 200503,02645.226.65$20,126
Apr 200503,01249.207.36$22,170
Mar 200503,14450.377.15$22,495
Feb 20051882,74045.226.31$25,796
Jan 200502,95643.166.32$18,688
Dec 200403,17039.866.75$21,401
Nov 200402,93145.286.33$18,554
Oct 200403,11949.706.52$20,321
Sep 200402,99143.245.28$15,804
Aug 20041883,11842.375.55$25,273
Jul 200403,15538.286.08$19,196
Jun 200402,70936.106.43$17,427
May 200403,19037.486.49$20,718
Apr 20041893,19434.475.86$25,227
Mar 200403,11734.365.53$17,237
Feb 200402,38832.455.51$13,157
Jan 200403,17032.036.30$19,970
Dec 20031903,06930.266.30$25,089
Nov 200303,09228.804.60$14,208
Oct 200303,23728.174.76$15,407
Sep 200303,18826.314.75$15,141
Aug 200303,29029.765.13$16,877
Jul 20031863,34529.415.17$22,767
Jun 200303,26828.565.98$19,552
May 200303,38526.595.97$20,218
Apr 200303,31526.675.41$17,925
Mar 20031893,47631.146.10$27,075
Feb 200303,17933.487.93$25,196
Jan 200303,55930.315.58$19,866
Dec 200203,49626.914.85$16,969
Nov 20021913,53624.664.14$19,338
Oct 200203,72226.464.23$15,741
Sep 200203,64927.443.64$13,265
Aug 200203,82725.963.16$12,109
Jul 20021883,88224.583.06$16,507
Jun 200203,78123.733.34$12,622
May 200203,99724.663.58$14,325
Apr 200203,94723.653.51$13,863
Mar 20021884,11422.003.10$16,901
Feb 200203,74918.222.38$8,906
Jan 20021934,19417.172.38$13,277
Dec 200104,22116.932.36$9,980
Nov 200104,14918.072.41$9,981
Oct 200104,35119.782.53$11,003
Sep 20011884,31224.262.25$14,269
Aug 200104,45524.873.05$13,602
Jul 20011884,48723.933.20$18,844
Jun 200104,44324.563.82$16,991
May 200104,59525.524.31$19,792
Apr 20011933,19824.685.34$21,826
Mar 20011924,56424.545.38$29,250
Feb 200104,02527.755.77$23,213
Jan 200104,24827.478.40$35,678
Dec 200004,52126.889.12$41,243
Nov 20001964,49332.215.66$31,735
Oct 20001914,58931.235.15$29,578
Sep 200003,91731.875.19$20,316
Aug 200002,30529.644.54$10,466

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas        19 Mcf  × $  3.05 =        $58

────────────────────────────────────────────────────
Month total                                      $58

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/7368 is the state's own key, not one this site invented.