CHRISTIE-TIPPS 77

Operated by BP AMERICA PRODUCTION COMPANY (P-5 40798) in the ST. CLAIR (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7383District 10Field 79636500OilCasinghead gasSaveExport
Value, all time
$871 k
Mar 2001 – Oct 2014
Value, last 12 filed months
$0
at the published price for each month
Months reported
164
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 210 leases and 255 wells, and the rule below applies to all of them.

Discovered
1974-02-25
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-08-21.

The Commission's schedule remark for this field reads: THE ALLOCATION FORMULA SHALL REMAIN SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,301 bbl$235,748
Casinghead gasProduction127,856 Mcf$634,990
Total$870,738

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.8282, -100.6593. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.82815, -100.65928 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,300 ft.

Completions filed
Aug 2013
1 of 1 wells

1 well

42-39331351507710,300 ftAug 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (164)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

164 months

Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 20131530104.253.52$15,950
Jul 20130347102.523.72$1,290
Jun 2013055394.403.93$2,175
May 2013056494.834.15$2,340
Apr 2013058293.964.28$2,492
Mar 2013048093.623.91$1,878
Feb 2013046591.233.42$1,590
Jan 2013020891.603.42$711
Dec 2012012486.773.42$424
Nov 2012037086.953.62$1,341
Oct 2012040289.383.40$1,367
Sep 2012050494.672.92$1,471
Aug 2012056392.662.91$1,637
Jul 2012053585.133.02$1,616
Jun 2012056679.822.52$1,426
May 2012051291.612.49$1,274
Apr 20120415101.652.00$829
Mar 20120422105.052.22$938
Feb 20120374101.102.57$961
Jan 2012054198.092.73$1,479
Dec 2011051896.873.24$1,678
Nov 2011045795.723.31$1,513
Oct 2011036584.983.65$1,332
Sep 2011033783.623.99$1,343
Aug 2011046483.404.15$1,925
Jul 2011050594.144.52$2,281
Jun 2011042292.904.64$1,958
May 2011041898.134.40$1,841
Apr 20110424105.964.33$1,837
Mar 2011043896.364.06$1,777
Feb 2011048085.644.18$2,006
Jan 2011052286.504.59$2,395
Dec 2010055185.734.35$2,396
Nov 2010053280.843.80$2,019
Oct 2010055878.103.51$1,958
Sep 2010055472.633.98$2,205
Aug 2010056573.684.42$2,497
Jul 2010054672.554.74$2,586
Jun 2010053870.364.91$2,642
May 2010054971.124.24$2,325
Apr 2010053881.694.12$2,218
Mar 2010045078.394.39$1,975
Feb 2010029873.585.44$1,622
Jan 2010030974.365.96$1,843
Dec 2009034271.445.48$1,875
Nov 2009044974.593.75$1,684
Oct 2009042872.544.11$1,759
Sep 2009042865.543.06$1,312
Aug 2009043167.423.22$1,387
Jul 2009039361.133.46$1,362
Jun 2009030966.163.90$1,204
May 2009035754.743.93$1,401
Apr 2009035046.773.59$1,256
Mar 2009032042.144.06$1,299
Feb 2009030532.814.63$1,413
Jan 2009029235.865.37$1,568
Dec 2008028937.105.98$1,727
Nov 2008023255.496.86$1,592
Oct 2008039575.246.92$2,734
Sep 20080405101.767.88$3,190
Aug 20080438114.228.48$3,716
Jul 20080402131.0811.39$4,579
Jun 20080384131.3313.03$5,005
May 2008201422123.1711.57$29,642
Apr 20080416110.3110.45$4,349
Mar 20080414101.909.66$4,001
Feb 2008037192.538.77$3,254
Jan 2008033590.388.21$2,749
Dec 200718337088.337.30$18,866
Nov 2007039691.677.29$2,888
Oct 2007043782.856.92$3,025
Sep 2007045375.846.24$2,829
Aug 2007040269.066.39$2,568
Jul 2007049270.906.39$3,143
Jun 2007044862.007.55$3,382
May 200719949658.747.85$15,581
Apr 2007047959.617.81$3,739
Mar 2007045456.927.30$3,315
Feb 2007037855.108.22$3,106
Jan 2007047450.306.73$3,189
Dec 2006054756.656.92$3,784
Nov 2006054854.207.62$4,174
Oct 2006054554.906.01$3,278
Sep 200617951260.085.04$13,333
Aug 2006046268.717.34$3,391
Jul 2006045269.376.34$2,867
Jun 2006043366.286.38$2,764
May 2006045966.016.42$2,949
Apr 2006041064.397.36$3,018
Mar 2006043056.707.08$3,046
Feb 2006052557.597.75$4,069
Jan 200618656560.598.93$16,317
Dec 2005059554.9413.42$7,982
Nov 2005059954.6910.59$6,342
Oct 2005058758.3413.80$8,098
Sep 2005060161.4512.08$7,259
Aug 2005070461.519.80$6,897
Jul 200518376255.697.84$16,168
Jun 2005035552.337.38$2,620
May 2005040245.226.65$2,674
Apr 2005069549.207.36$5,116
Mar 2005071650.377.15$5,123
Feb 200519665745.226.31$13,010
Jan 2005064843.166.32$4,097
Dec 2004074939.866.75$5,057
Nov 2004078045.286.33$4,938
Oct 2004082149.706.52$5,349
Sep 200418473543.245.28$11,840
Aug 2004085142.375.55$4,724
Jul 2004088538.286.08$5,385
Jun 2004087436.106.43$5,622
May 200419690237.486.49$13,204
Apr 2004089234.475.86$5,226
Mar 2004084834.365.53$4,690
Feb 2004091532.455.51$5,041
Jan 20041931,03232.036.30$12,683
Dec 200301,06230.266.30$6,692
Nov 200301,07228.804.60$4,926
Oct 200301,12128.174.76$5,336
Sep 20032011,07026.314.75$10,370
Aug 200301,19329.765.13$6,120
Jul 200301,26029.415.17$6,515
Jun 20031891,21528.565.98$12,667
May 200301,34526.595.97$8,033
Apr 200301,35426.675.41$7,321
Mar 20031931,39931.146.10$14,538
Feb 200301,31033.487.93$10,383
Jan 20031891,55030.315.58$14,381
Dec 200201,56126.914.85$7,577
Nov 200201,56324.664.14$6,466
Oct 20021961,67926.464.23$12,287
Sep 200201,67827.443.64$6,100
Aug 20020025.963.16$0
Jul 2002189024.583.06$4,646
Jun 20021901,85023.733.34$10,684
May 200202,00624.663.58$7,190
Apr 20021901,88723.653.51$11,121
Mar 200201,95522.003.10$6,066
Feb 200201,85318.222.38$4,402
Jan 20021802,16917.172.38$8,243
Dec 200102,10916.932.36$4,987
Nov 20011902,24318.072.41$8,829
Oct 20011922,39919.782.53$9,865
Sep 200102,62924.262.25$5,919
Aug 20011923,10524.873.05$14,255
Jul 20013673,44723.933.20$19,803
Jun 20011993,94624.563.82$19,978
May 20013955,03825.524.31$31,781
Apr 20015516,66224.685.34$49,143
Mar 20014455,58224.545.38$40,932

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2013 — as filed, then multipliedworked
Oil                  153 bbl  × $104.25 =    $15,950
Casinghead gas         0 Mcf  × $  3.52 =         $0

────────────────────────────────────────────────────
Month total                                  $15,950

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/7383 is the state's own key, not one this site invented.